Presentation is loading. Please wait.

Presentation is loading. Please wait.

WORKING GROUP I (WG-I) AEEC IPS Update

Similar presentations


Presentation on theme: "WORKING GROUP I (WG-I) AEEC IPS Update"— Presentation transcript:

1 WORKING GROUP I (WG-I) AEEC IPS Update
10 Dec 15 CP –WGI – 19/IP-xx 20-22 January 2016 International Civil Aviation Organization INFORMATION PAPER COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 Agenda Item 8: Any Other Business AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone) Presented by Greg Saccone SUMMARY This information paper gives an update of the current plans in AEEC to progress the IPS for Aeronautical Safety Services standards ACTION The working group is invited to note the information presented.

2 AEEC IPS for Aeronautical Safety Services Update
10 Dec 15 AEEC IPS for Aeronautical Safety Services Update ARINC Project Initiation/Modification (APIM) to further define and specify IPS was submitted to AEEC Systems Architecture and Interfaces (SAI) Subcommittee, Feb 2015 APIM was voted on at mid-term session in Sep 2015 and approved, with an understanding that there would be two steps: Step 1: Develop a roadmap document and development plan, scheduled completion Apr 2017 Step 2: Execute the development plan and produce ARINC Project Paper 8XX, Internet Protocol Suite (IPS) for Aeronautical Safety Services, anticipated completion Apr 2019 Kick-off webex held on 10 Dec 2015 (presentation follows) First face-face meeting scheduled at RTCA in Washington DC for Feb 2016

3 Internet Protocol Suite (IPS) for Aeronautical Safety Services
10 Dec 15 Internet Protocol Suite (IPS) for Aeronautical Safety Services Kick off Webex - Step 1

4 Planning of the activities Way of working
10 Dec 15 AGENDA Introduction Objectives Planning of the activities Way of working

5 INTRODUCTION – APIM 15-004 adopted
10 Dec 15 INTRODUCTION – APIM adopted Following APIM adoption in September 2015 (AEEC Mid-Term Session) a new group has been created: Internet Protocol Suite (IPS) for Aeronautical Safety Services subcommittee Co-Chairman: Greg Saccone, The Boeing Company Co-Chairman: Luc Emberger, Airbus Goal: Develop an industry roadmap and a development plan for defining IPS for Aeronautical Safety Services, including airborne, ground-based and space-based communication systems, coordinating with aviation Standards Development Organizations (SDOs), Air Navigation Service Providers (ANSPs) and others with an interest. Scope: New network infrastructure for safety services (both air traffic services (ATS) and aeronautical operational communications (AOC)) Non “safety” AOCs and Cabin IP Com are out of the scope of the WG

6 INTRODUCTION – A 2 step Approach, Focus on step 1
10 Dec 15 INTRODUCTION – A 2 step Approach, Focus on step 1 It is proposed that the IPS Subcommittee prepare a detailed technical definition of IPS for aeronautical safety services in a new ARINC Standard, in a 2 steps approach: Step 1: (from now to April 2017) Roadmap for standardization and main architecture impacts of IPS introduction Step 2: (April 2017 to April 2019) Development of an ARINC Standard for IPS Step 1 The subcommittee will define the perimeter which needs to be standardized for IPS (air-to-ground and end-to-end) and in which timeframe each part shall be standardized by the appropriate standardization body (ICAO, RTCA, EUROCAE, ARINC). The output of the new subcommittee for Step 1 will be an ARINC Report

7 INTRODUCTION - participation
10 Dec 15 INTRODUCTION - participation Commitment for Drafting and Meeting Participation Airlines: TBC Airframe Manufacturers: Boeing, Airbus Suppliers: Airtel ATN, GE Aviation, Honeywell, Rockwell Collins, Thales Others: ARINC (RC-IMS), FAA, SITA, Inmarsat, Panasonic

8 10 Dec 15 OBJECTIVES The main outcome of the final report shall be a detailed roadmap highlighting: What shall be standardized (equipment? Interfaces? Protocols? Performances? Profiles?) Which body shall support the standardization (AEEC, ICAO, RTCA, EUROCAE?) When the standardization shall be achieved? How the standards will be validated? In order to build a valid roadmap, endorsed by all stakeholders, a set of topics will need to be detailed in the report:

9 OBJECTIVES – Key topics (1/3)
10 Dec 15 OBJECTIVES – Key topics (1/3) Clarify and detail the scope to be addressed by ATN/IPS : Definition of long-term needs for IPS for aeronautical safety services What will be the “users” of IPS (ATC, AOC)? Which functional, performance and safety and data security requirements apply? Which communication means? Definition of mid-term opportunities Which applications and communication means Identify the deployment roadmaps and their impacts on the solution: Deployment roadmaps (Europe and US) including transition phase during which ACARS, ATN/OSI, and IPS will co-exist How aircraft equipped with ACARS, ATN/OSI and aircraft with IPS will be accommodated?

10 OBJECTIVES – Key topics (2/3)
10 Dec 15 OBJECTIVES – Key topics (2/3) Describe Aircraft architecture : ATN/IPS integration in different types of airborne avionics (429 based, AFDX based, others) Interfaces with the applications, with the radios, with the other systems Impact of data security requirements Multi-link considerations, how many stacks? Possible co-existence with ACARS and ATN/OSI datalinks ? Retrofit versus forward fit considerations Design Assurance level Security Assurance level

11 OBJECTIVES – Key topics (3/3)
10 Dec 15 OBJECTIVES – Key topics (3/3) Describe network end to end architecture: Mandatory requirements for interoperability (are RFCs sufficient?) Mobility, addressing requirements For AOC traffic For ATS traffic Security management – PKI considerations Describe ground components: Ground gateways End systems Impact on existing ACARS and ATN/OSI ground-based infrastructure? Standardization roadmap : What ? Who ? When?

12 PLANNING OF THE ACTIVITIES (Step 1)
10 Dec 15 PLANNING OF THE ACTIVITIES (Step 1) 2016 2017 D J F M A S O N Periodic telco/webex as needed Meeting 1 Meeting 2 Meeting 3 Meeting 4 Step 1 Report KOM (Webex) Open discussions White-papers review Agreement on the report TOC and assign chapters authoring Discuss first draft Final report ready for submission New white-papers and First contributions review Consolidate mature version Activity Mtgs Mtg-Days (Total) Expected Start Date Expected Completion Date Step 1: ARINC Report Standardization Roadmap for IPS 5 10 Sept 2015 April 2017

13 PROPOSED WAY OF WORKING
10 Dec 15 PROPOSED WAY OF WORKING Now: Call for contributions / white-papers, first thoughts focused on the key topics identified earlier as inputs for the first F2F meeting early 2016 (Date TBD) Identify any other technical areas that need to be defined (i.e. ones that are not mentioned in APIM) Establish boundaries between various bodies/committees Next year: First draft report expected by Q4 2016 Need to schedule synchronisation milestones with other bodies and initiatives ICAO EUROCAE/RTCA FAA/Europe ANSPs (NextGen /SESAR) ATN/IPS related projects: Validation initiatives, IRIS… Coordination as needed with other AEEC groups (SAI, DLK , DLK User Forum, NIS, AGCS, AeroMACS WG)

14 10 Dec 15 Questions Thank you! Question?

15 10 Dec 15 Backup slides

16 Datalink Roadmap 2015 2020 2025 2030 2035 FANS Comm means
FAA DCL En-route B2A Europe B1 B2 B2A or B3 VHF Data/VDLM2 Comm means ? HF, Satcom Data 2 ? 2016 AeroMACS 2030 ? LDACS 2017 Iridium NEXT 2016 2028 Inmarsat SBB/IRIS Precursor Iris Airborne ATS Router ACARS ? ATN/OSI (Europe) ? ATN/IPS 2019 – Standards Available 2024 IOC (Boeing view) IOC (Airbus view)

17 Considerations regarding implementation of ATN/IPS on Aircraft
10 Dec 15 Considerations regarding implementation of ATN/IPS on Aircraft VHF system HF ACARS + ATN/OSI Router FANS ATC Applications AOC Applications in ACD SATCOM Aircraft Control Domain (ACD) (without ATN/IPS) VHF system ACARS + ATN/OSI Router FANS ATC Applications AOC Applications in ACD Aircraft Control Domain (ACD) with ATN/IPS ATN/IPS LDACS Aeromacs Security function? ? Other impacted systems FWS, CMS, DLCS RMP, .. HF SATCOM ? ? ?

18 Envisaged Boeing IPS Architecture – Work to be Done
EFB Display CMC/ ACMF Cabin Systems FMS AOC/ATC Unaffected Components Future Comm Components Changed/New Components Changed/New Components CMF Comm Management Media Routing Logic AOC Router Logic, Media management (High Level) Dialog Service Interfaces Red Text/Lines: areas to be defined ACARS Over IP ACARS/IP Profile ACARS Network Network Profiles/ Specification, mobility ATN Network IP Network Network interfaces (coordinated with relevant groups) Air HF SDU VDR SBB/Iridium Certus/Other AeroMACS LDACS Ground Ground Gateway Comm Service Provider ANSPs, AOCs

19 ANNEX ICAO Global Air Navigation Plan V4 ATN/IPS
10 Dec 15 ANNEX ICAO Global Air Navigation Plan V4 ATN/IPS LDACS, AeroMACS and Future Satellite Full 4D


Download ppt "WORKING GROUP I (WG-I) AEEC IPS Update"

Similar presentations


Ads by Google