Presentation is loading. Please wait.

Presentation is loading. Please wait.

LLP HMA Pavements Inertial Profiler Prebid Meeting Solano 80 - 04-4A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement.

Similar presentations


Presentation on theme: "LLP HMA Pavements Inertial Profiler Prebid Meeting Solano 80 - 04-4A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement."— Presentation transcript:

1 LLP HMA Pavements Inertial Profiler Prebid Meeting Solano 80 - 04-4A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division of Maintenance

2 Overview Inertial Profiler in lieu of California Profilograph Inertial Profiler Specifications –Certification –Calibration –Acceptance Criteria IRI Localized Roughness Analysis Tools Incentive/Disincentive

3 Inertial Profiler in lieu of California Profilograph California Profilograph utilizes a center wheel Inertial Profiler utilizes an accelerometer and laser Measures at highway speed No lane closures required

4 Inertial Profiler Specifications Equipment and Operator certification performed by Texas Transportation Institute In accordance with AASHTO PP 49-08 Local Calibration at the project –5 Runs –0.92 correlation In accordance with AASHTO PP 50-08

5 Inertial Profiler Specifications Index Acceptance Criteria –International Roughness Index (IRI) in lieu of Profile Index –Acceptance between 45.1 and 60 in/mi Bump Acceptance Criteria –Localized Roughness in lieu of bump must grind –IRI of 140 in/mi within a 25 foot measurement

6 Inertial Profiler Specifications Analysis Tools –Vendor analysis tool –Proval analysis tool Provides reports that include data required in the contract

7 Incentive/Disincentive Measurements based on 0.1 mile lots Incentive is paid for IRI < 45.1 in/mi Disincentive pay adjustment for IRI > 60 in/mi Correction required for IRI > 75 in/mi to within the acceptable range


Download ppt "LLP HMA Pavements Inertial Profiler Prebid Meeting Solano 80 - 04-4A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement."

Similar presentations


Ads by Google