Download presentation
Presentation is loading. Please wait.
Published byMateo Oare Modified over 10 years ago
1
Flip this House Indiana! WE BELIEVE!!
2
Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000 kitchen floor$300 laminate$800 Trim Base$500 Paint$500 Toilets$300 Showers$600 Tub$150 Vanity$500 Hardware$250 Doors$500 Dishwasher$350 Landscape$1,000 Foreman$1,500 $24,050 Sale Price$123,300 Repairs$24,050 Real Estate Commission$6,165 Debt$93,000 Profit/Loss$85
3
Major Issues Possession of House –Danny work with Mike to begin Eviction and continue communication with Tenant to gain possession. The sooner the better. –Judge may need to be aware of the crew coming to fit up the house. Hopefully he will clear possession in time. Septic/Perk Test –Waiting for info from health department as to results of perk test. If perk test passes does health department need to approve site. –Get quotes –If perk test does not pass, next course of action? Sump Pump –Is there one? Where should it go? Can we install? Floor Joist Mold –Schedule fogging before we arrive Termite Damage HVAC –Schedule service before we arrive Moldy Insulation
4
Whole House Painting Baseboards/Trim Windows
5
Outside Stump removal –Quote to have someone remove Landscaping –Simple but attractive Gutters –Quote for seamless Rain cap Paint Soffit Clean debris from roof Pressure Wash Address half finished fence
9
Front Living Hope for Raydoubtful(no cash for material) Cut out bi-level floor joist and recap. Install sub floor and steps. Electrical outlets Drywallwalls, ceiling, Ceiling fan Flooring
11
Down Stairs Hallway Replace Paneling Flooring Ceiling Closetsliding door and hole in floor
13
Master Bedroom Closet doors FlooringTear out. Master door
14
Master Bathroom Remove French Butt Cleaner New Double Vanity Sinks Knobs on cabinetry Mirror/Light Fixtures Tub/Toilet/Shower Sub Floor Fixtures Professional Plumbing
18
2 nd Bedroom First Floor Closet Door Threshold
19
Kitchen Ceiling Floor Hardware Dishwasher Sink Fixtures Counter Top? Paneling Wall/Chair rail?
21
Utility Room/Half Bath Ceiling Floor Vanity/Toilet Bathroom Walls
24
Play Room Flooring Ceiling Walls Sliding Door Window with vent?
26
Upstairs Carpet Floors Bathroom Vanity/Shower/Toilet Broken Window Closet Door/Hardware
29
Team Matt Albertson Danny Albertson Andy Albertson Gary Herbert Charlie Workman Charles Beaman Rob Workman Jeremy Burns Michael Hamilton & Sons David Absher? Dave Miller?
30
Weekend Timeline December 7,8,9 th
31
Tools/Supplies Needed Dumpster Air Compressors
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.