TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014
2
COLUMBUS TSPLOST PROJECT LISTING
3
TSPLOST PROJECTS Band 1 CY 2013 - 2015
4
COLUMBUS RIVERWALK Projected Costs: $10,000,000 PE - $1,000,000 CST - $9,000,000 Project Description: The extension of the Riverwalk behind Bibb and City Mills to complete the project Riverwalk at Bibb Mills and North Highland Dam Riverwalk at City Mills Status: Notice To Proceed – April 24, 2013 Hecht Burdeshaw is preparing construction plans All ROW has been identified. No additional property will be required Construction is anticipated by the first of 2015 As of February 20, 2014
10
INTERCITY EXPRESS BUS PARK-N-RIDE SERVICE Projected Costs: $22,400,00 Costs to include design, maintenance and operation Budget for these items still to be determined Project Description: Construction of three express bus Park-N-Ride locations in Columbus using existing sites. Proposed Trail From Infantry Museum to Levy Road Status: Notice To Proceed – April 24, 2013 Connectics Transportation Group was hired in October 2013 to perform a Public Transit Needs Assessment Assessment needed to determine how best to serve our citizens Study includes route analysis, rider surveys 2 nd Public meeting to hear citizens needs and concerns on May 8, 2014 No other activities will begin until study is completed Current METRA Route System As of February 20, 2014
12
SOUTH LUMPKIN MULTI-USE FACILITY Projected Costs: $3,500,000 PE – $ 500,000 CST - $3,000,000 Project Description: A pedestrian/bicycle facility to be built along an abandoned rail road line. This linear greenway corridor is divided by Old Cusseta Road, Victory Drive, and Fort Benning Road Status: Notice To Proceed – September 10, 2013 Heath & Lineback Engineers are the lead consultants on this project Public meeting was held on January 16, 2014 Preliminary design – May 2014 Final design – November 2014 Project Bid & Construction – January 2015 No other activities will begin until study is completed Proposed New Trail From Infantry Museum to Cusseta Road As of February 20, 2014
14
US 27/CUSTER ROAD INTERCHANGE RECONSTRUCTION/MODIFICATION Projected Costs: $20,000,000 PE – $ 1,000,000 CST - $19,000,000 Project Description: This project will provide permanent public access to the proposed property bounded by US 27 to the south, I-185 to the west, and Cusseta Road to the north and east, which is the western boundary of Fort Benning Status: Notice To Proceed – April 19, 2013 MOU with Ft. Benning has been signed by all parties Wolverton & Associates have begun preliminary design on project – expect completion by December Construction projected to begin Spring 2015 Proposed property to be accessed by project As of February 20, 2014
15
TSPLOST PROJECTS Band 2 CY 2016 - 2019
16
US 27/CUSTER ROAD INTERCHANGE RECONSTRUCTION/MODIFICATION Projected Costs: $47,670,000 ROW - $28,700,000 PE – GDOT Authorized in 2001 CST - $18,970,000 Project Description: The purpose of the project is to reconstruct the interchange of I-185 and Buena Vista Road Status: Notice To Proceed – Will not be authorized by GDOT until 2016 GDOT has expressed an interest to accelerate this project by authorizing the engineering to begin in 2014 Buena Vista Road Interchange BUENA VISTA ROAD INTERCHANGE As of February 20, 2014
17
Project Description: The project will include road realignments and/or a possible overpass on Buena Vista Road INTERSECTION IMPROVEMENTS ALONG BUENA VISTA ROAD (Spider Web) Projected Costs: $40,000,000 PE – $ 2,522,522 ROW - $ 8,649,648 CST - $ 25,225,225 UTL - $ 3,603,605 Status: Notice To Proceed – Will not be authorized by GDOT until 2016 City has taken the initiative to fund the preliminary concept and design of this project now Public hearing on this has been scheduled for May 12 GDOT has expressed an interest to accelerate this project by authorizing the engineering to begin in 2014 Spider Web Area As of February 20, 2014
18
SR 219 PASSING LANES FROM LUTHER LANDING BRIDGE TO HAPPY HOLLOW ROAD (River Road) Project Description: A passing lane will constructed along SR 219 from Luther Road Bridge to Happy Hollow Road Projected Costs: $17,690,438 PE – $ 1,597,736 ROW - $ 403,427 CST - $ 14,187,438 UTL - $ 1,501,837 Status: Notice To Proceed – Will not be authorized by GDOT until 2016 This project will eventually be the sole responsibility of GDOT As of February 20, 2014
19
TSPLOST PROJECTS Band 3 CY 2020 - 2022
20
Project Description: Project consists of improvements on Cusseta and Old Cusseta Road, from Fort Benning Road to Staunton Drive Projected Costs: $58,289,412 ROW - $ 41,402,448 CST - $ 16,866,964 Status: Notice To Proceed – Will not be authorized by GDOT until 2020 CUSSETA/OLD CUSSETA ROAD IMPROVEMENTS As of February 20, 2014
21
DISCRETIONARY FUNDS YTD Collections = $2,422,548
22
TSPLOST UPDATE April 24, 2014 QUESTIONS?