Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.

Similar presentations


Presentation on theme: "1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection."— Presentation transcript:

1 1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection

2 Teleconference Information Toll-Free Number: 877-601-3542 Participant Passcode: 40148 Meeting will be recorded and posted on RPS Calculator page: http://www.cpuc.ca.gov/PUC/energy/Renewables/hot/RPS+Calculator+Home.htm http://www.cpuc.ca.gov/PUC/energy/Renewables/hot/RPS+Calculator+Home.htm

3 Agenda for Teleconference ItemPresenter Time (min) 1. Introduction and Purpose of CallEnergy Division5 2. Review of the RPS Calculator Version 6.1E3 & B&V*25 3. Overview of Recent Ruling and Staff Paper A. Summary of Staff Paper B. Summary of Information Requested from Parties Energy Division25 4. Timeline of RPS Calculator ActivitiesEnergy Division5 5. Q & AParticipants60 *Presentation will reference “Release Notes” posted to RPS Calculator home page: http://www.cpuc.ca.gov/NR/rdonlyres/CA26FDFE-2CE0-462D-A21F- 1A301DF962DE/0/CPUC_RPSCalc_ReleaseNotes_v61_7292015.pptx

4 Update Schedule from Oct 10 2014 Staff Paper Addressed in teleconference on 6/29/2015 Results expected December 2015 Addressed in 8/28/15 Ruling and Staff Paper Workshop to follow in Oct/Nov identify portfolio selection process land use information

5 Overview of Land Use and Portfolio Selection Ruling and Staff Paper Addresses two unresolved issues in Tracks 2a and 2b raised in October 10 2014 ruling and staff paper – Land Use Information – Portfolio Selection/Process Alignment Presents options for resolving both topics Solicits feedback from parties for two types of solutions: – Interim (2015) – Permanent (2016 and ongoing)

6 Options for Representing Land Use Information in RPS Calculator Screening: remove land and associated generic renewable resource potential from supply curve used by RPS Calculator to fill future net short Scoring: assign different risk or mitigation costs to different areas of land to influence economic selection by RPS Calculator Prior versions of RPS Calculator (and RETI) have used both options, in different ways at different times Due to time and resource constraints, Energy Division is only considering screening for developing portfolios for upcoming 2016 LTPP and 2016-2017 TPP cycle – Proposals for scoring methodologies may be submitted, but will be discussed at a future workshop in 2016 – Multiple alternative screens may be considered in portfolio selection process

7 Summary of Land Use Data Requested from Parties Interim (1A): For use in 2015 for 2016 LTPP and 2016/17 TPP – Geographic datasets that meet definitions of RETI Category 1 and/or RETI Category 2 Unique, significant, plausible – Answers to questions in staff paper – Will be discussed at public workshop in Oct/Nov 2015 Permanent (1B): For ongoing annual use in future planning cycles – Geographic datasets (do not need to be limited to RETI category definitions) – Answers to questions in staff paper – Will be discussed at public workshop in Q1 2016

8 Options for RPS Portfolio Selection Criteria for Choosing Portfolios Criteria for Adjusting Portfolios (“post-processing”) Alignment with LTPP and TPP – Inputs and Assumptions – Timing

9 Summary of Portfolio Selection Information Requested from Parties Interim (2A): For use in 2015 for 2016 LTPP and 2016/17 TPP – Answers to questions in staff paper – Will be discussed at public workshop in Oct/Nov 2015 Permanent (2B): For ongoing annual use in future planning cycles – Answers to questions in staff paper – Will be discussed at public workshop in Q1 2016

10 Draft RPS Calculator Schedule (updated from schedule discussed on 6/29/15 teleconference) DateActivity June 2015Energy Only/Special Study Webinar July 2015RPS Calc 6.1 released August 2015Land Use/Process Alignment Ruling Released September 2015Land Use/Process Alignment Webinar Oct/Nov 2015Land Use/Process Alignment Workshop December 2015Special Study Results Available from CAISO Q1 2016 RPS Calc 6.2 Released (inc. modified Energy Only parameters, if applicable) Portfolios Developed and Vetted Portfolios Submitted to CAISO Q2-Q4 201650% Policy-Preferred Needs Assessment or Special Study (schedule depends on type and nature of studies)


Download ppt "1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection."

Similar presentations


Ads by Google