DR Under FCM – Update Metering Configurations – Summary Registration Timeline and Examples FCM DR Asset Data Conversion Update Lemuel Gonzalez, Manager.

Similar presentations


Presentation on theme: "DR Under FCM – Update Metering Configurations – Summary Registration Timeline and Examples FCM DR Asset Data Conversion Update Lemuel Gonzalez, Manager."— Presentation transcript:

1 DR Under FCM – Update Metering Configurations – Summary Registration Timeline and Examples FCM DR Asset Data Conversion Update Lemuel Gonzalez, Manager Lindsay Perry, Associate Analyst Resource Registration & Performance Auditing DRITWG | January 12, 2010

2 FCM DR Metering Configurations - Summary Asset Registration Timelines FCM DR Asset Data Conversion Update Agenda 2 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

3 FCM DR Metering Configurations 3 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

4 Metering Configurations were discussed in more detail at the January 6, 2010 DRWG meeting. The presentation is available at: –http://www.iso- ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_01-06-2010.ppthttp://www.iso- ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_01-06-2010.ppt Today’s presentation covers the over all object/data model overview and a summary of the metering configurations Metering Configurations DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 4

5 Terms Used In This Presentation CFE –Communication Front End (ISO side, servers that support the communication with Market Participants, or their agents) Customer Baseline (CB) –An estimate of an Asset’s electricity consumption had it not responded to a RTDR or RTEG event. DDE –Demand Designated Entity DG Output (DG) –The metered output of a Distributed Generator less any parasitic loads. Facility –A location where service is provided to an end-use metered customer. Facility Metered Load (FML) –Electricity consumed at a Facility that is purchased from the grid. 5 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

6 Terms Used In This Presentation DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 6 Hourly Reduction (HR) –The reduction in the Asset’s electricity consumption resulting from responding to a RTDR or RTEG event, or in the case of passive assets the average demand reduction across the performance/event hours. Metering Configuration (MC) RTDR / RTEG Asset –One or more measures/facilities located at a single PNode, reporting data as a single set of values and assigned a unique Asset ID by the ISO RTU –Remote Terminal Unit (field devices owned by the Market Participants or DDE that communicate with the CFE system servers) Total Facility Load (TFL) –Total Facility Load is the total electricity consumed at a facility inclusive of that purchased from the grid and that produced on-site from a Distributed Generator. TFL = FML + DG

7 Demand Resources Hierarchy Overview 7 Facilities Jim’s Laundry Mary’s Widgets Fred’s Salvage ABC Supply Measures RTDR Measure 1 RTDR Measure 2 RTDR Measure 3 RTEG Measure 1 RTEG Measure 2 RTEG Measure 3 Assets Asset 1 RTDR Asset 5 RTEG Demand Resources DR A RTDR Asset 4 RTEG Asset 3 RTEG Asset 2 RTDR DR B RTEG DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

8 ISO Uses Reported Data As Follows: Ref No Metering Configuration Applicable DR Types Participant Reports: Hourly Reduction Logic CB Based On: 1 DG Output Directly Metered RTDR, RTEG, OP, SP DG & FML (if pushback possible) HR = DGNo CB 2 Load Reduction - No DG at the Asset RTDRFMLHR = CB - FMLFML 3 DG Used to Reduce Load at the Asset RTEGFMLHR = CB - FMLFML 4 Load Reduction - DG Used to Reduce Load at Another On-Site Asset RTDRDG & FMLHR = CB - TFLTFL 5 DG Used to Reduce Load at the Asset - DG at Another On-Site Asset RTEGDG & FMLHR = CB - TFLTFL 6 Load Reduction Pursuant to M&V Plan OP, SP monthly performance values HR = avg MPV across performance hours No CB Certain RTDR reduction reported as if it were generation HR = DGNo CB Metering Configuration - Summary DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8

9 Asset Registration Timelines 9 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

10 Inform Lead Market Participants and DDEs of the proposed timelines As the timelines will display: –The Lead Market Participants need time to submit the registrations –The ISO needs time to review new registration and changes –The DDE needs time to accommodate changes to the communication model each month to reflect registration changes Purpose for discussing the timelines DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 10

11 Measure State Chart 11 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England ISO

12 Asset State Chart 12 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England All measures under an asset must be approved before an asset can be “Ready to Respond.” Note: Meter Installed & Operational (MIO), and a CB built when needed, need to be satisfied prior to R2R. ISO LP ISO LP ISO LP (MIO)

13 Asset Registration Timeline New Assets: –Must allow the ISO 7 full business days to review submittal, as is the practice today (though in practice our turnaround is quicker) –Must be approved, and have a baseline built when needed, before the data snapshot is taken to construct the communication model Baseline Data –Window for submitting data starts as early as five business days prior to the registration submittal (CB needed by T-8, e.g., 8/24/2010) 8/31/2010 (Tue)8/1/2010 (Sun) 8/10/2010 (Tue): New Asset Submitted to CAMS 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/2010, submittals beyond this date are not guaranteed to be ready for 9/1/2010 8/3/2010 (Tue) – 8/23/2010 (Mon): Window to submit baseline data with a requested operational date of 9/1/2010 13 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

14 Registration Timeline Examples 8/31/2010 (Tue)8/1/2010 (Sun) 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/9/2010 (Mon) – 8/13/2010 (Fri): Current Baseline Data Submitted 8/14/2010 (Sat): New Asset Submitted to CAMS 8/25/2010 (Wed) 0:00 (T-7): Final snapshot of Data Model Taken 8/9/2010 (Mon) – 8/13/2010 (Fri): Historical Baseline Data Submitted Preferred Timeline “Last Minute” Timeline 8/24/2010 (Mon): Asset Approved By ISO 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/2010 14 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8/31/2010 (Tue)8/1/2010 (Sun) 8/9/2010 (Mon): New Asset Submitted to CAMS 8/14/2010 0:00 (Sat): Baseline Built 8/17/2010 (Tue): Asset Approved by ISO 8/15/2010 (Sun): Deadline to Submit New Assets for 9/1/2010 8/15/2010 (Sun): Baseline Built

15 Registration Timeline Examples (cont.) 8/23/2010 (Mon): New Asset Submitted to CAMS Late Timeline In this example, the ISO is given less than two business days to review the asset in order for it to be R2R by 9/1/2010. Asset’s ready to respond date will be postponed until 10/1/2010 since the asset was approved on 8/27/2010. 15 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 8/25/2010 (Wed) 0:00 (T-7): Final Cut of Data Model Taken 8/16/2010 (Mon) – 8/20/2010 (Fri): Historical Baseline Data Submitted 8/27/2010 (Tue): Asset Approved By ISO 8/31/2010 (Tue)8/1/2010 (Sun) 8/16/2010 (Mon): Deadline to Submit New Assets for 9/1/2010 8/24/2010 (Tue): Baseline Built

16 Forward Capacity Market DR Asset Data Conversion Update 16 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

17 Administrative Reminder All forms have been sent. Forms are due back to ISO Customer Support from EPs by January 31, 2010. Follow up questions regarding the form may be directed to ISO Customer Support. ISO Customer Support contact information is as follows: –CustServ@iso-ne.comCustServ@iso-ne.com –413-540-4220 EPs unable to provide required information in a timely manner risk delaying conversion of their LRP assets for the start of the first Capacity Commitment Period on June 1, 2010. DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 17

18 Timeline Reminder (Continued) Dec 9, 2010: Demand Asset data conversion form distributed Current CAMS CAMS under FCM TBD: CAMS under FCM deployed – Current CAMS may be used for registration for Transition Period months June 1, 2010: First FCM Commitment Period begins – current CAMS becomes “read- only” Jan 31, 2010: Demand Asset data conversion form due ABC DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 18

19 19 Timeline (Continued) Before form is returned to the ISO (A) Between form returned and deployment CAMS under FCM (B) Once CAMS under FCM is deployed (C) Make updates to existing LRP assets for FCM Update XLS Form, and CAMS also if it applies to the Transition Period. E-mail ISO Customer Support with the request (HEAT ticket). For extensive revisions, submit request to ISO for an updated XLS. Update CAMS if it also applies to the Transition Period. TP-only Assets: Current CAMS may be used. FCM –only Assets: Use CAMS under FCM. Both: May need to update both systems. Register New Asset (incl. un- retiring) for Transition Period Continue to use Current CAMS, plus fill out the revised Additional Information sheet and email to ISO Customer Support. Note: FCM related fields are only needed for LRP assets you want the ISO to cutover to FCM. Current CAMS may be used for Transition Period only. Register New FCM Assets Continue to use Current CAMS, plus fill out the revised Additional Info. sheet and email ISO CS. Use CAMS under FCM. Where to register new assets and edit asset data DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

20 MW Allowed to Be Pushed Back field on the “Passive Assets” tab of the form is missing. Please put this value in the Notes/Comments field. If an asset’s DR Type is “RTDR” and the Reduction Method is “Start Generation” the form gives you three options for the Metering Configuration field. The ONLY valid option for this combination is “DG Output Directly Metered.” Please disregard the other options. MCs with “DG” in their names still apply to RTEG assets. EGs are Distributed Generation. Corrections and General Comments DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 20

21 Please review the January 6, 2010 presentation if you are interested in more detail regarding commonly asked questions on the asset cutover effort. The presentation is available at: –http://www.iso- ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_01-06-2010.ppthttp://www.iso- ne.com/committees/comm_wkgrps/mrkts_comm/dr_wkgrp/mtrls/ 2010/jan62010/drwg_ms_01-06-2010.ppt For more on commonly asked questions DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England 21

22 22 Questions DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England

23 SundayMondayTuesdayWednesdayThursdayFridaySaturday 1234567 891011121314 15161718192021 22232425262728 293031 August 2010 For reference to use with the registration timelines 23 DR Under FCM – Update | January 12, 2010 DRITWG | © 2010 ISO New England