State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan Tuesday, May 17, 2011 Little Wekiva River Little Wekiva River.

Similar presentations


Presentation on theme: "State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan Tuesday, May 17, 2011 Little Wekiva River Little Wekiva River."— Presentation transcript:

1 State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan Tuesday, May 17, 2011 Little Wekiva River Little Wekiva River SR 434 Outfall Ditch

2 Civil Rights Statement This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation (FDOT). The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

3 Website Information

4 Project Location Outfall Ditch Existing

5 Project History Routine Maintenance Several Attempts Over the Past Decade to Correct/Prevent Further Erosion Previous Project (Project No ) Constructed in 2002 Included Plantings, Erosion Control Mats, Sand-Cement Ditch Blocks, a Gabion Basket, and Rubble Rip-Rap January 2006 Removal of Overgrowth; Inclusion of Additional Sand-Cement Bags

6 Existing Conditions Ditch has Deepened, Causing Severe Bank Erosion on Both Sides Erosion is Encroaching on the Surrounding Residents’ Backyards Neighbors have Built Retaining Walls Residential Fences are Beginning to Lean and Lose Stability Ditch is Difficult for Florida Department of Transportation to Maintain Hard to Access Costly to Maintain Headwall at SR 434Concrete Block WallExisting Vegetation Growth

7 Existing Conditions (Additional Photos) Steep Bank Slopes Existing Ditch Block Slope Protection (Erosion Mats) Slope Protection (Sand-Cement) Active Stream Existing Fence Line

8 Existing Conditions Slope Protection Provided at Various Ditch Bank Locations Gabion Basket Last Structure Prior to Discharge to Little Wekiva River Structure is Failing Primary Reason for Current Design Project

9 Proposed Design Improvements January 2011 Design Project Underway Install Sheet Piling to Replace Existing Drainage Structures Reduction in Soil Loss and Erosion Prevention Allows Ditch Bottom to Build Up Over Time Geotextile Improvements New Landscape/Maintenance Plan Minimization of Wetland Impacts Permitting Through St. John’s River Water Management District

10 Proposed Design Improvements Sheet Piling Erosion Protection Construct Sheet Piling

11 Proposed Design Improvements 2’ Geotextile Existing Ground Line Steel Sheet Piling Articulating Block

12 Proposed Design Improvements Slope Protection – Landscape Plantings Wiregrass (Aristida stricta) Sand Cord Grass (Spartina bakeri) Pickerel Weed (Pontedaria cordata) WiregrassSand Cord GrassPickerel Weed

13 Proposed Design Improvements Slope Protection - Geotextile Material Articulating Block Articulating Block Samples

14 Proposed Challenges Access Access from State Road 434 Potential Access via Existing Easements Construction Equipment Construction Material Delivery

15 Construction Access Into Ditch

16 Project Schedule ActivityDate Begin Design PhaseJanuary 24, 2011 Public Information MeetingMay 17, % Plans SubmittalJune 24, 2011 Design CompleteSpring 2012 Begin ConstructionEarly 2012 Project Costs Design Cost - $196,000 Construction - $459,000

17 We Want Your Input Please Turn in the Comments Cards Tonight Mail the completed card by May 29, 2011

18 Thank You For Attending! Dennisse Zornan FDOT Project Management 719 South Woodland Boulevard Deland, Florida (386) Stephanie Ghezzi The LPA Group Incorporated 615 Crescent Executive Court, Suite 200 Lake Mary, Florida (407) We appreciate all who attended tonight’s Public Information Meeting The Website for the Project can be Located Under the “Future Projects” Tab For Additional about other FDOT Projects and Programs:


Download ppt "State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan Tuesday, May 17, 2011 Little Wekiva River Little Wekiva River."