1 E. Mountain Drive Sink Hole Call received Ms. White March 7 th Response Richard Navarro March 7 th

2 E. Mountain Drive Sink Hole

3

4

5

6 Old Structure Gravity Stone Wall Wall Height: 26’ Repair Structure Steel Pile with Timber Lagging Tie old wall to the new wall Toe Protection

7 E. Mountain Drive Sink Hole

8

9

10

11 Environment Friendly Cost Effective Appropriate Solution Quick Fix Road Open March 29 th

12 Project Funding Construction Cost $60,000

13 County of Santa Barbara Eric PearsonProject Manager John Parsons Inspector MarkRynkiewiczConstruction Engr Charlie Elbert Env. Specialist Md. Wahiduzzaman Engineering Don PhelpsLash Construction Project Team

14 END Thank You!