Presentation is loading. Please wait.

Presentation is loading. Please wait.

Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps.

Similar presentations


Presentation on theme: "Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps."— Presentation transcript:

1 Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps of Engineers 1 1

2 Project Vicinity Map 2 2

3 The Problems 3 3

4 Headcut 4 4

5 The Problems Fish Passage 5 5

6 The Problems Lack of Quality Pool Habitat 6 6

7 The Problems High Sediment Input 7 7

8 The Problems Lack of Large Woody Debris 8 8

9 The Problems Lack of Riparian Vegetation 9 9

10 Project Goals 10

11 Project Goals Headcut Stabilization Stabilize Irrigation Diversion Facility Stabilize Channel Morphology Improve Fish Passage Prevent Stream Bank Erosion Vegetate Riparian Zone 11

12 Project Description 12

13 Project Description Cooperate with landowners to vegetate riparian zones, improving diversity and function, providing shade and preventing stream bank erosion. 13

14 Project Description Replace the pushup irrigation diversion and stabilize the headcut structure to improve adult and juvenile salmon, steelhead and bull trout passage. 14

15 Project Description Place root wads, anchored logs, J-hooks and W-weirs to provide safe migration corridors by reducing channel gradient, prevent channel migration, and provide stream bank erosion protection thereby reducing sedimentation. 15

16 Project Description Educate landowners on management practices that will enhance riparian zones. 16

17 Project Description Pursue Phase II - Next mile downstream to the Island City Bridge 17

18 Plate 1 18

19 Plate 2 19

20 Plate 3 20

21 Plate 4 21

22 Future Without Project Headcut Could Break Free Resulting in the Following: 22

23 Future Without Project Severe Headward Channel Downcutting Loss of Channel Complexity Continued Riparian Habitat Degradation Loss of Spruce Street Bridge Massive Sediment Movement and Entrapment (gravel bars) 23

24 Funding 24

25 Funding Feasibility Study, Environmantal Assessment and Specifications (up to August 2001) $250,000 Phase I Construction $3,264,320 U.S. Army Corps of Engineers share -$2,448,240 BPA Request (25% of total) $816,080 25


Download ppt "Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps."

Similar presentations


Ads by Google