Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2008 doc.: IEEE /1003r0 Mar 2011

Similar presentations


Presentation on theme: "September 2008 doc.: IEEE /1003r0 Mar 2011"— Presentation transcript:

1 September 2008 doc.: IEEE /1003r0 Mar 2011 802.11aa – Robust Audio Video Transport Streaming Singapore Opening Report Date: Authors: Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

2 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Abstract This submission summarizes TGaa goals and agenda for the IEEE Singapore meeting (Mar 2011) Slide 2 Ganesh Venkatesan, Intel Corporation et al Page 2 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

3 September 2008 doc.: IEEE /1003r0 Mar 2011 Snapshot Goals: Resolve 2nd recirculation LB comments and approve corresponding resolutions Start recirculation letter ballot on Draft 4.0 Joint Meeting with 802.1AVB (Thursday AM1) Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

4 Opening Report Mar 2011 November 2007 September 2008
doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Opening Report Slide 4 Ganesh Venkatesan, Intel Corporation et al Page 4 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

5 Attendance Recording - 802.11
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Attendance Recording Sign-in at “newton” is a local server, not reachable via a VPN “newton” is active only during sessions First “sign in” to provide contact information Only name and affiliation may be posted publicly, as per IEEE rules No other personal information will be publicly available Second, log attendance Sign In Slide 5 Ganesh Venkatesan, Intel Corporation et al Page 5 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

6 As a Courtesy To Others …
September 2008 doc.: IEEE /1003r0 Mar 2011 As a Courtesy To Others … PLEASE switch your Mobile Phones OFF, or to VIBRATE Alert, remember to MUTE your PC also please ! "Our thanks to all those people who now use Headsets !” The use of Audio and / or Video recording of any meeting is Specifically Prohibited as per the WG Policies and Procedures. This is mandated by the IEEE-SASB in the OpManual Still photography is only permitted by a public request and permission of the meeting membership via the WG Chair, and is not for commercial purposes, also mandated by IEEE-SASB in the OpManual Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

7 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 802.11aa – March 2011 Policies and Procedures, Attendance reminder: **IEEE Patent Policy ***Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Policies and Procedures - IEEE 802 Policies and Procedures - ** Read slide deck *** Note especially items #7 & #11 Slide 7 Ganesh Venkatesan, Intel Corporation et al Page 7 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

8 Technical Presentations
September 2008 doc.: IEEE /1003r0 Mar 2011 Technical Presentations Document number Title Author(s) Slide 8 Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

9 TGaa Agenda Mar 2011 Monday PM1 – Wednesday PM1 –
September 2008 doc.: IEEE /1003r0 Mar 2011 TGaa Agenda Monday PM1 – Administrivia Agenda for the week (plan and review) Sponsor Pool formation discussion Overview of Comment Spreadsheet Review joint meeting topics Motions to approve non-contentious comment resolutions Comment Resolution Wednesday PM1 – Administrivia Comment Resolution Motions Thursday AM1 – Joint Meeting with AVB Administrivia QoS Maintenance Reports 802.11aa Group Addressed Transmission Service MaxRes in STA-Bridge Issue - brainstorming Tuesday PM1 – Administrivia Comment Resolution Tuesday PM2 – Administrivia Comment Resolution Thursday AM2 – Administrivia Comment Resolution wrap up and motions Plan for May 2011 meeting Teleconference Schedule Motions Review Closing Report Adjourn Tuesday Eve – Administrivia Comment Resolution Ganesh Venkatesan, Intel Corporation et al Alex Ashley, NDS Ltd

10 Joint meeting with 802.1AVB in March 2011
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Joint meeting with 802.1AVB in March 2011 How to deal with STA-Bridge issue? Specific details on k/v traffic stream statistic reports Overview of aa MRG (now known as GCR) MaxRes for Slide 10 Ganesh Venkatesan, Intel Corporation et al Page 10 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

11 Motion-1 Move to approve the following teleconference schedule:
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Motion-1 Move to approve the following teleconference schedule: Weekly Monday Hrs ET Mar 28, Apr 04, 11, 18, 25, May 02, 2011 Slide 11 Ganesh Venkatesan, Intel Corporation et al Page 11 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

12 Minutes review Los Angeles Meeting minutes (11/0137r0)
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Minutes review Los Angeles Meeting minutes (11/0137r0) Teleconference Minutes (11/0xxxr0) Slide 12 Ganesh Venkatesan, Intel Corporation et al Page 12 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

13 Motion-2 Move to approve TGaa Los Angeles Meeting minutes – 11/0137r0.
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Motion-2 Move to approve TGaa Los Angeles Meeting minutes – 11/0137r0. Slide 13 Ganesh Venkatesan, Intel Corporation et al Page 13 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

14 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Motion-3 Move to approve Feb-Mar 2011 Teleconference minutes (document 11/0xxxr0). Slide 14 Ganesh Venkatesan, Intel Corporation et al Page 14 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

15 September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Motion- Move to decline all comments listed in document 11/0xxxr0 that have a blank resolution status with the resolution of “The TG requires another recirculation ballot to gain feedback from the WG on this topic.” Slide 15 Ganesh Venkatesan, Intel Corporation et al Page 15 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

16 May 2011 meeting room request
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 May 2011 meeting room request Draft 4.0 Recirculation Comment Resolution Request 7 sessions at least one that does not conflict with TGac, one with FIA, one with SmartGrid and one with TGae Slide 16 Ganesh Venkatesan, Intel Corporation et al Page 16 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

17 Current Timeline First Recirculation -- Sep 10, 2010
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 Mar 2011 Current Timeline First Recirculation -- Sep 10, 2010 Plan for 3-4 recirculations Form Sponsor pool – Mar 2011 MEC Done – Aug 2011 Start Sponsor Ballot – Sep 2011 First Sponsor Recirc – Nov 2011 Sponsor Ballot done (final WG approval) – Mar 2012 Final or conditional 802 EC approval – Mar 2012 RevCom/SA approval -- June 2012 (need to line up with appropriate RevCom/SA meeting dates) Slide 17 Ganesh Venkatesan, Intel Corporation et al Page 17 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems


Download ppt "September 2008 doc.: IEEE /1003r0 Mar 2011"

Similar presentations


Ads by Google