Download presentation
Presentation is loading. Please wait.
Published byGrayson Coar Modified over 10 years ago
2
NCC East (700)
3
NCC Midlands
5
Glasgow Training Centre 2009
6
Birmingham Training Centre 2009
7
Erith Training Centre 2009
8
Bircham Newton Training Centre 2009
9
Power requirement for Glasgow, Birmingham & Kent is 32 amp 3 phase. If you are hiring in a generator it will need to be a minimum 25KVA which will deliver 34.8 amps per phase. We also need it to deliver a clean stable feed as any peaks in the power could well cause projector lamps to blow. Also if you get the generator with tails terminating in either a 32 amp 3 phase or 63 amp 3 phase Cform socket we will supply distribution. Please position Cform socket to rear of stage. SpeedyHire do a range which would be suitable but Im sure you will have accounts with some of the national tool hire companies. Electrics
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.