Presentation is loading. Please wait.

Presentation is loading. Please wait.

EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012.

Similar presentations


Presentation on theme: "EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012."— Presentation transcript:

1 EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012 EASA.2011.OP.28

2 This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC EASA-HighIWC Final Meeting Conclusion - Milestones & Deliverables December 2012EASA.2011.OP.28Page 2 MilestonesDue DateStatus M3.1 : Kick-off meeting M1 OK M1.1: Flight test data measurements of Airbus A340 F/T campaigns at Darwin and Cayenne in 2010. M1 OK M1.2: Literature survey of existing reports and publications dealing with the variety of fundamental scientific issues related to the microphysical properties and structure of deep convective cloud systems over land and over the warm tropical ocean M3 OK M3.2: Progress review meeting 1 M3 OK M1.3: Assessment of the gathered/available data against the environment proposed in the NPA 2011-03 (Appendix P) defining mixed phase and glaciated icing conditions & Gap analysis M6 OK M3.3: Progress review meeting 2 M6 OK M2.1: Falcon 20 Flight Tests Development Plan. M7 OK M3.4: Progress review meeting 3 M7 OK M2.2: Ready to fly aircraft & Demonstration flights M11 OK (HYMEX)

3 This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC EASA-HighIWC Final Meeting Conclusion - Milestones & Deliverables December 2012EASA.2011.OP.28Page 3 DeliverableDue Date Status D3.1: First interim report: Literature survey of existing reports and publications dealing with the variety of fundamental scientific issues related to the microphysical properties and structure of deep convective cloud systems over land and over the warm tropical ocean M3 OK D3.2: Second interim report: Assessment of the gathered/available data against the environment proposed in the NPA 2011-03 (Appendix P) defining mixed phase and glaciated icing conditions M6 OK D3.3: Final report: key conclusions, recommendations and open issues regarding the validation of the environment proposed in the NPA 2011 03 (Appendix P) defining mixed phase and glaciated icing conditions and the necessary steps to achieve a more comprehensive determination of the cloud characteristics at high altitude with the appropriate precision. M11 ON- GOING D3.4: Final presentation & Conclusion of the projectM11 TODAY

4 This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC December 2012 Ice Water Content of clouds at High altitude (EASA HighIWC, EASA.2011.OP.28) This document and the information contained are EASA HighIWC Contractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization Project funded by the European Aviation Safety Agency (EASA) EASA.2011.OP.28Page 4


Download ppt "EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012."

Similar presentations


Ads by Google