Presentation is loading. Please wait.

Presentation is loading. Please wait.

Location The area where the investment will be made is part of the total area of the factory from Negresti Oas, meaning 8 ha. The plant is positioned.

Similar presentations


Presentation on theme: "Location The area where the investment will be made is part of the total area of the factory from Negresti Oas, meaning 8 ha. The plant is positioned."— Presentation transcript:

1

2 Location The area where the investment will be made is part of the total area of the factory from Negresti Oas, meaning 8 ha. The plant is positioned in the north – vest of Romania the border with Hungary and Ukraine. This is a strategic position because: Near the resources of raw materials and natural gas from Ukraine Near a ramified road infrastructure of European Union (130Km to Nyiregyhaza M3 Highway). Good possibilities for qualified workforce

3 In the years 2006-2008, once with the company growth, we reached a level of producing around 15 to 20 machines per year. This was equivalent with a need of casted iron parts of about 1000 – 1200 tons/year. This amount is about the production for two months of the biggest Romanian foundry – Saturn Alba Iulia. Because of this high demand for cast iron parts, and the long delivery time from suppliers (10-12 months), REM Masini Unelte decided to purchase Mecanica Negresti Oas and to built a new, state of the art, cast iron and nodular cast iron foundry with a maximum piece weight of 50 to and 1200 to/month capacity. The built surface for the foundry is in the first stage is 10.000 sqm. In 2010 we will add another 7.000 sqm. The total surface of the plant is 25.000 sqm covered and 30.000 sqm in open air. Once with the foundry we will develop, in another building on the same location, the Machining Division - doped with REM Machine Tools like Plano Milling Machine (FLP 2200x11000), Floor Type Boring Mills (AFP 150, AFC 150), Vertical Lathes (SC70), MRG11.000; - and the Description Of The Foundry Investment Project

4 The foundry is specialized in producing cast iron and nodular cast iron parts with a maximum gross weight of 50 tons at a final estimated capacity of 1.200 tons per month. Our foundry is using the no-bake technique. This method is particularly appropriate for prototype work and small series products.

5 Equipment All the machines we use come from top suppliers such as Inductotherm Europe and IMF Italy, are environment friendly and respect all the regulations in the EU. The lifting equipment is made by Konecranes. Medium frequency induction furnaces: maximum capacity - 28t Medium frequency induction furnaces: maximum capacity - 23t Conveyor carrier for cores Vibrating table for cores

6 Silos with a capacity of 550t Shot blasting chamber (12m x 7m x 7m) with maximum capacity of 56t Continuous mixer for moulds with maximum capacity of 60t/h Continuous mixer for cores with maximum capacity of 10t/h

7 15t electromagnetic bridge crane Specific laboratories: raw materials reception, fast spectrum analyzer, metallographic structure and mechanical testing, ultra sonic inspection. Reclamation tower: capacity 15 - 20t Bridge crane 80/20t Bridge crane 50/20t Shakeout (11m x 4m x 5m), maximum capacity of 120t

8

9

10

11

12 We have pass audits from companies like Klingelnberg, Danomar and Montana MG Romania We are in the process of auditing with General Elactric and Siemens

13 www.rem-foundry.com REM Masini Unelte SRL Strada Republicii nr. 199 600304, Bacau, Romania


Download ppt "Location The area where the investment will be made is part of the total area of the factory from Negresti Oas, meaning 8 ha. The plant is positioned."

Similar presentations


Ads by Google