Presentation is loading. Please wait.

Presentation is loading. Please wait.

City Council Meeting May 14, 2013. High Pedestrian Bridge Repairs Consideration of approving Change Order #15 to include the repair of the pedestrian.

Similar presentations


Presentation on theme: "City Council Meeting May 14, 2013. High Pedestrian Bridge Repairs Consideration of approving Change Order #15 to include the repair of the pedestrian."— Presentation transcript:

1 City Council Meeting May 14, 2013

2 High Pedestrian Bridge Repairs Consideration of approving Change Order #15 to include the repair of the pedestrian bridge west of Abe Street under the agreement with Templeton Construction Co., Inc. Construction Manager at Risk, for the Concho River & Parks Rehabilitation Project PK-05-10 in the amount of $167,128.00, and requesting approval for said amount to be funded in equal parts by River Project contingency funds and the City Self-Insurance Fund; and authorizing the City Manager to execute said change order.

3 High Pedestrian Bridge Repairs

4

5 We looked at 2 options: replace or repair. Replacement cost $210,948.00; repair cost $167,128.00. Replacement warranty 10-year; repair 1-year on work. Replacement lifespan 50 years; repair lifespan 50 years. Replacement completion mid October; repair completion replacement mid September.

6 High Pedestrian Bridge Repairs Replacement, standard lumber with shorter lifespan; repair, option for hardwood lumber with 10-year longer lifespan. Replacement, require additional ramp work. Replacement, possible impact on pylons. Original bridge manufacturer no longer in business. Staff is researching possible claim on original bridge installation insurance provider.

7 High Pedestrian Bridge Repairs

8


Download ppt "City Council Meeting May 14, 2013. High Pedestrian Bridge Repairs Consideration of approving Change Order #15 to include the repair of the pedestrian."

Similar presentations


Ads by Google