Presentation is loading. Please wait.

Presentation is loading. Please wait.

HySafe Coordination Committee Meeting, 8 March 2006, Oslo Status of WP5- The H ydrogen I ncident and A ccident D atabase Update March 2005 Christian Kirchsteiger,

Similar presentations


Presentation on theme: "HySafe Coordination Committee Meeting, 8 March 2006, Oslo Status of WP5- The H ydrogen I ncident and A ccident D atabase Update March 2005 Christian Kirchsteiger,"— Presentation transcript:

1 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Status of WP5- The H ydrogen I ncident and A ccident D atabase Update March 2005 Christian Kirchsteiger, EC – DG JRC christian.kirchsteiger@jrc.nl Espen Funnemark, DNV (N) espen.funnemark@dnv.com Ana Vetere, EC – DG JRC ana.vetere@jrc.nl

2 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Objectives - overall: –H2 safety: integrate/share experience and knowledge –common understanding of hydrogen safety and risk –tool for safety and risk assessment –keep the industry updated with recent H2 accidents/incidents –common methodology/format for data collection and storage Objectives – months 13-30: –Software development –Population of HIAD with data Efforts: –Budget: 13.2 MM –Further specification and programming: JRC & DNV –Excel “tool” for data collection (HIAD_Template_4Users.xls): December 05 DJPA months 13-30

3 HySafe Coordination Committee Meeting, 8 March 2006, Oslo HIAD Process

4 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Web Application / User Interface

5 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Screen Layout

6 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Registration /Subscription

7 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Global View of Records

8 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Technical Solution HIAD Characteristics The HIAD system stores its data in a relational database. JRC [1] will implemen the database structure in an Oracle RDBMS. Figure 1 portrays the JRC hard- and software infrastructure used to operate HIAD. [1] [1] The database implementation will be carried out by the JRC-Data Management and Dissemination Team. Data retrieval JRC will implement a web-enabled user interface for the retrieval of HIAD records based on Java server technology (J2EE), which retrieves requested data from the DB server, processes the data as required and then transfers data in HTML format to the browser of the end user..

9 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Data input update (1) COMPLETED HIAD EXCEL FORMS  Thomas Jordan, FZK: 20 events Release: 11 Release: 11 Fire: 6 Fire: 6 Explosion: 3 Explosion: 3  Efthymata Papanikolaou, NCSRD/Demokritos: 8 events Fire: 4 Fire: 4 Explosion: 4 Explosion: 4  Karl Verfondern, Research Center Juelich: 4 events Fire: 1 Fire: 1 Fire&Explosion: 3 Fire&Explosion: 3  Nicolas Dechy, INERIS: 1 event Explosion: 1 Explosion: 1

10 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Data input update (2) MISCELLANEOUS ACCIDENT INFORMATION  EIGA: 135 events  Air Liquide database: 125 events (in French)  ARIA (Barpi) database: 119 events (in French)  University of Pisa report : 3 events on H2 transport (in Italian)  INASMET: 4 events  http://www.fireworld.com: 35 events  DNV internal database: 8 events  ….MARS?  ….CUTE?  ….FACTS? .....DoE?

11 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Success Contributions to Integration – Produce a tool to be shared by the partners in the Consortium – Invitation to a joint data collection effort – Initiated discussions on how to report to HIAD – HIAD on the agenda; common meeting place for risk data – Co-operation with external entities/partners

12 HySafe Coordination Committee Meeting, 8 March 2006, Oslo Deviations from DJPA/DoW planning: –Software delivery and launching delayed to June 15 2006 (D59) –HIAD w/data delayed to October 1 2006 –Else: None p.t. Foreseen difficulties: –Change of JRC programming staff –Limited attention on collecting data on Excel format  More attractive and intuitive tool; update based on feedback  ”Marketing” Status vs Planning

13 HySafe Coordination Committee Meeting, 8 March 2006, Oslo WP5 Outlook 24 27 31 33 36 39 42 Next Steps (DJPA_25-42) HIAD operation, management & support HIAD integration / internal „marketing“ HIAD on HySafe Website „advertising“ HIAD external marketing HIAD newsletters D59D60Dxx 1st HIAD Stat.Rep M HIAD Workshop MS HIAD w/data 15/6 1/10 1/12 WP5 ……….


Download ppt "HySafe Coordination Committee Meeting, 8 March 2006, Oslo Status of WP5- The H ydrogen I ncident and A ccident D atabase Update March 2005 Christian Kirchsteiger,"

Similar presentations


Ads by Google