Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 BM1 NEW COURSE. 2 MLC COMPLIANCE LESSON #1 3 ARE MLC COMPLIANCE INSPECTIONS JUST FOR LARGE CG UNITS? TRUE OR FLASE FALSE.

Similar presentations


Presentation on theme: "1 BM1 NEW COURSE. 2 MLC COMPLIANCE LESSON #1 3 ARE MLC COMPLIANCE INSPECTIONS JUST FOR LARGE CG UNITS? TRUE OR FLASE FALSE."— Presentation transcript:

1 1 BM1 NEW COURSE

2 2 MLC COMPLIANCE LESSON #1

3 3 ARE MLC COMPLIANCE INSPECTIONS JUST FOR LARGE CG UNITS? TRUE OR FLASE FALSE

4 4 WHAT IS ICP… INVENTORY CONTROL POINT

5 5 WHAT IS IGE… INDEPENDENT GOVERNMENT ESTIMATE

6 6 WHAT IS LUFS… LARGE UNIT FINANCIAL SYSTEM

7 7 WHAT IS JWOD… JAVITS-WAGNER-ODAY ACT

8 8 WHAT IS JOTFOC… JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

9 9 WHO IS RESPONSIBLE FOR SOURCE SELECTION ON A PR… KO

10 10 TRUE OR FALSE IS ATHLETIC EQUIPMENT LESS THEN $400 HAS TO BE ON PROPERTY FALSE $500-$2499

11 11 TRUE OR FALSE IS SILVERWARE OR SILVER SERVICE ON PROPERTY… YES

12 12 WHAT FORM IS USED TO ACQUIRE ACESS MATERIALS FROM DRMO.. DD A

13 13 WHAT TYPE OF MILSTRIP SOFTWARE APPLICATION WOULD YOU USE IF YOU WERE AT A SHORE UNIT… FLEET LOGISTICS SYSTEM (FLS)

14 14 WHAT TYPE OF MILSTRIP SOFTWARE APPLICATION WOULD YOU USE IF YOU WERE AT A AFLOAT UNIT… CMPLUS-NT

15 15 MLC COMPLIANCE INSPECTIONS ARE REQUIRED TO HELP GUARD AGAINST _____, FRAUD, AND _____. WASTE ABUSE

16 16 IF ITEMS DO NOT APPLY TO YOUR UNIT, WHAT DO YOU WRITE IN THOSE SECTIONS? N/A

17 17 WHAT NEEDS TO BE COMPLETED BEFORE THE MLC COMPLIANCE TEAM ARRIVES? SELF-ASSESSMENT CHECKLIST

18 18 WHERE DO YOU FIND CHECKLISTS NEEDED FOR AN MLC INSPECTION? ON MLC WEBSITE

19 19 LESSON #2 HOW TO PROCURE SUPPLIES AND OR SERVICES

20 20 ON A PR ACCOUNTING DATA LINE, WHAT TYPE OF FUNDING IS OPERATING EXPENSES (OE)? REGULAR APPROPRIATIONS

21 21 NAME THE THREE PROCUREMENT MANUALS THAT ARE USED FOR PROCUREMENT QUESTIONS. FINCEN SOP SUPPLY POLICY AND PROCEDURES MANUAL SIMPLIIFIED ACQUISITIONS PROCEDURES HANDBOOK

22 22 YOU ARE GIVEN A PR FOR ONE CAN OF PAINT. WHAT MUST BE SUBMITTED WITH THE PR SINCE PAINT IS HAZARDOUS MATERIAL? STATEMENT OF ESSENTIAL NEED (SEN)

23 23 YOU ARE GIVEN A PR FOR A NEW $1,200 TREADMILL FOR THE FITNESS CENTER. SHOULD THAT TREADMILL BE ACCOUNTED FOR IN PROPERTY? YES #6 OF MANDATORY ITEMS

24 24 WHAT REFERENCE MANUAL CAN BE USED FOR MORE INFORMATION ON ACCOUNTING FOR PROPERY IN THE CG. PERSONAL PROPERTY MANUAL

25 25 WHEN GIVEN A PR, YOU MUST ( ) ALL INFORMATION TO ENSURE COMPLETENES AND ACCURACY. VERIFY

26 26 WHAT IS THE SINGLE MOST IMPORTANT SIGNATURE ON THE PR? CERTIFICATION OF FUNDS AVAILABILITY

27 27 WHO IS RESPONSIBLE FOR SOURCE OF SUPPLY OR SERVICE SELECTION? CONTRACTING OFFICER

28 28 NAME THE SEVEN SOURCES OF SUPPLY EXCESS FROM OTHER CG AGENCIES EXCESS FROM OTHER AGENCIES FEDERAL PRISON INDUSTRIES PRODUCTS AVAILABLE FROM NIB-NISH WHOLESALE SUPPLY SOURCES OPEN-MARKET COMMERCIAL SUPPLIERS

29 29 NAME THE FIVE SOURCES OF SERVICE? SERVICES AVAILABLE FROM NIB-NISH MANDATORY FEDERAL SUPPLY SCHEDULES OPTIONAL USE FEDERAL SUPPLY SCHEDULES FEDERAL PRISON INDUSTRIES OPEN-MARKET COMMERCIAL SERVICES

30 30 IF A PR ITEM HAS BEEN DESIGNATED BY THE EPA AS AN ITEM THAT CAN BE MADE WITH RECYCLED MATERIALS,WHAT FORM MUST BE INCLUDED WITH THE PR? REQUISITIONER DETERMINATION FORM

31 31 WHAT SIGNATURE HAS TO BE ON THE STATEMENT OF ESSENTIAL NEED (SEN) BEFORE A PURCHASE OF HAZARDOUS MATERIALS CAN BE MADE? POLLUTION PREVENTION COORDINATOR

32 32 WHAT ARE THE THREE PROCUREMENT METHODS? MILSTRIP SIMPLIFIED ACQUISITION METHOD ACQUIRE FROM EXCESS MATERIALS

33 33 WHAT ARE THE SIX SMALL- PURCHASE METHODS? P-CARD C-CHECKS IMPREST FUNDS PURCHASE ORDER SF-344 BPA

34 34 OF THE SIX SMALL- PURCHASE METHODS, WHICH ONE IS THE LEAST PREFERRED METHOD? SF-344

35 35 WHAT IS THE MONETARY LIMIT USING THE SIMPLIFIED ACQUISITION METHOD FOR CONSTRUCTION? $2,000

36 36 WHEN ACQUIRING EXCESS MATERIALS FROM OTHER AGENCIES, WHAT FORM MUST BE FILLED OUT? DD-1149

37 37 WHAT ARE THE TWO COMPUTER SOFTWARE PROGRAMS THAT THE CG USES TO POST, RECONCILE AND CLOSE OUT PROCUREMENT REQUESTS? CM-PLUS AND LUFS

38 38 LESSON #3 HOW TO REVIEW CG DINING FACILITY REPORTS AND RECORDS

39 39 THE COAST GUARD DINING FACILITY OPERATING STATEMENT IS REQUIRED TO BE SUBMITTED BY THE ( ) OF THE THE FOLLOWING MONTH. 10 TH

40 40 THE CGDFOS IS SUBMITTED TO THE COAST GUARD? FINANCE CENTER

41 41 LIST THE THREE TYPES OF CG DINING FACILITY OPERATING STATEMENT REPORTS? REGULARRELIEF MEMORANDUM

42 42 WHO MUST SIGN TH CG DINING FACILITY OPERATING STATEMENT? FSO CO/OINC

43 43 LIST THE SUPPORTING DOCUMENTS THAT ARE TO BE SUBMITTED WITH THE CGDFOS. CG-3123 CG-2581 CG-4261 CG-1149

44 44 WHEN REVIEWING THE CGDFOS, YOU SEE THAT LINE 14 IS 50%. IS THERE A PROBLEM WITH THE AMOUNT OF INVENTORY ON HAND? IF SO, WHAT IS THE PROBLEM? YES, TOO MUCH INVENTORY

45 45 WHEN REVIEWING THE CGDFOS, YOU SEE THAT LINE 14 IS 75%. IS THERE A PROBLEM WITH THE AMOUNT OF INVENTORY ON HAND? IF SO, WHAT IS THE PROBLEM? NO

46 46 WHEN REVIEWING THE CGDFOS, YOU SEE THAT LINE 14 IS 105%. IS THERE A PROBLEM WITH THE AMOUNT OF INVENTORY ON HAND? IF SO, WHAT IS THE PROBLEM? YES, INVENTORY IS BELOW 30 DAYS WORTH

47 47 WHEN REVIEWING THE CGDFOS, YOU SEE THAT LINE 26 IS MORE THAN 10% GREATER THAN LINE 22. IS THERE A PROBLEM WITH THIS? IF SO, WHAT IS THE PROBLEM? UNIT DID NOT SPEND ITS ALLOWED AMOUNT FOR MEALS, AND THE AMOUNT ABOVE 10% IS TO BE RETURNED TO THE SUPPLY FUND.

48 48 WHEN REVIEWING THE CGDFOS, YOU SEE THAT LINE 26 IS MORE THAN 5% OF LINE 22. IS THERE A PROBLEM WITH THIS? IF SO, WHAT IS THE PROBLEM? NO

49 49 LIST THE THREE TYPES OF PROVISION INVENTORY REPORTS (CG-4261). END-OF-THE-MONTH REPORT RELIEF REPORT ANNUAL AUDIT REPORT

50 50 WHO IS NORMALLY RESPONSIBLE FOR COMPLETETING THE PROVISION INVENTORY REPORTS AND SUBMITTING THEM TO THE FSO? JACK-OF-THE-DUST

51 51 LIST THE FOUR ITEMS THAT THE CO/OIC SHOULD REVIEW BEFORE SIGNING THE PROVISION INVENTORY REPORT. EXTENSIONS AND TOTALS LEGIBILITY ENTRIES INVENTORY BALANCE

52 52 LIST THERE EXAMPLES OF ENTRIES THAT THE CO/OIC SHOULD REVIEW BEFORE SIGNING THE PROVISION INVENTORY REPORT. HIGH COST ITEMS ASSORTED ITEMS HALF ITEMS

53 53 WHAT FORM DOES XO/XPO VERIFY DAILY? DAILY RATION MEMORANDUM CG-3123

54 54 THE CGDF UNIT FILES AND CASH LOGS ARE TO BE RETAINED FOR HOW MANY MONTHS? 36

55 55 UNITS USING MEAL PASSES FOR RIK OR SIK IDENTIFICATION WILL KEEP A LOG SHOWING THE: MEAL PASS NUMBER MEMBERS NAME SSN DATE ISSUED

56 56 REVIEW QUIZ LESSONS 1-2-3

57 57 HOW OFTEN IS EVERY COAST GUARD UNIT REQUIRED TO HAVE A COMPLIANCE INSPECTION DONE? A. 2 YEARS B. 3 YEARS C. 4 YEARS D. 5 YEARS A. 2 YEARS

58 58 A MIRCO-PURCHASE IS DEFINED AS THE ACQUISTION OF SUPPLIES AND OR SERVICES FOR ( ) OR LESS IN THE COMMERCIAL MARKET. B. $2,500 A. $2,000 C. 3,000 D. 3,500 B. $2,500

59 59 WHAT IS THE FIRST SOURCE OF SUPPLY TO BE USED REGARDLESS OF DOLLAR VALUE? C. EXCESS FROM OTHER CG UNITS B. FEDERAL PRISON INDUSTRIES A. MANDATORY FEDERAL SUPPLY SCHEDULES D. OPEN MARKET PURCHASES C.

60 60 WHAT IS THE LEAST PREFERRED METHOD OF PURCHASING AFTER THE P-CARD AND C-CHECKS? A. SF-347 B. SF-44 C. OF-187 D. OF B. SF-344

61 61 THE CG DINING FICILITY OPERATING STATEMENT MUST BE RECEIVED BY THE FINCEN BY THE ( ) FOLLOWING MONTH. A. 1 ST B. 5 TH C. 10 TH D. 15 TH C. 10 TH

62 62 THE CG DINING FACILITY OPERATING STATEMENT MUST BE SIGNED BY THE ______. A. CO/OIC B. XO/XPO C. CO/OIC AND FSO D. XO/XPO AND FSO C. CO/OIC AND FSO

63 63 WHOM MUST APPROVE THE DAILY RATION MEMORANDUM (CG-2123)? A. CO/OIC B. XO/XPO C. FSO D. ADMIN OFFICER B. XO/XPO

64 64 BM1 NEW COURSE HOW TO CONDUCT A PRECISION ANCHORING DRILL LESSON #1

65 65 ANCHORING TERMINOLGY

66 66 DISTANCE TO GO… ARCS USED TO MEASURE RANGE TO ANCHORAGE

67 67 RIDING…… LETTING OUT THE ANCHOR UNDER CONTROL OF THE WINDLASS

68 68 WALK OUT… LOWER ANCHOR UNDER CONTROL OF THE WINDLASS

69 69 DRAG CIRCLE... THE LENGTH FROM THE HAWSEPIPE TO THE PELORUS PLUS THE SCOPE OF THE CHAIN.

70 70 UP AND DOWN… FLUKES OUT WHILE THE CROWN IS RESTING ON THE BOTTOM.

71 71 HEAD BEARING… BEARING TO AN OBJECT ON THE BOW, WHICH LIES DIRECTLY OVER THE ANCHORAGE.

72 72 LETTING GO CIRCLE… EQUAL TO THE DISTANCE FROM HAWESPIPE TO THE PELORUS.

73 73 VEER… RUN OUT BY ITS OWN WEIGHT

74 74 SWING CIRCLE… LENGTH OF THE SHIP PLUS THE SCOPE OF THE CHAIN.

75 75 SHORT STAY… JUST SHORT OF BREAKING OUT OF THE BOTTOM.

76 76 WATER TOO SHALLOW WILL CAUSE A SHIP TO GO … AGROUND

77 77 WATER TOO DEEP WILL ALLOW THE ANCHOR TO… DRAG

78 78 NEVER ANCHOR IN DEPTHS OVER HOW MANY FATHOMS… 100

79 79 AVOID _____BOTTOMS: SELECT ______ OR ______BOTTOMS IF THEY ARE AVAILABLE. ENSURE THAT THE BOTTOM AREA IS CLEAR OF ______ AND ______. ROCKY SANDY MUDDY CABLES PIPELINES

80 80 TRY TO ANCHOR IN AN AREA THAT IS SAFE AND PROTECTED BY LAND FROM THE PREVAILING ______ AND ______ CONDITIONS… SEAS WIND

81 81 HOW MANY YARDS SHOULD THE FINAL APPROACH TRACK BE… 1200

82 82 WHEN THE VESSEL IS WITHIN 1000 YARDS, FIXES SHOULD BE TAKEN AND PLOTTED EVERY… 30 SECONDS

83 83 AT 1000 YARDS FROM THE ANCHORAGE, RECOMMEND THAT THE SHIP… REDUCE SPEED

84 84 FROM 1000 YARDS TO THE DROP CIRCLE. INFORM THE FORECASTLE ANCHORING DETAIL SUPERVISOR OF THE DISTANCE TO ANCHORAGE… AT 100-YARD INTERVALS.

85 85 AFTER YOU PASS THE CHAIN STOPPERS YOU MAKE THE ANCHOR READY FOR ______, _______ OR _______. RIDINGVEERING HEAVING

86 86 THE NAVIGATOR EVALUATOR TAKES FIXES AT LEAST EVERY… 3 MINS FOR THE FIRST 30 MINS

87 87 FIXES SHALL BE EVERY _____ DURING PERIODS OF LOW VISIBILITY. 3 MINS

88 88 IN THE BRAKE METHOD WHAT DOES THE COMMAND LET GO MEAN… SLOWLY RELEASE THE BRAKE AND THE ANCHOR WILL FALL FREE

89 89 ON THE COMMAND ______WITH THE BRAKE SET, RELEASE THE PELICAN HOOK AND CATS-PAW. STAND BY

90 90 RANGE RINGS SHOULD BE DRAWN FROM THE LET-GO POSITION …. EVERY 100 YARDS OUT TO THE 1000 YARDS POINT. THEN 1500, 1750, 2000 AS A MIN.

91 91 HOW TO CONDUCT A LOW VISIBILITY DRILL LESSON #2

92 92 IN WHAT PUBLICATION WOULD YOU FIND THE REQUIREMENTS TO CONDUCT A LOW VISIBILITY DRILL FOR YOUR VESSEL? CUTTER TRAINING AND QUALIFICATION MANUAL

93 93 WHAT IS A PELOURUS… A COMPASS USED TO DETERMINE THE RELATIVE BEARING TO AN OBJECT

94 94 HOW LONG A TRANSIT MUST YOU MAKE TO COMPLETE THE MOB- N-6-SF DRILL LISTED IN FXP-4? 6,000 YARDS AND WILL INCLUDE AT LEAST 2 CHANNEL TURNS MORE THEN 15*

95 95 WHAT IS THE RECOMMENDED FIX INTERVAL BETWEEN CIC AND THE BRIDGE SHIFTING CHARTS? AT LEAST 1 FIX INTERVAL.

96 96 WHO SHOULD INDICATE TO THE CONNING OFFICER IF THE NEXT RECOMMENDED COURSE IS CLEAR OF TRAFFIC OR HAZARDS? SHIPPING OFFICER

97 97 REVIEW QUIZ..

98 98 THE LETTING GO CIRCLE IS EQUAL TO THE DISTANCE FROM THE ( ) TO THE ( ). A. HAWSEIPE, PELORUS B. BOW, MAST C. HAWESPIPE, ANCHOR D. HAWSEPIP,BOW A.

99 99 THE SCOPE OF CHAIN TO BE USED IN ANCHORING IS NORMALLY ( ) TIMES THE DEPTH OF WATER. A. 2-4 B. 3-5 C. 5-7 D. 7-9 C.

100 100 HOW OFTEN MUST FIXES BE TAKEN IN A PRECISON ANCHORING WHEN THE VESSEL IS WITHIN 1,000 YDS OF ANCHORING? A. 2 MINUTES B. 1 MINUTE C. 45 SECONDS D. 30 SECONDS D.D.

101 101 THE SHIFT POINTS DURING A LOW VISIBILITY DRILL FOR THE CIC AND BRIDGE CHARTS MUST BE AT LEAST ( ) APART. A. 1 FIX INTERVAL B. 1 MINUTE C. 2 FIX INTERVALS D. 2 MINUTES A.

102 102 ENSURE CHART IS CORRECT AND UP-TO-DATE IAW THE LATEST _____ AND WEEKLY ____… NTM

103 103 HOW TO MAINTAIN DIVISION- DEPARTMENT PMS SCHEDULES

104 104 WHAT COAST GUARD UNITS ARE REQUIRED TO USE THE PMS SYSTEM. ALL

105 105 WHAT COAST GUARD UNITS ARE REQUIRED TO USE CMPLUS… ALL UNITS THAT HAVE IT AVAILABLE.

106 106 LIST THE TYPE (FREQUENCY) OF PMS THAT ARE NORMALLY LISTED ON AN ANNUAL PMS SCHEDULE. QUARTERLY AND ABOVE AND MAJOR CONDITIONALS

107 107 WHAT PMS ITEMS ARE LISTED ON A WEEKLY PMS SCHEDULE… ALL PMS ITEMS SCHEDULED FOR THE WEEK.

108 108 HOW TO CONDUCT A LEVEL ONE INSPECTION ON WEIGHT-HANDLING EQUIPMENT…

109 109 KEY TERMS ON WEIGHT-HANDLING EQUIPMENT

110 110 BCMP… BOAT CLASS MAINTENANCE PLAN

111 111 CCMP… CUTTER CLASS MAINTENANCE

112 112 CRANES… A MACHINERY ARRANGEMENT OR SELF-CONTAINED STRUCTURE WITH ASSOCIATED REEVING SUITABLE FOR LIFTING LOADS THROUGH SEVERAL DIMENSIONS OF MOTION.

113 113 DYNAMIC LOAD TESTS… A TEST, TYPICALLY CONDUCTED AT THE PIER AT 125% OF WORKING LOAD LIMIT, TO VERIFY THAT EQUIPMENT CAN PROPERLY FUNCTION AT WORKING LOAD LIMIT WHILE U/W.

114 114 ESP… EQUIPMENT SUPPORT PLAN

115 115 PMS… PREVENTIVE MAINTENACE SYSTEM

116 116 RATED TEST LOAD… A TEST, TYPICALLY CONDUCTED AT 100% OF WORKING LOAD LIMIT WHILE, TO PROVE THE INSTALLATION OF A WIRE ROPE FITTING OR OTHER REPAIR.

117 117 SAFE WORKING LOAD… THE MAXIMUM WEIGHT THAT CAN BE SAFELY HANDLED BY THE EQUIPMENT, WITH THE MAXIMUM AUTHORIZED NUMBER OF PARTS IN THE MAIN PURCHASE.

118 118 STATIC LOAD TEST… A TEST, TYPICALLY CONDUCTED AT 150% OF WORKING LOAD, TO VERIFY STRUCTURAL INTERGRITY OF THE SYSTEM AND THE ABILITY OF THE SYSTEM TO HOLD AGAINST LARGE LOADS

119 119 WEIGHT HANDLING SYSTEM… ANY PIECE OF EQUIPMENT DESIGNED AND USED FOR THE PURPOSE OF MOVING HEAVY LOADS; I.E, CRANES, BOOMS, DAVITS, & CROSS DECK WINCHES.

120 120 WORKING LOAD LIMIT (WLL)… THE MAXIMUM WEIGHT THAT CAN BE SAFELY HANDLED BY THE EQUIPMENT NUMBER OF PARTS IN THE MAIN PURCHASE.

121 121 BOAT HOISTING EQUIPMENT

122 122 WIRE ROPE SHOULD BE MEASURED IN _____ OR MORE PLACES. THE DIAMETER SHALL BE MEASURED ACROSS THE LARGEST ______ LINE. SIX RADIAL

123 123 WIRE ROPE FALLS AND WIRE ROPE SLINGS SHALL BE INSPECTED…. ANNUALLY

124 124 BOAT HOISTING EQUIPMENT, IN GENERAL THE TEST LOAD IS EQUAL TO…. 150%

125 125 BOAT HOISTING EQUIPMENT, THE FOLLOWING PRECAUTIONS SHALL BE OBSERVED DURING TESTING… AVOID DYNAMIC LOADING KEEP THE BOAT LOW TO REDUCE DAMAGE DO NOT TEST WITH PEOPLE ABOARD DO NOT EXCEED TEST WEIGHTS WHEN HOISTING WITH A SLING, USE ADEQUATE SLING LENTH OR SPREADERS TO AVOID STRESS

126 126 SELF-CONTAINED GEARBOXES WITH LESS THAN _____ GALLONS OF LUBE OIL SHALL HAVE THE GEAR LUBE REPLENISHED… 5

127 127 GEARBOXES WITH CAPACITIES IN EXCESS OF _____ GALLONS SHALL HAVE OIL SAMPLES DRAWN FOR ANALYSIS. 5

128 128 GEAR BOXES IF POSSIBLE DRAINS SHOULD BE OPENED AND BOXES SHOULD BE CHECKED FOR _______ AT THE BOTTOM OF THE TANKS… CONDENSATION

129 129

130 130 HOW TO CONDUCT A LEVEL ONE INSPECTION ON WEIGHT-HANDLING EQUIPMENT PART 2

131 131 INSPECTING & TESTING WEIGHT- HANDLING EQUIPMENT IS CONDUCTED AT THREE LEVELS…

132 132 WHAT IS LEVEL ONE… THE INTENT OF THIS INSPECTION IS TO ASCERTAIN THE SAFETY OF THE RIGGING & OTHER CRITICAL EQUIPMENT PARTS THAT COULD RESULT IN LOSS OF LIFE OR EQUIPMENT DAMAGE IF FAILURE OCCURS. IT ALSO THE LEAST AMOUNT OF DISASSEMBLY.

133 133 WHAT IS LEVEL TWO… THE LEVEL OF INSPECTION WHICH IS USED TO CONCURRENTLY DISASSEMBLE, INSPECT, AND OVERHAUL ALL MAJOR COMPONETS WHOSE PERFORMANCE OR MECHANICAL CONDITION MAY HAVE DETERIORATED.

134 134 WHAT IS LEVEL THREE… THE LEVEL OF INSPECTION WHICH IS USED TO DISASSEMBLE AND OVERHAUL ALL PNEUMATIC AND HYDRAULIC COMPONETS.

135 135 WHAT ARE THE COMPONETS THAT MUST BE EXAMINED DURING EACH APPLICATION OF THE TEST LOAD FOR SIGNS OF UNDUE STRESS A. KING POSTS AND FOUNDATIONS, PADEYES B. RUNNING RIGIN, BLOCKS, LINES, PURCHASES C. STRUCTURAL SUPPORTS, ATTACHMENTS

136 136 WHERE ARE THE RESULTS OF THE INSPECTION AND TEST RECORDED. A. CUTTER HULL HISTORY B. BOAT RECORD C. IN THE PILOTHOUSE, THE MAX LIST OF THE CUTTER. D. ON THE BOOM, THE DATE OF TEST WILL BE STENCILED.

137 137 ON WEIGHT HANDLING EQUIPMENT WHAT INFORMATION IS REQUIRED ON THE LABEL PLATE AND WHERE IS THE LABEL PLATE LOCATED. A. INSTALLED ON THE BOOM B. DATE OF TEST, SAFE WORKING LOAD TEST WEIGHT USED, AND CORRESPONDING PARTS OF THE PURCHASE.

138 138 WHAT CHANGES ARE ALLOWED TO WEIGHT HANDLING EQUIPMENT. A. USE FEWER PARTS WITH APPROVAL FROM MLC. B. METHOD OF SECURING A LINE TO A CARGO HOOK. C. REDESIGN OF ATTACHEMENTS WITH G-ENE APPROVAL. D. WELDING ON HIGHLY-STRESSED COMPONETS WITH G-ENE APPROVAL.

139 139 WHAT IS THE PURPOSE OF TEST AND INSPECTION OF BOAT HOISTING EQUIPMENT. TO ESTABLISH THE ADEQUACY OF THE BOAT STRUCTURE, DAVITS, BOAT CRANE, RIGGIN, SLINGS, ATTACHMENTS, AND HOISTING EQP.

140 140 WHAT IS THE FREQUENCY OF INSPECTION FOR WIRE ROPE USED ON BOAT HOISTING EQUIPMENT. 12 MONTHS

141 141 THE PURPOSE OF PLACING ½ THE LOAD FORWARD AND THE OTHER ½ AFT DURING A LOAD TEST OF BOAT HOISTING EQUIPMENT IS TO … MINIMIZE STRAIN ON THE BOAT.

142 142 WHAT PERCENTAGE OF THE NORMAL HOISTING LOAD WEIGHT IS USED WHEN CONDUCTING A LOAD TEST ON BOAT HOISTING EQUIPMENT. 150%

143 143 LIST THE INFORMATION RECORDED ON THE BOAT INSPECTION FOR EACH TEST AND INSPECTION PERIOD. A. DATE OF TEST AND INSPECTION. B. WEIGHT ADDED TO THE BOAT. C. TOTAL WEIGHT HOISTED. D. COMMENTS

144 144 LEVEL 1 WEIGHT-HANDLING EQUIPMENT INSPECTIONS ARE NORMALLY CONDUCTED. ANNUALLY

145 145 DYNAMIC WEIGHT TESTING SHALL BE PERFORMED ON ALL CRANES WHENEVER… MAJOR EQUIPMENT REPLACEMENT ARE MADE.

146 146 WHEN INSPECTING CRANE SHEAVES, A _________ GAUGE SHALL NOT BE USED TO CHECK FOR WEAR. SHEAVE

147 147 DYNAMIC LOAD TEST IS TYPICALLY CONDUCTED WHERE AND AT WHAT % OF THE WORKING LOAD LIMIT. A. PIER B. 125%

148 148 WHEN CONDUCTING A DYNAMIC LOAD TEST, AT LEAST HOW MANY CYCLES MUST BE COMPLETED, AND AT NO SPECIFIC SPEED, WITH LOSS OF __________. A. 3 CYCLES B. PERFORMANCES.

149 149 ENGRAVED LABEL PLATES SHALL BE INSTALLED ON CRANES OR CRANE PEDESTALS TO DOCUMENT THE… A. SAFE WORKING LOAD B. TEST WEIGHT C. DATE OF INSPECTION

150 150 IN GENERAL, THE TEST LOAD IS EQUAL TO WHAT % OF THE NORMAL HOISTING LOAD. 150%

151 151 THE DIAMETER OF WIRE ROPE SHALL BE MEASURED IN A CIRCUMSCRIBING CIRCLE IN _____OR ____ PLACES. A. SIX OR MORE

152 152 WHEN INSPECTING SHEAVES ON BOOMS AND CRANES, INSPECTION SHALL INCLUDE ________ WEAR MEASUREMENTS. CRANE SHEAVES

153 153 WHEN INSPECTING BOOMS AND CRANES, ELECTRICAL WIRING AND CONNECTIONS SHALL BE INSPECTED FOR ________ CORROSION

154 154 WHAT CG UNITS ARE REQUIRED TO MAINTAIN A PMS SYSTEM? ALL UNITS

155 155 A QUATERLY PMS PLAN NORMALLY LISTS ALL ________ AND ABOVE PMS. WEEKLY

156 156 A STATIC LOAD TEST CONDUCTED IN WEIGHT HANDLING EQUIPMENT IS TYPICALLY CONDUCTED AT WHAT % OF WORKING LOAD TO VERIFY STRUCTURAL INTEGRITY 150%

157 157

158 158 BM1 PART 4 TRAINING

159 159 WHO IS RESPONSIBLE FOR APPROVING THE UNIT TRAINING PLAN? CO/OIC

160 160 QUATERLY TRAINING PLAN AND WEEKLY TRAINING PLANS ARE NOT REQUIRED AT … SHORE UNITS

161 161 WHO IS RESPONSIBLE FOR MAINTAINING A RECORD OF PQS/JQR QUALIFIED PERSONAL.. UNIT TRAINING OFFICER

162 162 WHO IS RESPONSIBLE FOR ASSIGNING AN INSTRUCTOR FOR EACH DEPARTMENTAL TRAINING PERIOD. DIVISION OFFICER

163 163 WHO SERVES AS CHAIRMAN OF THE TRAINING BOARD… XPO

164 164 WHO ESTABLISHES TRAINING POLICY AND PRIORITIES… THE TRAINING BOARD

165 165 WHO IS RESPONSIBLE FOR ASSIGNING AN INSTRUCTOR FOR EACH DEPARTMENTAL TRAINING PERIOD… DIVISION OFFICER

166 166 WHAT SECTION DOES DEPARTMENTAL TRAINING GOES IN THE TRAINING FOLDER… IV

167 167 WHAT IS LPO… LESSON PLAN OUTLINE

168 168 WHAT IS UTP… UNIT TRAINING PLAN

169 169 WHAT IS OBTT… ONBOARD TRAINING TEAM

170 170 WHO IS RESPONSIBLE FOR MAINTAINING A RECORD OF PQS/JQR QUALIFIED PERSONNEL… TRAINING OFFICER

171 171 HOW LONG IN ADVANCE SHALL A UNIT TRAINING PLAN BE ESTABLISHED… 1 MONTH

172 172 HOW TO REVIEW REQUIREMENTS FOR ARRIVAL AND DEPARTURE OF CIVIL OFFICIALS

173 173 WHAT FLAG IS USED WHEN THE SECRETARY OF DEFENSE MAKES AN OFFICIAL VISIT. SECRETARYS

174 174 WHERE ON BOARD SHIP WILL THE PRESIDENTS FLAG BE DISPLAYED… MAINMAST

175 175 ALL PERSONAL FLAGS DURING A GUN SALUTE WILL BE __________ OF THE NATIONAL ENSIGN. LOWERED CLEAR

176 176 A FOREIGN OFFICIAL IS ENTITLED TO HOW MANY GUN SALUTES… 21 GUN SALUTE

177 177 A GUN SALUTE IN HONOR OF AN OFFICIAL WHO ARRIVES BEFORE 0800 SHALL BE FIRED WHEN … AT 0800

178 178 TRUE OR FLASE SALUTES SHALL NOT BE FIRED BETWEEN SUNSET AND SUNRISE, BEFORE 0800, OR ON SUNDAY EXCEPT WHEN INTERNATIONAL COURTESY DICTATES OR WHEN RELATED TO DEATH CEREMONIES. TRUE

179 179 TRUE OR FALSE IF THE OCCASION IS ON SUNDAY, THE SALUTE SHALL BE FIRED ON MONDAY ONLY IF THE OFFICIAL REMAINS ONBOARD THE SHIP OR STATION. TRUE

180 180 WHAT IS THE INTERVAL BETWEEN GUN SALUTES… 5 SECONDS

181 181 TRUE OR FLASE: USING TONES TO ANNOUNCE THE ARRIVAL OF A CIVIL OFFICIALS PART OF THE RENDERING HONORS. FALSE

182 182 WHATS IS THE PROPER ANNOUNCEMENT FOR THE ARRIVAL OF THE PRESIDENT OF THE UNITED STATES… UNITED STATES ARRIVING

183 183 HOW MANY RUFFLES AND FLOURISHES ARE REUIRED FOR A CABINET LEVEL OFFICIAL… FOUR

184 184 TRUE OR FLASE: SIDE BOYS ARE NOT PARADED BETWEEN SUNSET AND TRUE

185 185 DURING GUN SALUTES, PERSONS ON THE QUATERDECK SHALL.. RENDER HAND SALUTE

186 186 HOW MANY TONES ARE SOUNDED TO ANOUNCE THE ARRIVAL OF THE SECRETARY OF TRANSPORTATION. 8 TONES, 4 PAIRS

187 187 WHAT MUSIC COMPOSITION IS REQUIRED DURING AN OFFICIAL VISIT FROM A CABINET LEVEL OFFICIAL… ADMIRALS MARCH

188 188 HOW MANY GUN SALUTES ARE REQUIRED FOR THE SECRETARY OF TREASURY UPON DEPATURE FROM A UNIT. A. 21 B. 19 C. 17 D. 15 B

189 189 WHAT IS THE NORMAL INTERVAL FOR GUN SALUTES.. A. 1 MINUTE B. 30 SECONDS C. 15 SECONDS D. 5 SECONDS D

190 190 HOW MANY SIDE BOYS DOES THE SECRETARY OF HOMELAND SECUIRTY RECEIVE.. A. 8B. 6C. 4D. 2 A

191 191 IF A SHIP HAS TWO MASTS WHERE IS THE CG ENSIGN FLOWN DURING PERIODS OF DRESS SHIP… A. TRUCK B. FOREMAST C. STARBOARD YARDARM D. PORT YARDARM B

192 192 WHAT IS THE FIRST FLAG USED IN THE RAINBOW OF FLAGS FOR FULL DRESS.. A. FLAG 5 B. FLAG 4 C. FLAG 3 D. FLAG 1 C

193 193 WHAT MUSICAL COMPOSITION IS FOR THE PRESIDENT… NATIONAL ANTHEM

194 194 WHAT MUSICAL COMPOSITION IS FOR THE SEC DEF, SEC HLS… HONORS MARCH

195 195 WHAT MUSICAL COMPOSITION IS FOR OTHER CABINET OFFICIALS… ADMIRALS MARCH

196 196 WHAT MUSICAL COMPOSITION IS FOR FOREIGN DIGNITARIES… FOREIGN NATIONAL ANTHEM

197 197 WHEN DOES PIPING COMMENCE… WHEN THE OFFICIAL STEPS ON THE BROW OR ACCOMODATION LADDER.

198 198 WHEN DOES PIPING ENDS… WHEN THE OFFICIALS TRANSIT BETWEEN THE SIDEBOYS IS COMPLETE.

199 199 WHAT DOES THE TERM MEAN DRESS SHIP.. THE DISPLAYING OF NATIONAL COLORS AT ALL MASTHEADS AND THE FLAGSTAFF.

200 200 DURING DRESS SHIP, ON A SINGLE MAST VESSEL, WHERE IS THE CG ENSIGN FLOWN. AT THE STARBOARD YARDARM.

201 201 TRUE OR FLASE: SHIPS NOT UNDERWAY SHALL BE FULL-DRESSED FROM 0800 UNTIL SUNSET. TRUE

202 202 THE RAINBOW SHALL BE DISPLAYED, REACHING FROM THE FOOT OF THE ______ TO THE MASTHEAD AND THEN TO THE FOOT OF THE ______. A. JACKSTAFF B. FLAGSTAFF

203 203 WHAT IS THE PROCEDURE IF ONE SET OF FLAGS DOES NOT COMPLETE THE RAINBOW… REPART THE SEQUENCE STARTING WITH FLAG 3, FLAG 4 AND SO FORTH.

204 204 IN THE RAINBOW OF FLAG SEQUENCE, NUMBER 38 REPRESENTS WHAT FLAG/PENNANT… OSCAR

205 205 DURING THE HONORS FOR PASSING WASHINGTONS TOMB, WHEN DOES THE TROLLING CEASE… AT THE LAST NOTE OF TAPS

206 206 WHILE PASSING THE USS ARIZONA MEMORIAL, WHAT ACTION IS REQUIRED BY ALL PERSONS ON DECK IN VIEW AND NOT IN RANKS… HAND SALUTE

207 207 ON OCCASIONS OF DRESSING SHIP, THE LARGEST NATIONAL ENSIGN IS DISPLAYED FROM THE… FLAGSTAFF

208 208 THE RENDERING HONORS TO WASHINGTONS TOMB, WHEN IS TAPS SOUNDED… WHEN OPPOSITE WASHINGTONS TOMB

209 209 HOW MANY FLAGS ARE IN THE RAINBOW… 65

210 210 WHEN PASSING WASHINGTONS TOMB WHEN MUST THE NATIONAL ENSIGN BE HALF-MASTED… AT THE BEGINNING OF THE TOLLING OF THE BELL.

211 211 WHAT MUST BE SOUNDED WHEN PASSING THE USS ARIZONA MEMORIAL… ATTENTION

212 212

213 213 BM1 PART 5

214 214 WHAT CHAPTER WITHIN COMDINST.M B (SERIES) CONTAINS HONORS AND CEREMONIES INFORAMTIO214N REGARDING CHANGE OF COMMAND. CHAPTER 14

215 215 IN PREPARATION FOR A CHANGE OF COMMAND CEREMONY WHAT IS THE MOST IMPORTANT AND REQUIRES THE MOST TIME… THE PRE-CEREMONY REQUIREMENTS

216 216 WHAT WOULD A SIMULATED BROW BE USED FOR.. FOR SHORE CEREMONIES

217 217 WHAT IS THE PURPOSE OF A DRY RUN CEREMONY… ALLOW THE MC AND OTHER PERSONNEL TO GO THRU A PRACTICE RUN TO CHECK TI217217MING AND GLITCHES.

218 218 TRUE OR FALSE THE CO IS NOT REQUIRED TO PROVIDE TO PROVIDE THE PCO WITH A GP RECORD AND DATE.. FALSE

219 219 WHO HAS FINAL DECISION ON PRESS RELEASE INFORMATION CO AND PCO

220 220 DURING THE CEREMONY, WHO READS THEIR ORDERS FIRST.. CO

221 221 WHAT IS THE CHAPLINS RESPONSIBILITY… DELIVER THE BENEDICTION

222 222 HOW MANY GUN SALUTES ARE REQUIRED FOR THE SECRETARY OF TREASURY UPON DEPATURE FROM A UNIT. A. 21 B. 19 C. 17 D. 15 B

223 223 WHAT IS THE NORMAL INTERVAL FIR GUN SALUTES.. A. 1 MINUTE B. 30 SECONDS C. 15 SECONDS D. 5 SECONDS D

224 224 HOW MANY SIDE BOYS DOES THE SECRETARY OF HOMELAND SECUIRTY RECEIVE.. A. 8B. 6C. 4D. 2 A

225 225 IF A SHIP HAS TWO MASTS WHERE IS THE CG ENSIGN FLOWN DURING PERIODS OF DRESS SHIP… A. TRUCK B. FOREMAST C. STARBOARD YARDARM D. PORT YARDARM B

226 226 WHAT IS THE FIRST FLAG USED IN THE RAINBOW OF FLAGS FOR FULL DRESS.. A. FLAG 5 B. FLAG 4 C. FLAG 3 D. FLAG 1 C


Download ppt "1 BM1 NEW COURSE. 2 MLC COMPLIANCE LESSON #1 3 ARE MLC COMPLIANCE INSPECTIONS JUST FOR LARGE CG UNITS? TRUE OR FLASE FALSE."

Similar presentations


Ads by Google