Presentation is loading. Please wait.

Presentation is loading. Please wait.

PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model.

Similar presentations


Presentation on theme: "PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model."— Presentation transcript:

1 PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model Name 190LFF (ALL VID +KEL MODEL) Manufacturing2016 Production Problem Location MUMBAI(4),KOLKATA(1), BANGLORE (6) INDORE(1),SURAT(1) Problem Reported fromCustomer Location Defect Qty (nos.) Total 13 Qty reported All Across India,where product replacement is done ProblemExcess ice formation in freezer section Analysis & Action Problem reported : Excess ice formation in freezer section Earlier Model 190L FF was Dropped due to the capillary chocking, Earlier glass heater was used, now heater location got changed. Hence after feedback from field, Secondary Heated will be used in future production. Countermeasure : Temp.Counter Measure is given where the heater needs to be installed at the freezer section. Excess ice Formation in cooling Coil Additional heater needs to be used for problem solution

2 STEP 1 Countermeasure :Methodology for fixing Al. Foil Heater in 202 (190L FF) Models. 1.11.2 1.1. Remove screw of the front panel and take out the front panel assembly. 1.2. Disconnect the fan motor wire assembly and keep aside. STEP 2 2.12.2 2.32.4 2.1. Just lift up the capillary and suction tube joint carefully. 2.2. Lift up evaporator from RHS side slightly upper side. 2.3. Lift up evaporator from LHS side slightly upper side. 2.4. Remove the evaporator outside to insert the Al. Heater inside the drain pan.

3 Methodology for fixing Al. Foil Heater in 202 (190L FF) Models. STEP 3 3.1. Remove the peel off paper from the adhesion tape of Al. Heater. 3.2. Bend the Al. Heater in 90° angle. 3.3. Insert and paste the Al. Heater inside at drain pan. 3.4. Check the heater hole matching and paste Al. Tape at the top side. 3.3 3.13.2 3.4 STEP 4 4.1. Press and refit the evaporator back to original position. 4.2. Align the evaporator from RHS side and check no gap to liner. 4.3. Align the evaporator from LHS side and fit properly. 4.4. Press the capillary and suction tube back to original position and check no gap. 4.3 4.14.2 4.4 Al. Foil Heater Al. Tape Al. Foil Heater Additional Part : 110009712 1 SUB THERMO,190 FF,WIRE HARNESS,SERVICE 1100127986 ALUMINIUM FOIL HEATER,235L FF,R600A

4 Methodology for fixing Al. Foil Heater in 202 (190L FF) Models. STEP 5 5.1. Take the sub wire assembly and connect all the connection as per the shown in picture 5.1. 5.2. All connections to be kept on accumulator to avoid HV fail due to wire cut touching to evaporator. Note: Check all the electrical connections for ensure no continuity 5.2 STEP 6 6.1. Reconnect the fan motor connection as per picture 6.1. 6.2. Re fix the Front Panel properly and check if any fan sound. 6.16.2 END Al. Foil Heater Eva Heater 1 Eva Heater 2 Fuse Conn Wire Harness 5.1 Sub Wire Assembly


Download ppt "PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model."

Similar presentations


Ads by Google