Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2008 doc.: IEEE /1003r0 May 2010

Similar presentations


Presentation on theme: "September 2008 doc.: IEEE /1003r0 May 2010"— Presentation transcript:

1 September 2008 doc.: IEEE /1003r0 May 2010 802.11aa – Robust Audio Video Transport Streaming Beijing, China Opening Report Date: Authors: Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

2 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Abstract This submission summarizes TGaa goals and agenda for the IEEE Beijing, China (May 2010) Slide 2 Ganesh Venkatesan, Intel Corporation et al Page 2 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

3 Snapshot Goals for the Beijing Meeting:
September 2008 doc.: IEEE /1003r0 May 2010 Snapshot Goals for the Beijing Meeting: Listen to technical proposal(s) Complete Draft 0.05 comment resolution Approve Draft1.0 and kickoff WG letter Ballot Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

4 Opening Report May 2010 November 2007 September 2008
doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Opening Report Slide 4 Ganesh Venkatesan, Intel Corporation et al Page 4 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

5 Attendance Recording - 802.11
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Attendance Recording Sign-in at “newton” is a local server, not reachable via a VPN “newton” is active only during sessions First “sign in” to provide contact information Only name and affiliation may be posted publicly, as per IEEE rules No other personal information will be publicly available Second, log attendance Sign In Slide 5 Ganesh Venkatesan, Intel Corporation et al Page 5 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

6 As a Courtesy To Others …
September 2008 doc.: IEEE /1003r0 May 2010 As a Courtesy To Others … PLEASE switch your Mobile Phones OFF, or to VIBRATE Alert, remember to MUTE your PC also please ! "Our thanks to all those people who now use Headsets !” The use of Audio and / or Video recording of any meeting is Specifically Prohibited as per the WG Policies and Procedures. This is mandated by the IEEE-SASB in the OpManual Still photography is only permitted by a public request and permission of the meeting membership via the WG Chair, and is not for commercial purposes, also mandated by IEEE-SASB in the OpManual Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

7 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 802.11aa – May 2010 Policies and Procedures, Attendance reminder: **IEEE Patent Policy ***Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Policies and Procedures - IEEE 802 Policies and Procedures - ** Read slide deck *** Note especially items #7 & #11 Slide 7 Ganesh Venkatesan, Intel Corporation et al Page 7 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

8 Technical Presentations
September 2008 doc.: IEEE /1003r0 May 2010 Technical Presentations Document number Title Author(s) 1 10/541r1 Extending 11v QoS Traffic Capability Alex Ashley 2 10/457r1 Recommendation for EDCA Overhead Factor Graham Smith 3 10/484r3 Draft0.03 Internal Review Comment Resolutions Ganesh Venkatesan 4 10/137r3 Interworking with 802.1Qat – specific changes 5 10/458r0 MIB Style guide 6 10/606r0 Location for the DEI bit Document number Title Author(s) 1 10/219r3 Solution Choices for Interworking with 802.1Qat Ganesh Venkatesan 2 tbd Draft 0.04 Internal Review Comments TGaa members 3 09/1183r1 Resolution to Draft 0.02 Internal Review Comment #3 Brian Hart 4 10/3{19,20}r0 Improving MRG with DMS 5 10/304r0 Empirical Formulae for EDCA overhead factor Graham Smith 6 Designated MSRP Node handling on Network Philippe Klien Slide 8 Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

9 TGaa Agenda May 2010 September 2008 doc.: IEEE 802.11-08/1003r0
Monday EVE – Grand Ballroom C Administrivia TG Elections Approve Agenda for the week Extending 11v QoS Traffic Capability (10/541r0) MIB Style Guide (10/458r0) Draft0.03 Internal Review Comment Resolutions (10/484r0) Thursday AM1 – Function Room 2AB Administrivia Interworking with 802.1Qat – specific changes (10/137r3) Draft0.03 Internal Review Comment Resolutions (10/484r3) Agenda for Joint meeting with .1AVB in July Timeline discussion Motion-10 and Motion-11 Closing Report Review Open Comments Non-11aa BSSs in OBSS env Adjourn Tuesday AM1 – Grand Ballroom D Administrivia Draft 0.03 Comments Draft 0.04 Comments Draft 0.05 comments Decide on Wed Eve Session Wednesday PM1 – Grand Ballroom D Administrivia Interworking with 802.1Qat – specific changes (10/137r2) EDCA Overhead Factor (10/457r1) Motions Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

10 Wed PM1 Agenda May 2010 Wednesday PM1 – Grand Ballroom D Administrivia
September 2008 doc.: IEEE /1003r0 May 2010 Wed PM1 Agenda Wednesday PM1 – Grand Ballroom D Administrivia Interworking with 802.1Qat – specific changes (10/137r2) EDCA Overhead Factor (10/457r1) Draft 0.04 left over from the last session Motions Discuss open comments Non 11aa BSSs Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

11 Open comments Draft 0.03 Draft 0.04 (closed) CID #11 – sqrt estimation
September 2008 doc.: IEEE /1003r0 May 2010 Open comments Draft 0.03 CID #11 – sqrt estimation CID #40 – potential load advertisement under DLS and when there are multiple links from the STA to the AP CID #21 – how to deal with non 11aa overlapping BSSs Draft 0.04 (closed) CID #22 EDCA Overhead factor. See motion-2 Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

12 Officer Election Moved: Hang Liu Seconded: Alex Ashley Results: 4/0/0
September 2008 doc.: IEEE /1003r0 May 2010 Officer Election Move to reaffirm the following TGaa officer positions: Chair – Ganesh Venkatesan (Intel) Vice Chair – Alex Ashley (NDS) Secretary – Ganesh Venkatesan (Intel) Technical Editor – Hang Liu (Technicolor) Moved: Hang Liu Seconded: Alex Ashley Results: 4/0/0 Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

13 Minutes review Orlando ad hoc meeting minutes (10/454r0)
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Minutes review Orlando ad hoc meeting minutes (10/454r0) Orlando Meeting Minutes (10/422r0) Teleconference Minutes (10/561r0) Slide 13 Ganesh Venkatesan, Intel Corporation et al Page 13 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

14 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Draft 0.05 to Draft 1.0 Discuss Draft 0.03/Draft 0.04 comment resolutions and adopt corresponding normative text Fix editorial and other ‘required’ issues in Draft 0.05 Call the resulting draft as Draft 1.0 Review and approve Draft1.0 to be forwarded to WG LB. Slide 14 Ganesh Venkatesan, Intel Corporation et al Page 14 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

15 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-1 Move to approve document “Style Guide edits to MIB” 10/458r0 for inclusion in the next draft of TGaa. Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/2 Motion Passes Slide 15 Ganesh Venkatesan, Intel Corporation et al Page 15 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

16 Motion-2 Moved: Alex Ashley Seconded: Hang Liu
April 2010 doc.: IEEE /0457r0 April 2010 Motion-2 Move to instruct the TGaa editor to: Rename aa.2.2 ‘EDCA BW Factor’ to ‘EDCA Bandwidth Factor’ and Replace P91L50 and Table aa1: EDCA Bandwidth Factor with the following: “It is recommended that a fixed value of 1.34 is used for EDCA Overhead Factor. The value of the EDCA Overhead Factor is dependent upon many factors, including: Number and mix of streams, voice and video Mixture of PHY Rates and PHYs Mixture of streams’ data rates Use and mix of aggregated MSDUs Based on simulations the value of EDCA Overhead Factor is in the range 1.26 to 1.43.” Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/0 Motion Passes Graham Smith, DSP Group Graham Smith, DSP Group

17 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-3 Move to approve document “Draft 0.03 Comment Resolutions” 10/484r3 for inclusion in the next draft of TGaa. Moved: Alex Ashley Seconded: Hang Liu Result: 3/0/0 Motion Passes Slide 17 Ganesh Venkatesan, Intel Corporation et al Page 17 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

18 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-4 Move to approve document “Extending 11v QoS Traffic Capability” 10/541r1 for inclusion in the next draft of TGaa. Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/0 Motion Passes Slide 18 Ganesh Venkatesan, Intel Corporation et al Page 18 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

19 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-5 Move to approve document “Location for the DEI bit” 10/606r0 for inclusion in the next draft of TGaa. Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/0 Motion Passes Slide 19 Ganesh Venkatesan, Intel Corporation et al Page 19 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

20 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-6 Move to approve document “Interworking with 802.1Qat” 10/137r3 and replace the label “Table 7-48 ADDTS CompleteFrame Body” with “Table 7-48.aa ADDTS Complete Frame Body” for inclusion in the next draft of TGaa. Moved: Hang Liu Seconded: Alex Ashley Result: 2/0/0 Motion Passes Slide 20 Ganesh Venkatesan, Intel Corporation et al Page 20 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

21 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-7 Move to approve TGaa Orlando ad hoc meeting minutes – 10/454r0. Approved unanimously Slide 21 Ganesh Venkatesan, Intel Corporation et al Page 21 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

22 Motion-8 Move to approve TGaa Orlando Meeting minutes – 10/422r0.
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-8 Move to approve TGaa Orlando Meeting minutes – 10/422r0. Approved unanimously Slide 22 Ganesh Venkatesan, Intel Corporation et al Page 22 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

23 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-9 Move to approve Mar-May, 2010 Teleconference minutes (document 10/0561r0). Approved unanimously Slide 23 Ganesh Venkatesan, Intel Corporation et al Page 23 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

24 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-10 Move to adopt the comment resolutions in documents 10/0055r5 and 10/0482r4 and instruct the TGaa editor to incorporate the corresponding edits in the next TGaa draft Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/0 Motion Passes Slide 24 Ganesh Venkatesan, Intel Corporation et al Page 24 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

25 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-11 Approve a 30 day Working Group Technical Letter Ballot asking the question “Should TGaa Draft 1.0 be forwarded to Sponsor Ballot?” Moved: Alex Ashley Seconded: Hang Liu Result: 2/0/0 Motion Passes Slide 25 Ganesh Venkatesan, Intel Corporation et al Page 25 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

26 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Motion-12 Move to approve the following Teleconference schedule for TGaa: June21 Monday Hrs EDT Approved with unanimous consent Slide 26 Ganesh Venkatesan, Intel Corporation et al Page 26 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

27 Joint meeting agenda (with .1AVB)
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Joint meeting agenda (with .1AVB) Status update Overview of changes to interwork with 802.1Qat Slide 27 Ganesh Venkatesan, Intel Corporation et al Page 27 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

28 Timeline Discussion WG LB slipped by 3 months (Mar 10 to June 10)
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 May 2010 Timeline Discussion WG LB slipped by 3 months (Mar 10 to June 10) First Recirculation moves to Sep 10 Completion date moves to Sep 11 (from Jul 11) – assuming RevCom meeting dates line up. Slide 28 Ganesh Venkatesan, Intel Corporation et al Page 28 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems


Download ppt "September 2008 doc.: IEEE /1003r0 May 2010"

Similar presentations


Ads by Google