Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, September 2002 Date.

Similar presentations


Presentation on theme: "September 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, September 2002 Date."— Presentation transcript:

1 September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date Submitted: 13 July 2002 Source: Michael Seals, Intersil Address 2401 Palm Bay Rd NE, Palm Bay, FL 32905 Voice: , FAX: , Abstract: This document highlights the actions taken by the IEEE WG during the September 2002 Plenary meeting in Monterey, California Purpose: Liaison report Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P M. Seals, Intersil

2 TG2 Status This Week Continued comment resolution. Next Steps
September 2002 TG2 Status This Week Continued comment resolution. Next Steps Ready for recirculation ballot in Progress on AWMA depends on the vote in today. M. Seals, Intersil

3 September 2002 TG3 Status This Week Continued comment resolution on recirculation ballot (LB 19). Next Steps Ad hoc meeting for BRC scheduled for October to continue comment resolution. Try to get to sponsor ballot after November meeting. M. Seals, Intersil

4 September 2002 TG4 Status This Week Continued comment resolution from recirculation ballot (LB 20). Next Steps Finish incorporating editorial changes from the result of the LB 20 before October 14. Anticipate sponsor ballot after September meeting to be completed by November meeting. M. Seals, Intersil

5 doc.: IEEE 802.11-<doc#>
<month year> doc.: IEEE <doc#> September 2002 SG3a Status This Week Elected a slate of officers for the Task Group Chair – Bob Heile Vice-chair – Chuck Brabenac Technical Editor – Rick Roberts Secretary – Len Miller Continued work on UWB channel model. Continued work on the PAR, technical requirements, and selection criteria documents. Next Steps Anticipate Task Group status in January meeting. Continue refinement of the selection criteria and technical requirements. M. Seals, Intersil M. Seals, Intersil


Download ppt "September 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, September 2002 Date."

Similar presentations


Ads by Google