Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com

Similar presentations


Presentation on theme: "doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com"— Presentation transcript:

1 doc.: IEEE 802.21-02/xxxr0 Subir Das sdas at appcomsci dot com
Month 20xx doc.: IEEE /xxxr0 Joint Opening Plenary IEEE Media Independent Handover Services Session #75, July 2016 San Diego, CA, USA Subir Das sdas at appcomsci dot com Subir Das, Chair WG XXXX, His Company

2 Session Time and Location
Month 20xx doc.: IEEE /xxxr0 Session Time and Location Monday (July 25, 2016) Tuesday (July 26, 2016) Wednesday (July 27, 2016) Thursday (July 28, 2016) AM-1 8:00-10:00a IEEE 802 EC Opening Plenary m TG N/A N/A Joint m TG/ TG AM-2 10:30-12:30 802.21m TG TG Closing Plenary PM-1 1:30 – 3:30p WG Opening Plenary PM-2 4:00 – 6:00p Discussion on 5G ECSG Future topic Discussion EVE 6:00-10:30p 5G EC Standing Committee(19:30-21:30) 5G EC Standing Committee(19:30-21:30) Social (7:00-9:30p) Default Location: Mission Beach A; 5G ECSC: Seaport G; Social: Grand Hyatt Pool Terrace The WG has 22 voting members and no aspirant member as of this meeting Subir Das, Chair WG XXXX, His Company

3 WG Objective IEEE is developing standards to enable handover services and interoperability between heterogeneous networks including both 802 and non-802 networks Subir Das, Chair WG

4 Work Status Task Group Status 802.21m Revision Project
Month 20xx doc.: IEEE /xxxr0 Work Status Task Group Status 802.21m Revision Project Passed WG Letter Ballot Use cases and Services Subir Das, Chair WG XXXX, His Company

5 Objectives for the July Meeting
Month 20xx doc.: IEEE /xxxr0 Objectives for the July Meeting Task Group Activities 802.21m Revision Project Address MEC review comments and prepare for Sponsor Ballot Use cases and Services Subir Das, Chair WG XXXX, His Company

6 IEEE 802.21 Meeting Server Details
Month 20xx doc.: IEEE /xxxr0 IEEE Meeting Server Details Slide 6 Subir Das, Chair WG XXXX, His Company

7 Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2016 Interim: September, 2016 , Marriot, Europe (Warsaw) Co-located with all 802 wireless groups Plenary: 6-11 Nov 2016, Grand Hyatt, San Antonio, TX, USA Co-located with all 802 groups Subir Das, Chair WG XXXX, His Company

8 Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2017 January 15-20, 2017, Hyatt Regency, Atlanta, GA, USA Co-located with Wireless groups Plenary: March 12-17, 2017, Hyatt Regency Vancouver Co-located with all 802 groups Interim: May 13-18, 2017, Daejeon Convention Center, Daejeon, Korea (TBC)  Co-located with all wireless groups Plenary: July 9-14, 2017, Estrel Hotel and Convention Center, Berlin, Germany Interim: September 10-15, 2017, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session. Co-located with all 802 wireless groups Plenary: November 5-10, 2017, Caribe Hotel and Convention Center, Orlando, FL, USA Subir Das, Chair WG XXXX, His Company


Download ppt "doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com"

Similar presentations


Ads by Google