Constructing & Showing Ag Mech Projects 2010-2011 Galveston, Texas.

Similar presentations


Presentation on theme: "Constructing & Showing Ag Mech Projects 2010-2011 Galveston, Texas."— Presentation transcript:

1 Constructing & Showing Ag Mech Projects 2010-2011 Galveston, Texas

2 Original Purpose To provide an opportunity for 4-H and FFA members to display projects constructed in agricultural mechanic labs. To promote the development of skills in agricultural mechanics through competition. To recognize individual and group accomplishments in the area of agricultural mechanics. To provide an opportunity for public appreciation of this important phase of 4-H and FFA Youth Programs

3 Houston Project Score Card Criteria Points Design and Materials Used…………. 20 Practicality………..……………………….. 20 Degree of Difficulty.…………..…………10 General Appearance and Finish..… 10 Documentation and Presentation. 10

4 San Antonio Project Score Card Criteria Points Workmanship (Including Finish)…..…… 30 Design and Materials Used (Including Practicality).……………………………………… 20 Documentation & Research.….…………. 20 Presentation.……………………………….…… 20 Degree of Difficulty……………….…………. 10

5 Presentation Presentation includes knowledge of project. Presentation includes display of the project. Presentation includes display of required documentation. Presentation includes the ability of students to answer questions, discuss the planning and construction of the project, and demonstrate the project (showmanship).

6 Metal Projects Materials used and reasons for use. Plan and bill-of-materials. Design used. Welding, cutting, and forming processes and procedures. Assembly procedures. Preparation for and painting.

7 Projects Utilizing Lumber Species or type(s) of lumber. Treatment process and safety or use precautions. Plan and bill-of-materials. Equipment used and operation of. Recommended fasteners. Recommended finish, if applicable.

8 Spraying Equipment Pressure, flow rate, coverage width, capacity, etc. Materials used and reasons for use. Plan and bill-of-materials. Welding, cutting, and forming processes and procedures. Assembly procedures. Preparing for and painting.

9 Mounted and Pull-Type Tractor Equipment 3-point and P.T.O. specifications & dimensions. Materials used and reasons for use. Plan and bill-of-materials. Welding, cutting and forming processes and procedures. Assembly procedures. Preparing for and painting.

10 Hydraulic Equipment Flow rate, pressure, type of valves, type of pump/motor, actuator, type and viscosity of oil used in system. Plan and bill-of-materials A hydraulic schematic should be included in documentation and understood by students. Welding, cutting and forming processes and procedures. Assembly and painting procedures.

11 Electrical Projects Voltage, amperage, conductor size and type, types of motors and controls, circuit protection, GFCI, etc. An electrical schematic should be included in documentation and understood by students. An understanding of processes used in construction of the wood or metal parts of the project.

12 Livestock Equipment An understanding of the wood, metal, hydraulic, and electrical procedures used in construction. Explain how it works and the dimensions used, etc.

13 Trailers Metal and wood construction Running gear location and capacity. Spring hanger spacing. Requirements to meet TxDOT rules and regulations. Federal lighting charts and/or other TxDOT regulations. Hydraulics if equipped and schematic.

14 Entering Projects at San Antonio Special Rule 1 for 2011 Projects entered correctly including naming. Entry fee is $30 per project. Ag Mech entries must be on official group summary sheet along with other Junior entries. Exhibitor names and social security numbers are required on entry form. It is imperative that exhibitor names and project descriptions (names) be correct. Use San Antonio document for San Antonio and Houston document for Houston.

15 Show History First show at Houston had students present, but few questions were asked by the judge. Plans and bill-of-materials were required. Photos were added to document that projects were constructed by students. DOT and ASABE standards and regulations were added. Safe conditions and personal safety equipment along with evidence of adult supervision were added as a requirement in photos. San Antonio requires additional information. Students now show projects and meet the public. They are SHOWS. I hope we can say they continue to put the exhibitors first. That is our goal.

16 Documents Available from Houston Constructing and Showing Agricultural Mechanics Projects Summary of TxDOT Requirements for Ag Mech Show Trailers. Naming and Describing Projects for Show Others


Download ppt "Constructing & Showing Ag Mech Projects 2010-2011 Galveston, Texas."

Similar presentations


Ads by Google