EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Eurisol Week 2005.

Similar presentations


Presentation on theme: "EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Eurisol Week 2005."— Presentation transcript:

1 EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Eurisol Week 2005

2 Design Study G. Fortuna, Eurisol Week 2005 THE GOAL: Producing an engineering oriented study of the EURISOL Facility and developing prototypes of the most critical parts of the facility itself. “Starting point: EURISOL RTD Recommendations” “Working method based on the botton-up process”

3 Design Study G. Fortuna, Eurisol Week 2005

4 The Beta-Beam Concept Design Study G. Fortuna, Eurisol Week 2005

5 some M€ tens of M€ 100 M€ ~600 M€ - 950 M€ EXCYT,TRIUMF, GANIL ORNL,REX ISOLDE, LOUVAIN LA NEUVE UPGRADING THERE IS STILL A ROLE FOR THE EUROPEAN NATIONAL LABS GSI 2012-2013 few kW 2003 10-20 kW 2005-8 100kW 2010- 2015 YES up to 5 MW after 2015 ~10 5 p/s ~10 6 p/s ~10 8,9 p/s ~pnA ? NETWORKING of complementary facilities (SPES, SPIRALII, MAFF, HIE-ISOLDE) tens 11/2005 We stand here

6 European Roadmap for RIB facilities

7 IDENTITY CARD EC CONTRIBUTION: (k€)9161.9 - FTE 113,25 (p*y) EC CONTRIBUTION: (k€) 9161.9 - FTE 113,25 (p*y) TASKS: 1+11 TASKS: 1+11 (MANAGEMENT + FOUR TOPIC AREAS) PARTICIPANTS: 20 (15 countries involved) GANIL (F), CNRS/IN2P3 (F), INFN (I), CERN (UE), UCL (B), CEA (F), NIPNE (RO), JYU (FI), LMU (G), FZJ (G), FI (LT), UW (PL), SAS (SK), U- LIVERPOOL (UK), GSI (G), USDC (E), CCLRC (UK), PSI (CH), IPUL (LV), SU MSL (SE) PROJECT ESTIMATED TOTAL EFFORTS: (k€) 32.284,3 - FTE 490,45 ( p*y) DURATION OF THE PROJECT: 48 MONTHS STARTING DATE: FEBRUARY 1st, 2005 COORDINATING INSTITUTION: GANIL (F) CONTRIBUTORS: 20 (12 countries involved from Europe, Asia and North America) U-FRANKFURT (G), BUDKER (RU),VNIIFT (RU), PNPI (RU), ORNL (USA), ANL (USA), KAERI (SKR), TRIUMF (CA),JAERI (JP), SOREQ (IL), U-MAINZ (G), VINCA (YU), KVI (NL), U-SURREY (UK), U-YORK (UK), U-PAISLEY (UK), U-UPPSALA (SE), NSCL (USA), FNAL (USA), HUG (CH) Design Study G. Fortuna, Eurisol Week 2005

8 4 TOPIC AREAS EURISOL DS MANAGEMENT (GANIL/INFN-LNL/CNRS-IN2P3/CERN) 1 Targets and ion sources (Synergies with neutron spallation sources and neutrino facilities) –Multi-MW target station : liquid- mercury converter (CERN) –Direct target : Several target-ion source systems (CERN,INFN-LNL) –Fission target : UC x target optimization (INFN-LNL, INFN-LNS) 2 Accelerators (Synergies with HIPPI (CARE)) –Proton accelerator design: the driver (INFN-LNL): –Heavy ion accelerator design: the post accelerator (GANIL,INFN-LNL) –SC cavity development: cavity prototypes and multipurpose cryomodule (CNRS- IN2P3/IPNO,INFN-LNL) 3 Physics, yields, safety and radioprotection (Synergies with EURONS) –Physics and instrumentation: conceptual design of novel instruments (U-LIVERPOOL,INFN-Pi,INFN-Na) –Beam intensity calculations: yield optimization of RIB species (GSI) –Safety and radioprotection: radiation fields, activation, shielding, handling, storage, conformity to legislation (CEA) 4 Beta-Beams Aspects (Synergies with BENE (CARE), EURONS) –Beam preparation : breeders, 60 GHz ECR source (JYV,INFN-Ba) –Beta-beam aspects: conceptual design report of the Beta-Beam facility. It includes preliminary studies on modifications of CERN accelerators in case the facility is sited at CERN ( CERN) Design Study G. Fortuna, Eurisol Week 2005

9 YEAR 2003 MAY 12th THE WRITING GROUP (G. FORTUNA, P. BUTLER, Y. BLUMENFELD) IS APPOINTED BY THE EURISOL STEERING COMMITTEE AT THE ORSAY MEETING) THE WRITING GROUP (G. FORTUNA, P. BUTLER, Y. BLUMENFELD) IS APPOINTED BY THE EURISOL STEERING COMMITTEE AT THE ORSAY MEETING) END OF JULY THE CALL FOR COLLECTING LETTERS OF INTEREST TO PARTICIPATE IN THE EURISOL DS IS LAUNCHED. SEPTEMBER 20th FOURTY LETTERS OF INTERERST FROM ABOUT 20 DIFFERENT INSTITUTIONS ARE COLLECTED BY THE WRITING GROUP. OCTOBER 2nd,3rd AT THE EURISOL STEERING COMMITTEE MEETING HELD AT LNL 11 DIFFERENT TASKS ARE IDENTIFIED AND THE TASK LEADERS APPOINTED. NOVEMBER 14th AT ORSAY FIRST OPEN MEETING OF THE TASK LEADERS WITH THE WRITING GROUP. A PROVISIONAL WORK PLANNING OF THE VARIOUS TASKS IS PRESENTED AND DISCUSSED. DECEMBER 5-6th PRESENTATION OF THE EURISOL DS PROPOSAL STATUS AT THE NUPECC FRASCATI MEETING EURISOL DS MILESTONES Design Study G. Fortuna, Eurisol Week 2005

10 YEAR 2004 JANUARY 8th DEADLINE FOR THE PREPARATION OF AN ADVANCED DESCRIPTION OF THE TASKS CONTAINING: WORK PLANNING, MILESTONES, DELIVERABLES AND REQUESTED RESOURCES. DEADLINE FOR THE PREPARATION OF AN ADVANCED DESCRIPTION OF THE TASKS CONTAINING: WORK PLANNING, MILESTONES, DELIVERABLES AND REQUESTED RESOURCES. JANUARY 19th-21st BRUSSELS: MEETING OF WRITING GROUP FOR THE PRELIMINARY ANALISYS OF THE DOCUMENTATIONS SENT BY TASK LEADERS. FIRST CHECK OF THE GLOBAL COHERENCE AND OF REQUESTED RESOURCES. FEED-BACK INSTRUCTIONS TO TASK LEADERS BRUSSELS: MEETING OF WRITING GROUP FOR THE PRELIMINARY ANALISYS OF THE DOCUMENTATIONS SENT BY TASK LEADERS. FIRST CHECK OF THE GLOBAL COHERENCE AND OF REQUESTED RESOURCES. FEED-BACK INSTRUCTIONS TO TASK LEADERS JANUARY 26-27th Orsay: JOINT MEETING OF THE WRITING GROUP AND THE EURISOL STEERING COMMITTEE TO EXAMINE THE STATUS OF THE PROPOSAL AND ITS GLOBAL COHERENCE. PLENARY MEETING OF WG FEBRUARY 16-18th CERN: OPEN MEETING OF THE WRITING GROUP AND THE TASK LEADERS FOR THE UPDATE OF THE PROPOSAL DRAFT. PLENARY MEETING OF WG FEBRUARY 25-27th PADOVA: FINAL MEETING OF WG BEFORE THE PROPOSAL SUBMISSION TO UE Design Study G. Fortuna, Eurisol Week 2005 EURISOL DS MILESTONES

11 Design Study G. Fortuna, Eurisol Week 2005 MARCH,2nd 2004 PROPOSAL SUBMISSION TO EC PROPOSAL SUBMISSION TO EC MAY, 28th 2004 EVALUATION SUMMARY REPORT NOTIFICATION EVALUATION SUMMARY REPORT NOTIFICATION JULY, 16th 2004 MEETING OF INTERIM MB ON NEGOTIATION MATTERS AND FIRST VERSION OF THE CONSORTIUM AGREEMENT JULY, 28th 2004 LAUNCH OF CONTRACT NEGOTIATIONS SEPTEMBER, 30th 2004 FIRST SUBMISSION OF ANNEXI TO THE CONTRACT (DESCRIPTION OF THE WORK ) AND CPF FORMS DECEMBER, 17th 2004 FINAL VERSION OF ANNEXI: END OF NEGOTIATION FOR TECHNICAL AND SCIENTIFIC MATTERS FOR TECHNICAL AND SCIENTIFIC MATTERS EURISOL.DS MILESTONES

12 FEBRUARY, 1st 2005 PROJECT STARTING DATE FEBRUARY, 2-3, 2005 KICK-OFF MEETINGS KICK-OFF MEETINGS FEBRUARY, 25th, 2005 END OF NEGOTIATION PHASE, CONTRACT IN PREPARATION END OF NEGOTIATION PHASE, CONTRACT IN PREPARATION MARCH, 22nd, 2005 CONTRACT SIGNATURE BY GANIL AND EC APRIL, 22nd, 2005 ALL PARTICIPANTS ACCESSED TO THE CONTRACT MAY, 9th, 2005 PRE-FINANCING PAID TO PARTICIPANTS MAY, 27th, 2005 IAP’S MEMBERS APPOINTMENTED JUNE, 6th, 2005 AGREEMENT REACHED ON EURISOL DS CONSORTIUM AGREEMENT JULY, 29th, 2005 CONSORTIUM AGREEMENT SIGNED BY ALL PARTICIPANTS CONSORTIUM AGREEMENT SIGNED BY ALL PARTICIPANTS Design Study G. Fortuna, Eurisol Week 2005 EURISOL DS MILESTONES OF FIRST SEMESTER 2005 27 MONTHS

13 Design Study

14 G. Fortuna, Eurisol Week 2005 44 9 13 8 5 3 9 15 99 0 2 4 6 8 10 12 14 16 Management Multi MW Target Station Direct Target Fission Target Safety& Radioprotection Heavy Ion Accelerator Design Proton Accelerator Design SC Cavity Development Beam Preparation Physics and Instrumentation Beam Intensity Calculations Beta Beams Aspects Participants and Contributors per task

15 Design Study G. Fortuna, Eurisol Week 2005

16 Design Study G. Fortuna, Eurisol Week 2005

17 Design Study

18 STEERING COMMITTEE 1 representative of each Participant + Management Board and Chairs of NUPECC, ESGARD, EURONS (all ex-officio) 1 meeting/year MANAGEMENT BOARD Project Leader + 3 Members MANAGEMENT SUPPORT TEAM 1. Administrative Office 2. Scientific liaison Office 3. Technical coordinator COORDINATION BOARD Management Board + Task Leaders + Coordinators of HIPPI JRA and BENE Network (ex-officio) 2-3 Meetings/year INTERNATIONAL ADVISORY PANEL 3 Members – 1 Meeting/year ANNUAL PARTICIPANT MEETING 1 Meeting/year Task 2 Task n Task 1 MANAGEMENT STRUCTURE Design Study G. Fortuna, Eurisol Week 2005 REVIEW COMMITTEE 3 Members Project publications

19 STEERING COMMITTEE It is the governing body of the DESIGN STUDY determining the political and strategic orientation of the project: - activity planning, allocation of the resources, management appointment, inclusion and withdrawal of contractors. VOTING RULES: quorum 2/3 of members - usually majority 3/4 of votes - simple majority for Chair, MB and IAP appointment - unanimous vote for inclusion or withdrawal of contractors Design Study G. Fortuna, Eurisol Week 2005

20 SC-kick-off meeting (Orsay 4th Feb. 05) summary and recommendations 1.The need of a standing IAP was deeply debated. The consensus was reached on the basis of a Panel mission focussed on technical and scientific matters. 2.Synergies with HIPPI, BENE, EURONS and EUROTRANS were discussed. It was recommended to cultivate all the possible contacts, exchange of information, collaboration in specific WP, invitation to meetings of common interest. 3.The impact of pulsed machines on target lifetime was discussed. The subject is of extreme importance in case of driver sharing among different users ( RIB, Beta beams, neutrino factories…) Quantitative exploration to which extent a RIB target could withstand high power pulsed beam operation is needed. 4.Investigating the use of the Beta beam rings to push the RIB energies well over 100 MeV*A for secondary fragmentation. Some reference parameters should be fixed for the next SC meeting. 5.Implementation of an electronic data management to facilitate the flow of information within and outside the EURISOL community ( EDMS-CERN type suggested) Design Study G. Fortuna, Eurisol Week 2005

21 INTERNATIONAL ADVISORY PANEL (appointed by the SC at the kick-off meeting) –It is composed of three Int. Experts covering the domains of RIB Science, accelerators and high power production targets –It is in charge of critical assessment of the technical and scientific aspects of the Project –It may be consulted, any time, by the SC and MB on specific scientific and organizational aspects. Members appointed by SC on May 27th, 05: P.Schmor (Triumf), S.Brandemburg (KVI), W. Nazarewicz (Ornl) Design Study G. Fortuna, Eurisol Week 2005

22 Design Study G. Fortuna, Eurisol Week 2005 USE AND DISSEMINATION OF KNOWLEDGE IN ORDER TO COMPLY WITH CONTRACT PROVISIONS AND TO SAFEGUARD CONTRACTOR RIGHTS A REVIEW COMMITTEE HAS BEEN SET UP COMPOSITION: The RC, appointed by the SC, is composed of 3 members, two proposed by the SC Chair and the third, chosen among the MB Members, designated by the Project Leader. ROLE OF THE RC: According to the EC contract provisions, the RC shall ensure, on behalf of Contractors (SC), the consent to the publication of data produced during the implementation of the Project activities. In particular the RC: a) shall review all planned publications ensuring the quality of the content (journal publications, proceedings, technical notes); b) shall identify the knowledge that could be subject to protection measures by decision of the SC. A specific procedure for the submission and the approval of planned publications has been drafted by the MB.

23 FEBRUARY, 1st 2005 PROJECT STARTING DATE FEBRUARY, 2nd-3rd, 2005 KICK-OFF MEETINGS KICK-OFF MEETINGS APRIL, 18th, 2005 FIRST MANAGEMENT BOARD MEETING FIRST MANAGEMENT BOARD MEETING JULY, 8th, 2005 FIRST CB AND SECOND MB MEETINGS OCTOBER, 3rd, 2005 THIRD MANAGEMENT BOARD MEETING NOVEMBER 28th – DECEMBER 1st, 2005 EURISOL DS WEEK ( OPEN MEETING, SC, CB, MB AND IAP MEETINGS) Design Study G. Fortuna, Eurisol Week 2005 EURISOL DS MANAGEMENT MEETINGS IN 2005 (Agendas and minutes available at www.eurisol.org)