1 Oil & Gas, Petrochemicals and Infrastructure Solutions December 2009

2 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 The Group Global Project Delivery for : Oil & Gas Petrochemicals Process Power Utilities Infrastructure Buildings Asset Management Telecom

3 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Punj Lloyd Group Simon Carves Polymers & Petrochemicals Chemicals Bio-fuels Sembawang E & C Buildings Infrastructure Utilities Punj Lloyd Oil & Gas /Infrastructure

4 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Punj Lloyd Overview Founded in 1989 20 years of professional excellence Active in hydrocarbon and infrastructure sectors Revenues (Group) for Year ended March 31, 2009: US$ 2,607 Million Order Backlog as on March 31, 2009 : US$ 4518 Million Employees: 11,444 Safety: Conforming to highest international standards

5 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Iran UAE Qatar Saudi Arabia Oman Libya Yemen Kazakhstan Russia China Malaysia Vietnam Indonesia India Singapore UK International Offices

6 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Skills and Capabilities Engineering Procurement Construction Post Completion Feasibility Study Master Plan Technology Packages Concept Design / FEED Cost Estimates Detailed Multi-disciplinary Design Validation Procurement Services Material Management Project Management Construction Management Construction Services Commissioning Start-up / Training Ongoing technical support Turnaround support O&M Technology improvements De-bottlenecking Plant Expansions Statutory inspection Total Delivery Capability

7 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Major Achievements of the Group All terrain pipeline specialists, over 8000 km, upto 48 dia Leading contractor in Process Plants South East Asias longest and most advanced underground tunnel expressway 1st Industrial Park in China to receive ISO9001:2000 certification 125 years of experience Only contractor involved in construction of all three LNG terminals in India Singapores LRT / MRT Changi Airport Terminal Extension Nuclear > 3 million engineering manhours Worlds largest Wheat base Bioethanol Plant

8 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Oil & Gas

9 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Gas Processing Natural Gas Pipeline in Tuas and Jurong Area, Singapore Total E&P Tambora Field Development Project Phase 2, Indonesia Peciko Field Development Phase 4 for TotalFinaElf, Indonesia KODECO Onshore EPC Services for Poleng Process Platform Petro China EPC Service for Betara Complex Development, Sumatra Gas Field Development for Oil India Limited, India

10 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Offshore & Shallow Waters Uran Trombay Jawahardeep Oil Pipeline, India Total E&P Tambora Field Development, Phase 2, Indonesia Tunu Field Development Phase 9, Indonesia Panaran Pemping Gas Pipeline, Indonesia Effluent Outfall System, India

11 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Terminals & Docks EPC Refrigeration storage tanks at Jiangsu, China Storage Terminal with 120,000 DWT berth, Singapore Oil Tanking Terminal for Oil Tanking(S) Pte Ltd, Singapore Construction of dry dock and wharves, Singapore Construction & Erection of Jetty at Pulau Seraya, Singapore Construction of Container Feeder Berth, Singapore Finger Pier extension at Sembawang Shipyard, Singapore Jetty Extension at Loyang Crescent, Singapore Karimun Shipyard Development, Indonesia Zouec / DPEC LPG Terminal Project in China

12 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Tanks and Terminals Crude / Product – Oil In-house design capability Executed 80 m dia tanks LNG Tanks Global experience of mechanical, civil and insulation work for LNG tanks Executed four LNG tanks of 160,000 m³ capacity, -162° C storage temperature, 80 m dia, 53 m height First Indian contractor to have constructed LNG regasification terminal Only contractor involved in the construction of all 3 LNG terminals in India – Dabhol, Hazira, Dahej LPG Tanks (Cryogenic) Only Indian Contractor to have executed LPG/Cryogenic tanks on EPC basis

13 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Tanks and Terminals Offsite & Storage Facilities for Panipat Refinery Indian Oil Corporation Ltd. Onshore Gas Development Phase III Abu Dhabi Gas Industries Ltd. Bulk Liquid Storage & Blending Facility at Meranti Helios Terminal Corporation Pte. Ltd., Singapore Tank Terminal Project at Pulau Busing Tankstore - Singapore LNG Storage (2X148,000M 3 ) Tank Expansion Dahej for IHI Jurong Bulk Liquid Product Terminal Horizon Terminals Pte. Ltd. - Singapore Low Storage (2x160,000 M 3 ) for Receiving Terminal Hazira for Shell LNG Storage (3X160,000M 3 ) and Regasification Terminal Dabhol for Skanska Steel Storage Tanks for Water and Power Project Technip Built in excess of 8 million m 3 of storage capacity

14 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Pipelines Successfully commissioned pipelines upto 48 diameter Own and maintain 20 spreads of pipeline equipment upto 56 dia Own 18 Automatic Welding machines. Punj Lloyd pioneered introduction of this technology in India Shallow water and swampy terrain experience Executed/Executing 9000 km of pipeline for hydrocarbon service Leading pipeline contractors in Asia Own HDD equipment upto 400 mtr

15 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Refineries EPC capability for medium size packages Completed 11 Refinery Modernisation projects in 8 years Single largest equipment lifted : 590 MT

16 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Refineries/EPC EPC Kerosene Distillation Unit Plant and Construction of Main Building & Amenities, Singapore Yemen LNG Project For Utilities & Offsites Yemen LNG Company Ltd., Yemen Fuel Systems New Doha International Airport, Qatar Peciko Field Development Phase 4, Indonesia TotalFinaelf Motor Spirit Quality Upgradation Project Indian Oil Corporation Ltd., India Delayed Coker Unit, Indian Oil Corporation Ltd., India Sulphur Block, Bharat Oman Refinery Ltd., India Hydrocracker Unit & Hydrogen Generation Unit Indian Oil Corporation Ltd., India Sulphur Blocks Six Indian Refineries 37,000 TPA Grass Root MTBE Plant Indian Oil Corporation Hydrocracker Units, Mathura Refinery Indian Oil Corporation Constructed Critical Sections CDU/VDU/VBU Indian Refineries 10.5 MTPA Essar Refinery, Vadinar, Gujarat

17 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Chemicals CRISTAL Project, Membrane Chlorine Plant; Expanded Ti02 Yanbu, Saudi Arabia 100 MTPD Sulphuric Acid Project, Saudi Arabia, Basic Chemicals National Company 1000 TPD Sulphur Burning Acid Plant, TCH Belgium Turnkey SAFCO Sulphuric Acid Project, Dammam, Saudi Arabia EPC of 45 MTPD Singapore Refining Company, Jurong, Singapore Agrochemicals Project for Syngenta, UK

18 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 Equipment Assets Large fleet of Equipment which can be readily mobilised Amphibian equipment including swamp excavators, dredgers, marsh buggies, flexiyoke work barges, swamp cranes, pushpull pipelay barge Equipment assets valued at USD 250 million 20 spreads of pipeline equipment 13 sets of bituminous road equipment 3 sets of concrete paving equipment Young equipment fleet – minimum downtime

19 Oil & Gas, Petrochemicals, and Infrastructure Solutions August 2009 THANK YOU