Presentation is loading. Please wait.

Presentation is loading. Please wait.

An IT Integrated Township in Mohali By Sukhm Infrastructures Pvt. Ltd.

Similar presentations


Presentation on theme: "An IT Integrated Township in Mohali By Sukhm Infrastructures Pvt. Ltd."— Presentation transcript:

1 An IT Integrated Township in Mohali By Sukhm Infrastructures Pvt. Ltd.

2 YellowStone Landmark Infocity is an SPV floated by Urban Infrastructure, Berggruen Holdings, Banyan Real Estate and YellowStone Builders. It has been conceptualized to be developed a state of the art Integrated IT Township complete with international features for a quality working environment and comfortable lifestyle. Infocity shall be one of the few IT Parks in India today that is offering Walk-to-Work concept to the people working in Infocity. It shall offer Apartments and Bungalows within the Infocity complex designed for optimum comfort and convenience, keeping in view contemporary lifestyles of corporate executives.

3

4 SITE (220 ACRES) PROPOSED SECTOR ROAD PROPOSED ROAD CONNECTION SITE – 95 ACRES, II PHASE SECTOR 66-A SECTOR 81 RAILWAY LINE SECTOR 82 PROPOSED ROAD SECTOR 65 AIRPORT Site Analysis:

5 YellowStone Landmark Infocity is the 1 st IT Integrated Township coming up in 220 acres to be developed in phases at Sector 66-A in Mohali, complete with all components like: Residential – 2/3/4/5 BHK Apartments & Penthouses, Villas, Plots IT/Industrial – Office Space Towers, Plots Commercial – Hypermarket, Malls, Multiplexes, SCOs, Booths Hospitality – 5 Star Deluxe Hotel, Multi-facility 3 Star Club Services – Golf Course, International School, 100 bed hospital

6 Why to live in the outskirts when you have a premium address in the heart of the city. The location of YellowStone Landmark Infocity is one of the best available options in the tricity. There are 4 main 100 ft. roads which pass through Infocity all heading the International Airport / Aerocity / Tribune circle / Phase – 10, 11 / Sec. 48, 49 & 50. (all residential sectors) It is like living in the city close to all major landmarks. As of today the site is accessible through 100 ft. existing road adjoining Mohali railway station. An individual is safe & secure while coming and going to Infocity as of today also, as it lies in the heart of the city bordering Sec.66, Phase-11 & Sec.48 (all residential sectors). It is 1.3km from the International Cricket Stadium.

7 The main road to the International Airport Passes Through the Infocity and two 5 Star Deluxe hotels are coming up on the same road, within Infocity. Infocity is strategically located close to: Chandigarh Airport & Upcoming International Airport Adjoining Mohali Railway Station Adjoining Aerocity Mohali 15 min. from Chandigarh main CBD (Sec. 17) 15 min. from Chandigarh Railway Station 1.5kms from PCA, Cricket Stadium 2.5 km from Fortis Hospital

8

9 YellowStone Landmark Infocity brings – Residential plotting sizes 200/300/400 sq. yards, IT spaces. affordable apartments, and premium apartments towers comprising of 2/3/4 bedroom sized apartments of various sizes from approx. 1260 – 4200 sq.ft. The apartments are complete with all ultra modern facilities and designed to reduce wastage of space thereby increasing comfort. It is a secured residential community with ample green spaces and recreational facilities.

10 YellowStone Landmark Infocity Sukhm Infrastructures Pvt. Ltd. Price List - PLOTS (Residential, Industrial & IT Spaces) Category Size (Sq Yd.) BSP(Sq. Yd.)Booking Amount 15% With in 40 Days 15% (30%) 4 Installments of 15% 10% On Possession Total RESIDENTIAL PLOTS 200380001140000228000045600007600007600000 30038000171000034200006840000114000011400000 40038000228000045600009120000152000015200000 Size (Sq. ft.) BSP(Sq. ft.)Booking Amount 15% With in 45 Days 10% (25%) 6 Installments of 11.5% 6% On Possession Total IT SPACES 650510049725082875022873501989003315000 9005100688500114750031671002754004590000 12005100918000153000042228003672006120000 150051001147500191250052785004590007650000 2500510019125003187500879750076500012750000 Size (Sq. Yd.) BSP(Sq. Yd.) Booking Amount 27.5% With in 40 Days 12.5% (40%) 4 Installments of 12.5% 10% On Possession Total INDUSTRIAL PLOTS 500140001925000280000035000007000007000000 100014000385000056000007000000140000014000000

11 DOWN PAYMENT PLAN (with 5% rebate on Basic Sale Price) On Registration 30% of the BSP Within 50 days of Registration 60% of Sale Price On Possession 10% of Sale Price + PLC (Note 6) INSTALLMENT – PAYMENT PLAN Linked Stages Payment On Registration 15 % of the BSP Within 30 days of registration 15 % of the BSP Stages of Next Installment from March onwards: I - 1st Installment due in March, 201215 % of the BSP II – 2 nd Installment15 % of the BSP III - 3 rd Installment15 % of the BSP IV – 4 th Installment15 % of the BSP IV - On possession 10 % of Sale Price + PLC + Stamp Duty & Registration Charges. Notes: PLC - Park Facing Location, Major Road Location, Corner Location: For Major Road – 50 ft. wide = 10 % of the BSP For Park Facing Location = 5 % of the BSP For Corner Location = 10 % of the BSP EDC (Extra Development Charges) included.

12 INSTALLMENT – PAYMENT PLAN Linked Stages Payment On Registration with promoters27.5 % of the BSP Within 15 days of registration with promoters7.5 % of the BSP Issuance of Allotment Letter5 % of the BSP I - Start of laying of 100 mt. road (Unmetalled) 12.5 % of Sale Price II - Start of laying of Drainage & storm water lines12.5 % of Sale Price III - Start of laying of Electrical cables & street lights 12.5 % of Sale Price + 33.33 % PLC & IFMS IV - Providing accessibility through metalled roads12.5 % of Sale Price + 33.33 % PLC & IFMS V - On possession of the plot after demarcation 10 % of Sale Price + 33.33 % PLC & IFMS + Stamp Duty & Registration Charges Notes: For Major Road – 60 ft. wide = 10 % of the BSP For Park Facing Location = 5 % of the BSP For Corner Location = 10 % of the BSP

13 YellowStone Gardens - Affordable Apartments (G + 10) AFFORDABLE S. No. Super Area (sft) Acco. Rate psf (Semi - F) BSP (Semi - F) Main Specifications (Semi - Finished) 112602BHK35004200000 Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Ambulance, Power backup 216253 BHK35005687500 Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Ambulance, Power backup 318003BHK+study35006300000 Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Ambulance, Power backup 420004BHK35007000000 Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Ambulance, Power backup NOTES: 1. Club Membership – 1 lac Rupees5. Service Tax if applicable to be paid by the Buyer 2. PLC - First Floor = 10%; Top Floor = 7.5 %6. Booking amount = 12.5 % + 12.5 % within 40 days (Construction Linked ) 3. Parking = Rs.2 lac per parking. 50 % off for the first 100 bookings 4. IFMS = Rs.50 per sq.ft. YellowStone Gardens - Affordable Apartments (G + 10) AFFORDABLE S. No. Super Area (sft) Acco. Rate psf (Semi - F) BSP (Semi - F) Main Specifications (Semi - Finished) 112602BHK41005166000Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup 213602 BHK41005576000Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup 316503BHK41006765000Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup 417153BHK41007031500Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup 517753BHK+MUR41007277500Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup 618503BHK+MUR41007585000Mod Kitchen; Master bed cupboard; Flooring; Bath fittings; Power backup NOTES: 1. Club Membership – 1 lac Rupees5. Service Tax if applicable to be paid by the Buyer 2. PLC - First Floor = 10%; Top Floor = 7.5 %6. Booking amount = 12.5 % + 12.5 % within 40 days (Construction Linked ) 3. Parking = Rs.2 lac per parking. 4. IFMS = Rs.50 per sq.ft.

14 Basic Sale Price As Applicable Down Payment Rebate.5 % (On 82.5 % of Basic Sale Price Only) DOWN PAYMENT PLAN (with 10% rebate on 82.5 % of Basic Sale Price) On Registration with promoters 12.5 % of BSP Within 40 days of Registration with promoters82.5 % of BSP + PLC On Offer of Possession 5% of Sale Price + IFMS + Stamp Duty & Registration Charges INSTALLMENT PLAN (Construction Linked) Linked Stages Payment On Registration with promoters12.5 % of BSP Within 40 days of registration with promoters12.5 % of BSP On start of construction / Completion of Excavation10 % of BSP On completion of Basement roof slab10 % of BSP On completion of 2 nd floor roof slab10 % of BSP On completion of 5 th floor roof slab10 % of BSP + 33.33 % PLC & IFMS On completion of 8 th floor roof slab10 % of BSP On completion of 10 th floor roof slab10 % of BSP + 33.33 % PLC & IFMS On completion of plastering & elec. Cabling10 % of BSP On Offer of possession 5 % of BSP + 33.33 % PLC & IFMS + Stamp Duty & Registration Charges

15

16

17

18

19 Jurong Consultants, Singapore: (Master planning, Landscape & Infrastructure Engg. Services) Benoy, UK: (Building, Design Architects) Kant & Associates: (Local Consultants & Architects)

20 Infocity is bound to become a hotspot for the future IT activity in the country based upon its robust IT infrastructure combined with dedicated and captive power sources and topped with the Lifestyle component that will be operational from Infocity. We aim to create and deliver an IT Integrated Township par excellence

21 Thank you! Sukhm Infrastructures Pvt. Ltd. SCO 123-124, 3 rd Floor, Sector 17 – C, Chandigarh. Phone: +91-172-2724671-73 Mob. 9814412946,9216111001. www.ylinfocity.in


Download ppt "An IT Integrated Township in Mohali By Sukhm Infrastructures Pvt. Ltd."

Similar presentations


Ads by Google