Presentation is loading. Please wait.

Presentation is loading. Please wait.

Updates Required for the 802.16m Work Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:

Similar presentations


Presentation on theme: "Updates Required for the 802.16m Work Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:"— Presentation transcript:

1 Updates Required for the 802.16m Work Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted: 2009-03-09 Source: Jose PuthenkulamVoice:+1-5032646121 Intel CorporationE-mail:jose.p.puthenkulam@intel.com Venue: Vancouver, BC, Canada Base Contribution: IEEE 802.16m Work Plan document (IEEE 802.16m-07/001r2) Purpose: For discussion and adoption of specific updates to the IEEE 802.16m work plan Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7.html#6http://standards.ieee.org/guides/opman/sect6.html#6.3 Further information is located at and.http://standards.ieee.org/board/pat/pat-material.htmlhttp://standards.ieee.org/board/pat

2 23/9/2009 Outline Current Work Plan Review (IEEE 802.16m- 07/001r2) Motivation for updates Proposed updates for discussion Recommendations

3 33/9/2009 IEEE 802.16m-07/001r2 2008-07-17 Call for SDD details issued in Jul ’08 Proposed Updates to TGm Timelines Sep ’07* Jan’08* Nov 08* Initial P. Working Doc Mar ’09 Letter Ballot Sponsor Ballot Sep ’09Nov ’08 Nov ’07 Jan ’09 IEEE 802.16m 802.16m Amendment Ŧ IMT Advanced Proposal System Description System Requirements Evaluation Methodology ITU-R IMT Advanced IMT.TECH IMT.EVAL IMT.RADIO Jun ’08 Oct ’08 Proposal Submission Jan’09 First Call for Proposals for SDD issued in Sept ‘07 Circular Letter Jun ’08 Proposal Evaluation & Consensus Building Develop Recommendation Q2Q3Q4Q1Q2Q3Q4 2007 2008 2009 Q1Q2Q3Q4 Apr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov Dec Q1Q2Q3Q4 2010 Oct ’09 Jun ’10 Final Proposal Sept ’09* *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). Ŧ 802.16m amendment is dependent on the 802.16Rev2 Project completion ITU based Updates Refinements AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec IEEE 802.16 ITU-R WP5D Mar ’10 ITU based Updates Finalized 3 Current Work Plan (IEEE 802.16m-07/001r2) Review

4 43/9/2009 Motivation for updates From an industry standpoint, we need a complete standard in mid 2010. Our 802.16m System Requirements Document (SRD) have a lot of features and we cannot complete all of them in the time line we originally planned. We also need a 802.16m draft standard as a stable reference for basing the IMT-Advanced Proposal Core PHY, MAC features for IMT-advanced simulations need to be complete by May session –First set of system simulations need to be run for link budget and performance compliance by the July session. –In July we need to review the results and make any feature updates necessary –We need to run final simulations by Sept session So we need to discuss this week how to update the work plan. –Basic idea is to figure out what high level features beyond the IMT-Advanced features in the SRD that can be considered for staging. –How to achieve staging of the work from a process standpoint –Prepare updates to the work plan to achieve the staging we desire

5 53/9/2009 2008-07-17 Proposed Updates to TGm Timelines for discussion Sep ’07* Jan’08* Jan 09* Working Doc May ’09 Letter BallotSponsor Ballot Nov ’09Nov ’08 Nov ’07 Jan ’09 IEEE 802.16m 802.16m Amendment Ŧ IMT Advanced Proposal System Description System Requirements Evaluation Methodology ITU-R IMT Advanced IMT.TECH IMT.EVAL IMT.RADIO Jun ’08 Oct ’08 Proposal Submission Jan’09 Circular Letter Jun ’08 Proposal Evaluation & Consensus BuildingDevelop Recommendation Q2Q3Q4Q1Q2Q3Q4 2007 2008 2009 Q1Q2Q3Q4 Apr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov Dec Q1Q2Q3Q4 2010 Oct ’09 Jun ’10 Final Proposal Sept ’09* *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). Ŧ 802.16m amendment is dependent on the 802.16Rev2 Project completion ITU based Updates Refinements AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec IEEE 802.16 ITU-R WP5D May ’10 ITU based Updates 3

6 63/9/2009 Recommendations for this week Have more discussions this week to finalize and update the work plan Review and approve updates to the work plan at the TGm closing plenary

7 73/9/2009 Backup

8 83/9/2009 IMT-Advanced Schedule Source: ITU-R WP5D


Download ppt "Updates Required for the 802.16m Work Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:"

Similar presentations


Ads by Google