WE are ISO 9001-:2008 CERTIFIED EPIC contractor in Oil and Gas Industry MAIN AREA OF BUSINESS: Mechanical – Specialized in Major Turnaround Maintenance.

Similar presentations


Presentation on theme: "WE are ISO 9001-:2008 CERTIFIED EPIC contractor in Oil and Gas Industry MAIN AREA OF BUSINESS: Mechanical – Specialized in Major Turnaround Maintenance."— Presentation transcript:

1

2 WE are ISO 9001-:2008 CERTIFIED EPIC contractor in Oil and Gas Industry MAIN AREA OF BUSINESS: Mechanical – Specialized in Major Turnaround Maintenance Works & Tank Rehabilitation. Electrical & Instrumentation Civil Blasting, Coating, Insulation & Fire-Proofing Scaffolding Trading

3 MAJOR ACHIEVEMENTS One of the largest contractor at QP Refinery Only Contractor to receive appreciation letter from QP for completing the QP turnaround works ahead of schedule with best quality & safety achievement. Largest contractor in Qatar having wide experience in Tank rehabilitation and Maintenance works.

4 ETS MECHANICAL ELECTRICAL & INSTRUMENTATION CIVILBLASTINGCOATINGINSULATION FIRE PROOFING SCAFFOLDING TRADING

5 The Mechanical Division has a wide experience in EPIC & Maintenance Contracts in Oil & Gas, Petrochemical and Fertilizer Industries. CORE BUSINESS: Plant Turnaround Maintenance Works Rehabilitation of storage tanks EPIC Contracts for Mechanical Installations Maintenance of Rotatory and Static Equipment Specialized in Industrial Cleaning GRE Piping - Installation and Maintenance

6 The E&I Division has a wide experience in EPIC and Maintenance Contracts in Oil & Gas, Petrochemical, Fertilizer & Commercial Industries. CORE BUSINESS: Installation of HV, MV Switchgears, PCC, MCC and Switchboards Cable Laying, Termination & Testing and Commissioning Testing & Commissioning of Transformers Installation, Testing and commissioning of street light system EPIC of CP System Installation of bus duct and bus bar system DCS, PLC, ESD,F & G, SCADA & CCTV, Field Instruments

7 The Civil Division has a wide experience in EPIC Contracts in industrial, Commercial and residential facilities construction and maintenance. CORE BUSINESS: EPIC of Buildings, Warehouses, Workshops, Control Rooms and Substations. Construction of Industrial, Commercial and Residential Projects. Civil Infrastructure for Industrial Projects like Under Ground Services Foundations for heavy equipment including Design & Detailed Engineering Earthworks, Sheet Piling, Dewatering Utility Services, Structural & Steel Erection Maintenance works. Construction of Roads, Landscaping Construction of Filling Stations

8 This Division has a wide experience in Blasting, Coating and Insulation during Plant Maintenance, construction & Installation contracts in Oil & Gas, Petrochemical, Fertilizer & Commercial Industries. CORE BUSINESS: Epoxy - 100% solids, coal tar, phenolic coatings Glass flake reinforced vinyl ester, polyester, phenolic & epoxy systems Zinc - organic and inorganic, moisture-cured Polyester based coating systems Silicones & high temperature coating systems 100% expanded or unexpanded, aliphatic and aromatic urethanes Acrylics, alkyds - water and oil Cementatious fire-proof coatings & intumescent coating systems Chlorinated rubber coatings & heat-resistant coating systems Hot and Cold Insulation Fire Proofing Works

9 This Division has a wide experience in Scaffolding during Plant Maintenance, construction & Installation contracts in Oil & Gas, Petrochemical, Fertilizer & Commercial Industries. CORE BUSINESS: Conventional tube & fitting scaffolding Load Bearing Scaffolding Baskets and Rigging by cables and boards. Suspended scaffolding works

10 This Division has a wide experience in trading of mechanical equipment for Oil & Gas, Petrochemical, Fertilizer, Commercial & Steel Industries. CORE BUSINESS: Supply of mechanical equipment & Spares Supply of Computer Numerical Control Machines to Nakilat (Ship Repair Yard) Vertical Turning Centre- IMT Machines- Italy. Pipe and Angle Cutting Machine to a Diameter of 800mm (BEHRINGER- Germany) Supply of Automatic Pipe Flange Welding Machine by using Robot DEUMA-Germany) Supply of welding Generators and Diesel Generators Supply monopoles for QTEL Supply of Machine Tools from HMT (India) to Nakilat (Ship Repair Yard)

11

12

13

14 ETS VISION AND QUALITY POLICY ETS VISION AND QUALITY POLICY

15 COMPANY HEALTH AND SAFETY POLICY

16 COMPANY ENVIRONMENT POLICY

17 OUR GOALS OUR GOALS Zero Accident & Time Loss involving Direct and Third Party Workers. Zero Equipment Accident & Time Lost involving Direct &Third Party Equipment Zero Property Damage Accidents and Incidents Zero Environmental Damages, Accidents and Incidents Zero Accidents & Time Loss on Travel to and from work sites

18 MANPOWER STATISTICS FROM YEAR 2008-2012 MANPOWER STATISTICS FROM YEAR 2008-2012

19 MANPOWER GROWTH

20

21 SAFETY STATISTICS FROM YEAR 2008 TO 2012 Safety environment is our commitment

22 Build ETS into an enviable entity by Demonstrating excellence in all activities undertaken by the company Solve problems innovatively Preserve and improve human life. Corporate social responsibility Honesty & integrity Consistency in Quality It is easy to write these words … it is far more difficult to see these fulfilled in reality. As the foundation of ETS is built of skill, integrity, and responsibility, we were able to achieve our goal… ETS MISSION

23 Facilities

24 Site Activities

25

26

27 Completed Projects SrContract NoClientContract DescriptionDuration Start Date End Date 1 GEN/973/07-2005Q-TelFinishing works at basement level for new HQ.2Months4/17/20056/16/2005 2 GEN/984/18-2005Q-Tel Construction of steel structure room to accommodate data center at NOC project 2Months6/12/20058/25/2005 3 GEN/1027/61-2005Q-Tel Construction of substation at new industrial area exchange 4Months1/1/20065/1/2006 4 GEN/993/27-2005Q-TelExtension of APN RLU building6Months6/8/200612/3/2006 5 GTC/06/237/OED Qatar Petroleum Rehabilitation of crude oil and fire water tanks within Dukhan fields 2years12/3/200611/15/2008 6 MWC/06/122 Qatar Petroleum Installation and commissioning of new band saw machine including training at of QP personnel at Dukhan field support workshop 2Days1/23/20071/25/2007 7 MWC/07/036 Qatar Petroleum Cleaning and inspection of E1105A, E1106 and E1116 at FSP Plant within Dukhan fields 4Days4/8/20074/12/2007 8 MWC/07/021 Qatar Petroleum Maintenance and inspection of regeneration gas cooler at Fahail main dehydration plant within Dukhan fields 17Days5/7/20075/24/2007 9 MWC/07/037 Qatar Petroleum Maintenace and inspection of 31-E-4002 hot oil exchanger at Jaleha degassing in the Daukhan fields. 9Days5/13/20075/22/2007

28 Completed Projects 10MC07100400 Qatar Petroleum GRE 12" Line replacement on 31P4022 fire water pump discharge line at jaleha degassing station within Dukhan fields. 9Days7/23/20078/2/2007 11LTC/07/130 Qatar Petroleum Plant shutdown works at power water injection stations within Dukhan fields 9Months9/2/20075/28/2008 12MC07107600 Qatar Petroleum Maintenance and inspection of 31-E-4002 hot oil exchanger at Jaleha degassing in the Dukhan fields. 1month12/25/20071/24/2008 13GTC/07/158/FPBlack Cat EPIC for smokeless flare & automatic blow down 7 Months10/9/20084/9/2008 14 GTC/06/264 OED Danway Construction of substation including civil works for Qatar Petroleum Dukhan 6Months5/30/200811/30/2008 15 GTC/07/122/OE D Danway Construction of substation including civil works for Qatar Petroleum Dukhan 6Months7/30/200812/30/2008 16MC08107800 Qatar Petroleum Repair of roller shutter at Ummbab 17MC08122300 Qatar Petroleum Maintenance and inspection of 14-E-5214 hot oil crude exchanger 18 APB/Agency/Ma rch/F0148 AP Bava Const Cement Plant insulation for QATAR NATIONAL CEMENT 1 month4/1/20094/30/2009 19MC09100700 Qatar Petroleum Installation of new security barriers at material3 Months3/2/20096/2/2009

29 SrContract NoClientContract DescriptionDuration Start Date End Date 1 GEN/973/07-2005Q-TelFinishing works at basement level for new HQ.2Months4/17/20056/16/2005 2 GEN/984/18-2005Q-Tel Construction of steel structure room to accommodate data center at NOC project 2Months6/12/20058/25/2005 3 GEN/1027/61-2005Q-Tel Construction of substation at new industrial area exchange 4Months1/1/20065/1/2006 4 GEN/993/27-2005Q-TelExtension of APN RLU building6Months6/8/200612/3/2006 5 GTC/06/237/OED Qatar Petroleum Rehabilitation of crude oil and fire water tanks within Dukhan fields 2years12/3/200611/15/2008 6 MWC/06/122 Qatar Petroleum Installation and commissioning of new band saw machine including training at of QP personnel at Dukhan field support workshop 2Days1/23/20071/25/2007 7 MWC/07/036 Qatar Petroleum Cleaning and inspection of E1105A, E1106 and E1116 at FSP Plant within Dukhan fields 4Days4/8/20074/12/2007 8 MWC/07/021 Qatar Petroleum Maintenance and inspection of regeneration gas cooler at Fahail main dehydration plant within Dukhan fields 17Days5/7/20075/24/2007 9 MWC/07/037 Qatar Petroleum Maintenace and inspection of 31-E-4002 hot oil exchanger at Jaleha degassing in the Daukhan fields. 9Days5/13/20075/22/2007 Completed Projects 20 NWDHGTC07/12 2/ED Danway Power supply stations in Dukhan township no. DKN-6 1 year7/30/20087/29/2009 21GC08111600 Qatar Petroleum Shutdown maintenance services at at Jaleha pant within Dukhan fields 6Months2/1/20098/13/2009 22 CCCT-PGTIL- 0018 GTL Fabrication of pipe supports for PEARL GTL project Ras Laffan 1 year9/1/200810/8/2009 23SC081055000 Qatar Petroleum Protective Coating of water Pipe spools for Dukhan Fields 4 months1/6/200930-9-2009 24GC09102900 Qatar Petroleum Turn around works at NFIS distribution stations and KHUFF plant within dukhan fields 372 days7/10/20097/10/2010 25 GTC/06/188/OE D Qatar Petroleum Removal of safety relief valves at various operational facilities within Dukhan fields 3Years11/19/200611/18/2009 26GC09101200 Qatar Petroleum Manpower support services for 2009 shutdown at QP Refinery 1 year1/18/20093/17/2010 27 GTC/06/210/FS D Qatar Petroleum Vinyl ester wrapping of pipe lines on call off basis in the Dukhan fields 3Years9/10/20069/9/2009 28GC07102000 Qatar Petroleum EPIC of Oil Free Air Screw Compressor and Air Dryers at Arab-D Plant in Dukhan 30 Months2/3/20082/10/2010 29 GT08MtT0023- 001 Qatar Petroleum Machine Tools for Nakilat Ship Repair Yard-218 Months2/6/200912/12/2010 30LC09102300 Qatar Petroleum EPIC of power supply for electrical workshop at QPSFA within Dukhan Fields Fifteen (15) months 6/12/20095/2/2011

30 Completed Projects 31MC11104700Qatar Petroleum Cleaning & Internal Inspection of Fahahil South Three Phase Separator 13v-4001 within Dukhan Fields 2 days10/7/201111/7/2011 34 GT08MT0023- 002 Qatar PetroleumMachine Toools for Nakilat Ship Repair Yard 35 GT08MT0087- 001 Qatar PetroleumSheet Metal shop requirements for Nakilat 36GTC-012/10Seef LimitedPacol Water Injection System6 Months1/4/201130/09/2011 37LC11105700Qatar Petroleum Replacement of Drift Eliminator and Pond Cleaning Works in Cooling Tower at FSP within Dukhan Fields 5 Months11/8/201110/1/2012 38GC08104200Qatar Petroleum Miscell maintenance works on call off basis in the Dukhan fields 3.3 Years12/1/20082/29/2012 39LC08104300Qatar Petroleum Maintenance of roller shutters on call off basis in Dukhan fields. 3.3 Years12/21/20083/20/2012 40TC/32/04/10QATAR FUEL Construction of WOQOD Petrol Station- Muaither 10 Months 16/12/201016.10.2011 41 GT09MT0055- 001 Qatar Petroleum Installation, testing and commissioning of Pipe Spool Fabrication Equipment-II for Nakilat Ship yard 10 Months 19/02/201119/11/2011 42LT11112000Qatar Petroleum Overhauling of 1212C1/C2/C3/C4/C5, 1306C, 1209C and 1335E at QP Refinery, Mesaieed 1 month27/01/1226.02.2012 43PO-1014337QAFAC Cementitious Fire Proofing Repair works of CCR structure up to 10 mt. level and new coating appliction on pipe supports inside Sphere tanks dyke. 2 Months15/12/1114.02.2012

31 Ongoing Projects Sl.Contract NoClientContract DescriptionDurationStart DateEnd Date 1GC08105100 Qatar Petroleum Provision of manpower for Dukhan workshop4 Years12/1/200811/30/2012 2GC09103500 Qatar Petroleum Provision of valve greasing support services on call off basis 4Years11/30/20083/10/2013 3LC08109900 Qatar Petroleum Repair/replacement of GRE Fire water pipeline3 years15-4-200914-4-2012 4LC09106400 Qatar Petroleum Maintenance of plant heaters on call-off basis within Dukhan fields. 4 Years3/1/20102/1/2014 5GC09104900 Qatar Petroleum EPIC of Mosques, Eid Musalla and Extension of Jabel Tank RTU Building within Dukhan Fields. Twenty Seven (27) Months 6/12/20095/3/2012 6GC09106400 Qatar Petroleum Pipeline Maintenance under road crossing on call-off basis within Dukhan Fields. Four (4) Years 14/02/201013/02/2014 7LC09105500 Qatar Petroleum Site cleaning services on call-off basis within Dukhan Fields. Five (5) years 1/3/201028/02/2015 8GC091098B0 Qatar Petroleum Re-Supporting and Replacement of Pipe Supports, Sand Clearance on a Call-Off Basis in Mesaieed. Five (5) years 1/4/201031/03/2015 9GTC-011/09Seef Limited Call - Off Contract for Manpower Support, for 3 Years 3 years1/5/201030/4/2013 10GTC-006/10Seef LimitedCivil Maintenance Call-off Contract3 years31/10/201031/10/2013

32 11GC10101900Qatar Petroleum Epic of Fire Training Ground Upgrade within Dukhan Fields 18 Months10/11/20109/5/2012 12LT10107300Qatar PetroleumSupply and Installation of Grating at PS/2 & PS33 years27/3/201127/03/2014 13GC111009A0Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Operations Engineering Department) 3 years15/6/201114/06/2014 14GC111009B0Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Production Department- Dukhan) 3 years1/8/201131/07/2014 15GC111009C0Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Gas Recycling Department-Dukhan) 3 years15/6/201114/06/2014 16GC111009D0Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Gas Production Operations- Dukhan) 3 years15/6/201114/06/2014 17TC/37/04/11QATAR FUELConstruction of WOQOD Petrol Station-Pearl Qatar10 Months20/9/201120/07/2012 18GC111026B0Qatar Petroleum Civil & Sand Removal Works in QP Gas Operations Areas (OffShore) for 3 years 3 years18/12/1117.01.2015 19GC11106600Qatar Petroleum Epic for the Installation of Electricity & Water Tariff Meters within Dukhan Fields 2 years30/01/1229.01.2014 20GC11105300Qatar Petroleum Civil and Electrical Refurbishment works at Various Accommodations in Dukhan Township 3 Years18/03/1217.03.2015 21TDR-035/21/2011QATAR STEELContract for Supply of Heavy Vehicle Drivers & Operators3 Years1/5/201230.04.2015 22TDR-001/23/2012QATAR STEEL Opening & Closing of DR2 Plant during April 2012 Shutdown 2 Weeks21/04/1203.05.2012 23GC11101800Qatar Petroleum Rehabilation of 83 Nos. Storage Tanks, Spheres and Bullets at QP Refinery, Mesaieed 6 years1/5/201230.04.2018 24GC11112500Qatar Petroleum Turnaround Maintenance Works at Khatiyah Plants Within Dukhan Fields 7 Months15/8/201213.03.2013 25LC12102600Qatar Petroleum Repair/replacement of GRE Fire water pipeline on Call off Basis within Dukhan Fields 3 Years14/7/201213.07.2015

33

34