Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of the design integration strategy and installation design January 2016 on.

Similar presentations


Presentation on theme: "Status of the design integration strategy and installation design January 2016 on."— Presentation transcript:

1 Status of the design integration strategy and installation design www.europeanspallationsource.se January 2016 nick.gazis@esss.se nick.gazis@esss.se on behalf of DIG

2 Reporting in JIRA: CAD drawings 2 Preferably at least one CAD-able user from each IKC can have access and visit our reporting pages: https://ess-ics.atlassian.net/wiki/display/DIG/Design+Integration+workGroup https://ess-ics.atlassian.net/wiki/display/DIG/Design+Integration+workGroup DIG-DR ( https://ess-ics.atlassian.net/wiki/display/DIG/DIG-DR ) now becomes obsolete and substituted by https://ess-ics.atlassian.net/wiki/display/DIG/DIG-DR Frequently Used ESS #’s https://ess-ics.atlassian.net/wiki/display/DIG/Frequently+Used+ESS+%23%27s https://ess-ics.atlassian.net/wiki/display/DIG/Frequently+Used+ESS+%23%27s 2D-drawings in progress -Warm linac interface drawings: defined -Cold linac interface drawings: in progress -Installation maps: next step

3 Reporting in JIRA: CAD Inventory 3 The inventory of the CAD model for the accelerator is now summarized under a link: https://ess-ics.atlassian.net/wiki/display/DIG/Inventory+of+integration+models+and+drawings+for+the+ACCSYS+components Inventory is reported per tunnel section with one of the following statuses: Current goal is to reach for all tunnel sections the level of: Each tunnel section contains sub-systems: Your feedback on the inventory status is needed

4 Integration strategy 4 “Strategy for the engineering integration of the ESS accelerator“ https://ess-ics.atlassian.net/wiki/download/attachments/33161992/4667- 49_final.pdf?version=2&modificationDate=1453739145793&api=v2 “IKC 3D model guidelines” - ESS-0023754 https://chess.esss.lu.se/enovia/tvc-action/showObject/dmg_Information/ESS- 0023754/valid  References for warm linac interface drawings included

5 Strategy for the engineering integration of the ESS accelerator 5 2. LinacLego 3. CHESS 1. DOORS Atlassian tool suite 4. CATIA 5. JIRA 6. Wiki

6 Strategy for the engineering integration of the ESS accelerator 6 2. LinacLego 3. CHESS 1. DOORS Atlassian tool suite 4. CATIA 5. JIRA 6. Wiki

7 Strategy for the engineering integration of the ESS accelerator 7 LEBTISRC RFQDTLSPKMBL etc… SPK-01 … SPK-02SPK-03SPK-13 SPK-02-LWUSPK-02-CM SECTION CELL SLOT BEAMLINE ELEMENTS SPK-02-LWU-QH01, SPK-02-LWU-QH02, … Level of exchange for the CAD files between IKC-ESS

8 [cell] SPK-1 [slot] SPK-CM-1 [End Point] SPK-LWU-1 Beam line [slot] SPK-LWU-2 SPK-CM-1 SPK-LWU-2 Beam line Strategy for the engineering integration of the ESS accelerator

9 Export CAD model structure - 3D model export structure: Product (assembly) at the top level Skeleton part IKC delivery unit A dedicated axis system is needed on all above mentioned insertion points CAD Integration reference points Geometrical points Mechanical points IN, OUT, MID of the slot on the beam plane Installation points e.g. support interface points Operation points centerpoints of interfaces e.g. flanges Optical points START, EXIT, MID of the lattice/optics reqs based on LinacLego (on the beam plane) Reference points Fiducial and alignment points IKC 3D model guidelines - ESS-0023754 9

10 ESS 10


Download ppt "Status of the design integration strategy and installation design January 2016 on."

Similar presentations


Ads by Google