Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie.

Similar presentations


Presentation on theme: "Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie."— Presentation transcript:

1 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer Alexander Dierlamm (PhD) Alexander Furgeri (PhD) Bonding & test center Hans Jürgen Simonis Tobias Barvich (techn.) 50% Pia Steck (techn.) NN Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD) Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom) B. Atz (techn.) Group leader: Th. Müller Technical coordinator: P. Blüm Integration & long-term test Stefan Heier (PhD) Valery Zhukov Tobias Barvich (techn.) 50% NNs

2 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik2 1) Readiness of the testing rooms and storage spaces Testing & Storage for QTC & IQC: ready! Bonding & Testing space: ready! Storage module: Space assigned -- Cabinets ordered in workshop Space for pre-prod (~50 modules) ready! Testing & Storage for petals: for pre-prod (ready when needed) for production: available summer-fall (staged)  Assembly & Testing & Storage in new hall!

3 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik3 Operations layout at Karlsruhe Quality test center Visual inspection LAB 010 Probing LAB 326 Irradiation Cyclotron, LAB 325/6 Logistic center Bonding & test center Integration center ~6000 sensors 5 % 1600 modules Bonding qualified & operational Test station operational X-check in progress (already done with Ac in ex-line 1) Fast test LAB 013 Diagnostic LAB 316 Bonding repair LAB 013 storage Longterm test (Petal) Repair modules for 50 petals Clean room (~30m 2 ) tender (to be ready Nov 2003) qualified & operational Irradiation restart April (hopefully) 5 % (present 100%) Hall 245 Integration on petal 1 %

4 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik4 2.) Readiness of Readout I (ARC) Aachen LED array and high voltage card ordered for full cross calibration with KA (FED-based) readout systems. Purpose: reception and testing of hybrids! hyb tested: 2 reprod:fine x-calib:waiting for calib. module Db integration:yes LED:Ac LEDs ordered for x-calib software ver:6.0b

5 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik5 2.) Readiness of Readout II FASTTEST (FED-based) Purpose: fast testing after bonding modules tested: ~15 modules tested (prototype, expressline 1, expressline 2) reprod:fine X-calib I:see above X-calib II:Officially waiting for calib. module Db integration:Done, … to be commissioned LED:4 LED arrays included Cooling:active cooling with Peltiers possible LED readout at -10°C possible cosmics calibration

6 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik6 Fasttest II Bonder ESD Facemask Already moved to final area (bonding lab)!

7 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik7 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 2/3.) Readiness of Readout III Diagnose (FED-based) Purpose: diagnostics of faulty modules modules tested:~5 modules tested (prototype, expressline 1, expressline 2) reprod, X-calib I, X-calib II, Db integration:same state as fasttest (II) LED array:(1050nm and 950nm) Movable LASER:for single strip/pitch scans (1050/650 nm) possibility to set probe needles, tests with a 90 Sr source cosmics high resolution IV possibility to introduce CV.

8 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik8 2/3.) Readiness of Readout DAQ CMS-System Purpose: Module testing development towards petal readout system modules tested: ~1 module tested reprod:fine X-calib:Not yet Db integration:YES software ver: Lt_v.82 installed and tested with Db for one 'old' module. Update to v.90 and x-calibration is foreseen (responsibility of V. Zhukov) This setup will be finally used for the petal assembly! We need another one for the petal longterm testing!

9 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik9 4) Readiness of the LT single module set-up! We have NO dedicated SINGLE LT teststation! KA LT Plan! Use of the Fastteststation (II) with active cooling! –1/day: last bonded module for LT over night –1/week:last bonded module for LT over weekend 4.1) General comments on software! Fastteststation soft 4.2) is the LT single module set-up commissioned? FASTTEST YES 4.3) number of hour of running for the longest run performed20h 4.4) list of missing equipment to enter into production!Ready 4.5) Are results obtained with ARC and LT in your lab in agreement? –Basically YES, –final x-calibration still to be done! The final production LT will be done on petal basis.

10 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik10 Stability: Calibrated with cosmics HITMAP: ~ 20 hours run (7000 events @ 0.1 Hz)

11 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik11 Add. Comments on Cross Calibration ARCS Karlsruhe (for all stations!) Several modules tested in Aachen and Karlsruhe. Full comparison with TEC Expressline I, already presented in several prior meetings (and partially by analysing Expressline II modules) Many basic and analysis results already shown in several meetings! 1.pinhole tests, basic defect analysis 2.TEC Expressline I & II 3.single shot test beam 4.Test of irradiated hybrids --- modules forseen (  active cooling) 5.Ongoing scratch and high leakage current tests 6.Starting of bond tests in high magnetic field @4T Karlsruhe Aachen

12 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik12 Add. NEEDS for petal assembly and petal LT 1 FED 1 FEC 7+1 OEC LV (ordered), HV, LLN cooling plant (ordered) actual need for prototype petal: –4 optical hybrids + 1 OEC (already in house, but requested for X5) –Optical cables –Interconnectboard inc. CCUM

13 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik13

14 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik14 New Hall