Presentation is loading. Please wait.

Presentation is loading. Please wait.

BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE.

Similar presentations


Presentation on theme: "BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE."— Presentation transcript:

1 BF RESORT PRESENTATION

2 SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE MUNTINLUPA BACOOR 1400mmø DIP

3 3 2. New Pagcor City PS & Reservoir -September 2009 to November 2010 -Accomplishment = 100% -March 2011-Start of Operation 1. Putatan Water Treatment Plants -100 MLD, Water Production -Operational Status of Major Projects As of February 24, 2010

4 BF RESORT SUPPLY 1400mmø DIP ALABANG ZAPOTE RD MARCOS ALVAREZ BF RESORT & SATELLITE SUBDIVISIONS ARIA ST 400mmø BF RESORT DR 400mmø ITALIA 500 BERKELEY BF CLASS 1

5 LONGOS ROAD COASTAL ROAD QUIRINO AVENUE GEN. AGUINALDO HIGHWAY ZAPOTE ROAD ALABANG - KABIHASNAN LONGOS ROAD ZAPOTE ROAD ALABANG - DAANG HARI Duration = 180 calendar days Total Length = 8 K.M. No. of Contract Packages = 5 No. of Contractors = 3 Expected Completion = May 2011

6 Commercial Aspect Bulk Selling Scheme Individual Metering Scheme

7 Commercial Aspect Bulk Selling Scheme  Maynilad to install water meter on the supply line to be charged to the customer  Supply water thru a bulk selling using a semi-business rate  Maynilad normally apply semi-business rate to residential subdivisions only

8 Commercial Aspect Bulk Selling Scheme  In our proposed billing, Maynilad will charge BF Resort using semi-business rate.  BF Resort can opt to sell it using Maynilad residential and commercial rate.

9 BILL COMPUTATION (Bulk Sale)

10 BILL COMPUTATION (Individual)

11

12

13 B.F. Resort Village Homeowners Association, Inc. The Committee on Water A Special Report by Dir. Amy Ruth E. Mitre Chairman Dir. Cris O. Dela Cruz Asst. Chairman

14 FACTS

15 B.F. Resort Village Homeowners Association, Inc. / Committee on Water FACTS These are the FACTS … FACT # 1  ALL BF Villages are deemed “gated” communities  This classification excludes BF Villages from Maynilad’s CAPEX (capital expenditure), as per MWSS Regulatory Office  As a “gated” community, BFRV has these options 1.Bulk Purchase of Maynilad’s water using existing pipelines 2.Individual Metering – “new” pipe-laying costs to be shouldered by the homeowners / subscribers

16

17

18 B.F. Resort Village Homeowners Association, Inc. / Committee on Water FACT # 2  The entry of Maynilad into BFRV is possible, via 1.Turnover of the open spaces of the Village (including roads) to the LP City Government, based on PD 1216 FACTS These are the FACTS …

19 B.F. Resort Village Homeowners Association, Inc. / Committee on Water FACT # 3  The entry of Maynilad into BFRV is possible, via 2.Turnover of the existing water system by BF Waterworks, via a pay-off scheme  Maynilad is no longer willing to buy the right of way from BF Waterworks, as was the case in the LP part of BF Paranaque  Maynilad is only willing to “advance” the turnover cost of the water system to the BFRV homeowners through the BFRV-HAI  This turnover cost shall be amortized by the BFRV homeowners over a period of five (5) years, or 60 months FACTS These are the FACTS …

20 B.F. Resort Village Homeowners Association, Inc. / Committee on Water FACT # 4  The entry of Maynilad into BFRV is possible, via 3.Legal means, through a)“Expropriation” by MWSS b)Foreclosure of BF Homes, Inc. open spaces (including roads), by the LP City Government FACTS These are the FACTS …

21 OPTIONS

22 B.F. Resort Village Homeowners Association, Inc. / Committee on Water OPTIONS These are Our OPTIONS … OPTION # 1  Maynilad Water to help BFRV to buy the right of way from BF Waterworks, at no cost to BFRV-HAI Probability : Low

23 B.F. Resort Village Homeowners Association, Inc. / Committee on Water OPTION # 2  “Expropriation” MWSS to expropriate the water system of BF Waterworks Effects 1.Homeowners will continue to bear amortization costs of the expropriation 2.The amount of expropriation will be based on the issue of “just compensation”  if the court decides on a high compensation, then homeowners will also pay for a higher amortization 3.Long Term OPTIONS These are Our OPTIONS …

24 B.F. Resort Village Homeowners Association, Inc. / Committee on Water OPTION # 3  Foreclosure of the BF Homes, Inc. open spaces by the LP City Government, resulting to an auction process Effects 1.The auction process will be long and tedious 2.After auction, it will still be subject to a “one (1) year redemption period” OPTIONS These are Our OPTIONS …

25 B.F. Resort Village Homeowners Association, Inc. / Committee on Water OPTION # 4  Negotiated Solution The BFRV-HAI, Maynilad Water, and BF Waterworks negotiate on the best payment amount, and then enter into a tripartite agreement. OPTIONS These are Our OPTIONS …

26 Computation: No. of Homeowners (conservative estimate)8,000 Amount to be Advanced by Maynilad for BFRVHAI to BF/PWCCP25M Amount of Pipelaying Cost by MayniladP286M Meter Deposit (@HO)P500 Amount of Meter and Security Deposit to be Refunded by BF/PWCCP10M Total Amount to be paid to BF/PWCC for the "right of way" (incl. of deposit refund)P43M Add'l Outright Cash Outlay of BFRV HO's (P1,000 x 8,000)P8M Calculation of Amortization Per Homeowner: Right of Way BF/PWCCP25M Maynilad (pipelaying)286M 311M Homeowners ÷ 8,000 38,875 Months ÷ 60 P648

27 PAST MEETINGS

28 B.F. Resort Village Homeowners Association, Inc. / Committee on Water A review of my past meetings for BFRV’s Water solution  December 7, 2010Exploratory Talks  January 26, 2011 Maynilad presentation for BFRVHAI  February 22, 2011 Data gathering/inspection of BFRV  March 4, 2011Clarification meeting on certain Maynilad rulings  April 8, 2011Submission of initial budgetary cost of pipe laying by Maynilad  April 14, 2011Submission of new adjusted budgetary cost of pipe laying by Maynilad for the whole BFRV area

29  April 20, 2011Presentation of “sample contract” by and between Maynilad and HOA  April 30, 2011Maynilad informed BFRVHAI that only P30M was approved by Maynilad  May 2, 2011Meeting called by BF/PWCC as start of official negotiation; right of way given out by BF/PWCC  May 5, 2011Presentation by BFRVHAI to BF/PWCC of a payment scheme to augment the fund source for the payment of the “right of way”

30  May 13, 2011Meeting with Coun. Danny Hernandez  May 19, 2011Meeting with Mayor Nene Aguilar, Vice-Mayor Louie Bustamante, City Councilors and BFHI Representative of Mr. Bobby Aguirre, Ms. Malou Vasquez


Download ppt "BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE."

Similar presentations


Ads by Google