Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE <doc#>

Similar presentations


Presentation on theme: "doc.: IEEE <doc#>"— Presentation transcript:

1 doc.: IEEE 802.11-<doc#>
<month year> doc.: IEEE <doc#> May 2003 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, May 2003 Date Submitted: 14 May 2002 Source: Michael Seals, Intersil Address 2401 Palm Bay Rd NE, Palm Bay, FL 32905 Voice: , FAX: , Abstract: This document highlights the actions taken by the IEEE WG during the May Interim meeting in Dallas, TX. Purpose: Liaison report Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P M. Seals, Intersil <author>, <company>

2 General Did not meet this week TG2 TG4
May 2003 General Did not meet this week TG2 TG4 Low Power UWB Interest Group (since most TG4 members were not present) SG15.1a M. Seals, Intersil

3 TG3 Status This Week to Date
May 2003 TG3 Status This Week to Date Finalized editorial comments for the IEEE-SA Prepare for RevCom approval Remainder of the Week Nothing Next Steps Address any RevCom issues that may arise M. Seals, Intersil

4 TG3a Status This Week to Date
May 2003 TG3a Status This Week to Date Heard 12 refined proposals for the Alternate PHY Several technical contributions were presented Remainder of the Week Additional technical contributions will be heard this afternoon Q&A session on the proposals Thursday at 8 Joint meeting with Thursday at 10:30 Editing of the selection criteria and down selection process documents Thursday afternoon Next Steps Proposal refinement leading up to the July meeting All proposals will have a chance to present in July before the first down-selection vote M. Seals, Intersil


Download ppt "doc.: IEEE <doc#>"

Similar presentations


Ads by Google