Presentation is loading. Please wait.

Presentation is loading. Please wait.

NCC East (700) NCC Midlands Glasgow Training Centre 2009.

Similar presentations


Presentation on theme: "NCC East (700) NCC Midlands Glasgow Training Centre 2009."— Presentation transcript:

1

2 NCC East (700)

3 NCC Midlands

4

5 Glasgow Training Centre 2009

6 Birmingham Training Centre 2009

7 Erith Training Centre 2009

8 Bircham Newton Training Centre 2009

9 Power requirement for Glasgow, Birmingham & Kent is 32 amp 3 phase. If you are hiring in a generator it will need to be a minimum 25KVA which will deliver 34.8 amps per phase. We also need it to deliver a clean stable feed as any peaks in the power could well cause projector lamps to blow. Also if you get the generator with tails terminating in either a 32 amp 3 phase or 63 amp 3 phase Cform socket we will supply distribution. Please position Cform socket to rear of stage. SpeedyHire do a range which would be suitable but Im sure you will have accounts with some of the national tool hire companies. Electrics


Download ppt "NCC East (700) NCC Midlands Glasgow Training Centre 2009."

Similar presentations


Ads by Google