1 2011-07-18E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration

2 2011-07-18E. Hazen2 AMC13 Progress ● First 2 assembled boards due tomorrow ● Will test through remainder of August, finish production in early Sept. – Still some parts problems to complete the final 10 (parts were in stock, but disappeared while awaiting $$$) ● Test firmware (initially to support HCAL tests) underway ● Documentation at http://www.hcal.info/AMC13 T1 T2 T3

3 2011-07-18E. Hazen3 Other Items ● TTCrx-FPGA spinoff project is official: https://espace.cern.ch/forum-TTCrx-in-FPGA/default.aspx https://espace.cern.ch/forum-TTCrx-in-FPGA/default.aspx ● A reference design by Wu is posted there ● DAQ link using two SFP+ outputs from AMC13 to Xilinx SP605 PCIe eval board under development ● Simple protocol designed to handle 10 -10 BER with negligible performance developed ● Tested extensively with simulated errors ● Will present to CMS DAQ group as an example

4 2011-07-18E. Hazen4 DAQ Interface Upgrade ● We're inventing a simple fiber-based protocol for DAQ for AMC13 hardware testing (and possible HCAL TB use). This protocol will use two fibers per AMC13 (two HCAL FEDs). ● Initial testing starting soon (this week?) using HCAL DTC board and Xilinx SP605 PCIe eval board ● This board will be mounted in a PC with at least some software support (by us) for PCIe readout of DAQ data ● We will happily participate in meeting with the DAQ group to discuss a longer-term solution.

5 2011-07-18E. Hazen5 Backup / Review Slides

6 2011-07-18E. Hazen6 Spartan 6 Virtex 6 GT X SFP GT X SFP GT X SFP GT X IO SFP? CD S 128 Mbyte DDR3 GT P Flash IO TTC DAQ 6Gb/s Spar e MMC uC IPMI GbE JTAG LED s MCH1 Front Panel via T3 Fabric A 12 ports £ 3.125 GB/s Fabric B 80 MB/s CLK F/O 40.xx CLK To AMCs CMS AMC13 Module Block Diagram Optional RAM DAQ 6Gb/s 2:1 Switc h

7 2011-07-18E. Hazen7 AMC13 Board Stack T1 T2 T3 T4 New custom T1 base board MMC functions (as AMC-13) TTC optical rx 3 or 4x SFP Cross-over GbE from MCH1 for controls and local DAQ Clocks board Clock / controls fanout T3 board Provides JTAG / LEDs on front panel Crosspoint switch for trigger applications (could be omitted if some other solution is found for front panel) ● Base configuration has only tongues 1, 2 ● Base board - With optics and HS links (Fabric A) ● Clocks board - distributes LHC clock and controls ● Mezzanine connector for T3 with I2C ● T3 has JTAG and LEDs Connector to T3 provides: Power Serial bus (SPI or I2C) from MMC Front-panel signals: JTAG or SPI for miniUSB Status LEDs Quad SFP+ Cage