Presentation is loading. Please wait.

Presentation is loading. Please wait.

150th FIGHTER WING DEFENSE SYSTEMS EVALUATION (DSE )

Similar presentations


Presentation on theme: "150th FIGHTER WING DEFENSE SYSTEMS EVALUATION (DSE )"— Presentation transcript:

1 150th FIGHTER WING DEFENSE SYSTEMS EVALUATION (DSE )

2 Mission PROVIDE MODERN, HIGH PERFORMANCE FIXED WING TEST SUPPORT AND TRAINING FOR AIR DEFENSE SYSTEMS FOR AIR DEFENSE SYSTEMS OF THE JOINT SERVICES

3 History  USAF decision letter D Phases down 4758 DSES Holloman AFB Reduce Eglin 3246 TW tasking  Summary F-100 DET 1- HMN AFB A-7D/K - KAFB F-16C/D BLK 40 - KAFB 1994-F-16C/D BLK 30 - KAFB

4 Resources  8 BMC pilots 1000 – 3000 hrs experience, Ave 120hrs/yr Active TS security clearances / SCI eligible  32 support personnel  6 F-16C SI-AR (Combat Coded) (188FS = 15 F-16C BI PAA + 2 AR)  600 flying hours per year (Reimbursable, since 1992)

5 Generation Capability  70% MC rate X 6 A/C = 4 A/C (Ideal)  50% MC rate (more sustainable) equates to 2-3 aircraft on a daily basis.  Aircraft used for continuation training when not dedicated to test support.  Intermixing w/ FS = Increased A/C Avail

6 DSE Hours Flown

7 Stores Clearances  Certified thru Seek Eagle (46th FTS) 120 day approval cycle (Minimum) 120 day approval cycle (Minimum) DSE Initiated thru ACC DSE Initiated thru ACC

8 Certified Stores Tracking / Positioning Pods AN/ASQ-T38 -URITS IGI POD - INTERNAL GPS INTEGRATION POD TDARDS-9 -GPS TELEMETRY POD LOCAITS -GPS TELEMETRY POD C-BAND HARD BACK BEACON POD -INSTRUMENTATION POD AIM 9 RETRO POD W/ INTERNAL C BAND CERTIFIED AIS – T.O. F-16C-1-2

9 Certified Stores (Cont) Electronic Emitters / Sensing Pods AN/ALQ-184 (AN.ALQ-131) - PROGRAMMABLE ECM POD VEEP2 (V)-10 -KA BAND ECM POD QRC-335 V400 (LUNEBERG LENS MODIFIED) (ERINT/PAC-3/WSMR) QRC-335 WITH ALE-40 DISPENSING SYSTEM (WSMR) AN/AST-6(V)-10, -20, -30 – ECM POD, RADAR EMMITTER AN/ALQ-167(V) – ECM POD (NAWC) MUSKETEER JENNET – STANDARD INSTRUMENTATION POD

10 Certified Stores (Cont) Countermeasures INTERNAL ALQ-213 – BLK 30 STD (RR-170/188, MJU-7/M-206) W/ PIDS PYLONS AN/ALE-38 & AN/ALE-43 - CHAFF DISPENING POD FIREDRAKE POD - VERTICAL & HORIZONTAL DISPENSING OF M-206/MJU-10/MJU-27/3-88MK-46/OTHER

11 Certified Stores (Cont) Tow / Airlaunch Targets RM - 30B/CMTT - SERIES PODS WITH CM TOWED TARGETS AQM SUPERSONIC AIR-LAUNCHED TARGET SIMULATOR BQM SUBSONIC AIR-LAUNCHED TARGET SIMULATOR *MA SUPERSONIC AIR-LAUNCHED TARGET SIMULATOR

12 AQM-37  Flight Clearance 2 AQM’s, C-Band Beacon, C/L Ext Tank 2 AQM’s, C-Band Beacon, C/L Ext Tank 50,000 ft, 550 kts / 1.8 Mach 50,000 ft, 550 kts / 1.8 Mach  Over 30 Launches to Date 1 st Launch Dec ’98 1 st Launch Dec ’98

13 AQM-37 (Cont)  Facilities Utilized Barking Sands PMRF, HI Barking Sands PMRF, HI Point Mugu NAS, CA Point Mugu NAS, CA Kirtland AFB, NM Kirtland AFB, NM Wallops Flight Facility, VA Wallops Flight Facility, VA  Range Requirements 50,000ft / 1.5 Mach = 50 NM, 4.0 Min 50,000ft / 1.5 Mach = 50 NM, 4.0 Min Cont Fuel (Hold ~15 min / Abort) Cont Fuel (Hold ~15 min / Abort)

14 BQM-74  Flight Clearance 2 BQM’s (or 1 w/ ALQ-167), C-Band Beacon 2 BQM’s (or 1 w/ ALQ-167), C-Band Beacon C/L Ext Tank or Wing Ext Tanks C/L Ext Tank or Wing Ext Tanks Employment 300 kts /.65 Mach Employment 300 kts /.65 Mach 350 kts /.75 Mach (420 kts after launch)350 kts /.75 Mach (420 kts after launch)  Over 25 Launches to Date 1 st Launch Feb ’02 1 st Launch Feb ’02

15 Offstation Support  Required Manning: 4 Specialist (Avionics, Engine, etc) 4 Specialist (Avionics, Engine, etc) 2 Crewchiefs per A/C 2 Crewchiefs per A/C 1 Maintenance Supervisor 1 Maintenance Supervisor 1 Pilot per A/C +1 1 Pilot per A/C +1 ? Misc (Weapons, Security, POL) ? Misc (Weapons, Security, POL)  Equipment

16 TESTFY 04FY 05 POC DSN AEGIS LES PERKINS PATRIOT100180ANGIE DELGADO Pt MUGU TGT’s 25 40BILL WILSON BRIGHT EYES SID BRENNAN PATRIOT- LUT 45 -DON GRAZZIANO RCN FLEET SUP130 80LES PERKINS F-22 OPEVAL 30 50LTC PIERRERA F/A-22 CERT 10120ALAN PALO EUROFIGHTER - 90STEVE BERKEL F-16 Blk 60 CHASE 10 50LOCKHEED MART TOTAL DSE Projections

17 150th FIGHTER WING


Download ppt "150th FIGHTER WING DEFENSE SYSTEMS EVALUATION (DSE )"

Similar presentations


Ads by Google