Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on 802.11 Revision PAR Date: 2008-11-11 Authors:

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on 802.11 Revision PAR Date: 2008-11-11 Authors:"— Presentation transcript:

1 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on 802.11 Revision PAR Date: 2008-11-11 Authors:

2 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 2 Abstract This document contains the comments received and the recommended resolutions for the 802.11 Revision PAR submission to 802 EC.

3 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 3 Feedback Received on 802.11 Revision PAR From Paul Nikolich Please list the approved amendments that are anticipated to be rolled up into the documents as part of the revision in 5.5 Need for Project part of the PAR form. A simple list of the numbers would be sufficient (i.e., the entire titles aren't necessary).

4 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 4 Proposed Response to Feedback Add a new sentence in 5.5 need for Project clause: –“The approved amendments as of the filing of the revision PAR include 802.11k, 802.11r, and 802.11y amendments.”

5 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 5 5.5 Need for the Project: The reason for this project is to incorporate accumulated maintenance changes (editorial and technical corrections) into 802.11-2007, and roll up the approved amendments to the standard. The approved amendments as of the filing of the revision PAR include 802.11k, 802.11r, and 802.11y amendments.

6 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 6 Motion to accept Proposed Response TGmb Motion: Accept the proposed response contained in 08/1373r0 slide 4. –Moved: Jon Rosdahl2 nd Mike Montumorrow

7 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 7 Motion to Amend Change 802.11k, 802.11r, 802.11y to “ P802.11k- 2008, P802.11r-2008, and P802.11y-2008”, and change motion to refer to proper slide. Accepted without objection

8 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 8 TGmb Approved Proposed Response to Feedback Add a new sentence in 5.5 need for Project clause: –“The approved amendments as of the filing of the revision PAR include P802.11k-2008, P802.11r-2008, and P802.11y-2008 amendments.”

9 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 9 TGmb Motion to approve slide 8 as the response. TGmb Motion: Accept the proposed response contained in 08/1373r0 slide 8. –Moved: Jon Rosdahl2 nd Mike Montumorrow TGmb: 8-0-0 motion approved

10 doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 10 802.11 WG Motion Accept as resolution to the feedback from Paul Nikolich: –Add a new sentence in 5.5 need for Project clause: “The approved amendments as of the filing of the revision PAR include IEEE 802.11k-2008, IEEE 802.11r-2008, and IEEE 802.11y-2008 amendments.” –Moved: Jon Rosdahl (CSR) –2 nd Peter E. (CISCO) –90 y, 0 n, 0 a – Motion Passes.


Download ppt "Doc.: IEEE 802.11-08/1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on 802.11 Revision PAR Date: 2008-11-11 Authors:"

Similar presentations


Ads by Google