Presentation is loading. Please wait.

Presentation is loading. Please wait.

5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY.

Similar presentations


Presentation on theme: "5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY."— Presentation transcript:

1 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start The first thing to consider will be the task you are to perform. Common tasks done by someone with a Basic Rigging License are : Dogging work such as slinging loads and directing movement of plant and equipment Erecting steel structures Setting up or dismantling cranes or hoists Placing pre-cast concrete Setting and dismantling safety nets and static lines Erecting mast climbers Installing cantilevered crane loading platforms Installing perimeter safety screens and shutters. Ground Stability SWMS Related Topics: 1. Plan Job

2 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Insufficient lighting 1. Plan Job You need to make sure that the work area is properly lit up and that you can see clearly. You may need to have temporary lighting set up while you do the rigging work.

3 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start The Hierarchy of Hazard Control is made up of elimination, substitution, isolation, engineering measures, safe work practices and personal protective equipment. Both the employer and employee have duty of care responsibilities. Plan Job - Summary Assess the task before you begin. Check site rules/procedures and site conditions before you start work. A hazard is anything that can hurt you or cause damage. Plan for the forces and loads associated with the work you are going to perform. Make sure you use equipment in line with workplace/industry procedures and manufacturers specifications. Include safety equipment and communication methods in your work plan. 1. Plan Job

4 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start SWL / WLL of lifting gear Calculating the SWL/WLL of unmarked lifting gear There are several rule of thumb formulas for working out the WLL of slings. 2. Select and Inspect Equipment diameter radius circumference

5 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start A chain should not be used if it has the following damage: Chain defects spot-welded links cracks heat affected rust gouged, cut or worn* twisted links damagedpittingstretching *more than 10% of the original diameter of the link. 2. Select and Inspect Equipment Record and Report Faults Related Topics:

6 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Before you start the rigging work you will need to make sure that there are hazard prevention and control measures in place. This could include but is not limited to: Hazard prevention and control measures Restricting access to the area (isolating the area) with barricades and traffic control to make sure that loads will not pass over the top of people or that people will not get too close to any erecting or dismantling work. Removing any hazardous material that may get in the way. Moving any equipment, vehicles or other mobile plant that is not directly involved in the rigging work out of the area. 3. Set Up Task Risk Assessment Hazard Risk Risk Management Related Topics:

7 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Safety gear There are a number of things to consider when installing a fall arrest system (static line): Installing a fall arrest system (static line) The static line should be NO LESS than 2.1 metres from the work area. The anchor point of a single span static line should be able to hold 40kN of force. The minimum friction pressure on the anchor point of a single static line is 4 tonne (40kN). The sag of a single span safety line should be no more than 50mm. The maximum span of a single span safety line is 4 to 6 metres. Check that anchor points are installed in work platforms or on rooftops/structures. 3. Set Up Task

8 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Hand and whistle signals There is a series of hand and whistle signals that fall under AS – 2002 (Australian standard). The rigger and the crane operator need to check that they understand the signals that are going to be used. Signals can vary on different sites. 1 long 4. Erect Structures and Plant Hand and Whistle Signals Related Topics:

9 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Lifting equipment Check with your supervisor to find out if there is a standard inspection checklist used on site for post operational checks of equipment or plant. You should check lifting gear for: Damaged spreader beam Excessive wear on a shackle Wear or damage Damage Stretching Stretched parts Broken wires Cut/damaged fibres. Broken wires on a FSWR Damaged fibres on a rope Damage to hydraulic rams 5. Dismantle Structures and Plant start

10 5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY LTD Rigging Quiz DEMO ONLY – LINKS HAVE BEEN DISABLED next prev start Store equipment Make sure that all equipment is stored in a safe way so it will not be dangerous for the next person using it. Check the site rules or manufacturers specifications for instructions or guidelines on storing the equipment. Lifting gear should be stored correctly. Store lifting gear under cover in a clean, dry and well ventilated place. Lifting gear is often stored on a rack. Packing and outrigger mats may be stored on the mobile plant. Make sure they are secured properly before the vehicle moves off. NEVER store slings on the ground or floor. 5. Dismantle Structures and Plant

11 5. Dismantle Structures and Plant 5. Dismantle Structures and Plant 4. Erect Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 2. Select and Inspect Equipment 1. Plan Work Rigging Quiz EASY GUIDES AUSTRALIA PTY LTD AUSTRALIA PTY LTD QUIT DEMO ONLY – LINKS HAVE BEEN DISABLED prevnext Question 4. What would you do if it started to rain heavily while you were doing rigging work? click for answer Stop working until the rain has cleared. Re-check the ground before continuing work. Element 1–Plan Work start Rigging Quiz

12 5. Dismantle Structures and Plant 5. Dismantle Structures and Plant 4. Erect Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 2. Select and Inspect Equipment 1. Plan Work Rigging Quiz EASY GUIDES AUSTRALIA PTY LTD AUSTRALIA PTY LTD QUIT DEMO ONLY – LINKS HAVE BEEN DISABLED prev Question 5. Should a rigger work on structural steel that is wet from rain or fresh paint? click for answer No. Element 1–Plan Work end Rigging Quiz


Download ppt "5. Dismantle Structures and Plant 4. Erect Structures and Plant 3. Set Up Task 2. Select and Inspect Equipment 1. Plan Job QUIT EASY GUIDES AUSTRALIA PTY."

Similar presentations


Ads by Google