Presentation is loading. Please wait.

Presentation is loading. Please wait.

MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.

Similar presentations


Presentation on theme: "MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers."— Presentation transcript:

1 MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers Mobile District NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

2 Mobile District Navigation Projects 5 Inland Waterways 2200 Miles of Inland Waters 7 Deep Water Harbors 22 Shallow Draft FL GA TN MS PanamaCity Port St. Joe Bayou La Batre Pensacola Pascagoula Gulfport GIWW Flint River AL Alabama River Tenn-Tom Waterway Tombigbee River Mobile Black Warrior River Chattahoochee River Apalachicola River

3 SEPOCTNOVDECJANFEB MARAPRMAYJUNJULAUGSEPOCT FY07 FY06FY08 Hopper Dredge Maintenance Dredging Scheduled FY07 Dredging Work in Mobile District Mobile Hbr Bay/Bar (Rental) Manson/ Glenn Edwards Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. OCT 06 Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. JAN 07 Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. Jun 07 Mobile Hbr Bay/Bar (Rental) $4M IDIQ (Contingency) Pascagoula Bar (Rental) 1MCY IDIQ Used for emergency work, to be opened by amendment B.O. MAR 07 Used for emergency work, to be opened by amendment Mobile Hbr Bay/Bar (Rental) $4M IDIQ (Contingency) Panama City Beach Nourishment Unit Price 500KCY B.O. FEB 07

4 Type of Work: Maintenance Depth: 47 Bar and 45 Bay Width: 600/400 Length: 42 Miles Quantity: 1.0/2.25 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Continuous Type of Work: Maintenance Depth: 47 Bar and 45 Bay Width: 600/400 Length: 42 Miles Quantity: 1.0/2.25 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Continuous Mobile Harbor Channel Mobile Harbor Channel

5 Type of Work: Maintenance Depth: 44 Width: 450 Length: 6.2 Miles Quantity: 1.0 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 2-3 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2004 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin late March – End early June Type of Work: Maintenance Depth: 44 Width: 450 Length: 6.2 Miles Quantity: 1.0 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 2-3 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2004 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin late March – End early June Pascagoula Bar Channel Pascagoula Bar Channel

6 SEPOCTNOVDECJANFEB MARAPRMAYJUNJULAUGSEPOCT FY07 FY 06FY08 Hydraulic Pipeline Dredge Maintenance Dredging Scheduled FY07 Dredging Work in Mobile District Pascagoula Sound (Rental) Mike Hooks Missouri H 27 2M CY Gulfport Sound Channel (Rental) 1.5M CY Pascagoula Sound (Rental) 2MCY IDIQ B.O. May 07 BWT/GIWW (Rental) $15M IDIQ Tenn-Tom/ Ala River (Rental) $10M IDIQ Mobile River (Rental) 800KCY IDIQ B.O. MAY 07 B.O. FEB 07 Harrison County Beaches Unit Price 800KCY B.O. NOV 06

7 Type of Work: Maintenance Depth: 36 Width: 220 Length: 12 Miles Quantity: 1.5 Mcy Type of Material: Silt, Clay and Fluff Placement Area: Open Water D/A Distance to Placement Area: 5-10 K Feet Type of Equipment: Large Cutterhead Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin early February – End mid May Type of Work: Maintenance Depth: 36 Width: 220 Length: 12 Miles Quantity: 1.5 Mcy Type of Material: Silt, Clay and Fluff Placement Area: Open Water D/A Distance to Placement Area: 5-10 K Feet Type of Equipment: Large Cutterhead Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin early February – End mid May Gulfport Sound Channel Gulfport Sound Channel

8 On-Going Dredging Work in Mobile District

9 Black Warrior and Tombigbee Rivers, Alabama River Tennessee-Tombigbee Waterway, GIWW Type of Work: Maintenance Depth: 9 – 12 Width: Various widths Length: Various Lengths Quantity: Rental Type of Material: Sand/Gravel Placement Area: Upland and Within Banks Distance to Placement Area: Various Distances Type of Equipment: 18 - 24 Cutterhead Last Dredged: 2006 Contract Amount: $1,000,000 - $5,000,000 Schedule: Summer 2007 Type of Work: Maintenance Depth: 9 – 12 Width: Various widths Length: Various Lengths Quantity: Rental Type of Material: Sand/Gravel Placement Area: Upland and Within Banks Distance to Placement Area: Various Distances Type of Equipment: 18 - 24 Cutterhead Last Dredged: 2006 Contract Amount: $1,000,000 - $5,000,000 Schedule: Summer 2007 Tenn-Tom Waterway


Download ppt "MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers."

Similar presentations


Ads by Google