Download presentation
Presentation is loading. Please wait.
Published byElmer Johnston Modified over 7 years ago
1
WORKPLACE SAFETY PROGRAM 2014
2
AGENDA SECURITY PROTOCOLS AND EVACUATIONS WORKPLACE SAFETY AUDITS MAINTENANCE INJURY EXPERIENCE MANDATORY PROTECTIVE EQUIPMENT PROCEDURES MAINTAINING SHOP FLOORS MAINTAINING PROPERTIES DURING SNOW/ICE CONDITIONS
3
BASIC SECURITY PROTOCOLS Advance notice of visitors, contractors and vendors Direct folks thru front lobby when open Sign in/Out and display a sticker Greet and escort Professionally confront all those especially in off hours Report to your supervisor
4
EVACUATIONS Initiated with Fire alarm or directed Each area has a fire captain CDTA Command and 911 call Common assembly points Maintaining radio communication Managing traffic flow Alternate location for evacuees Resuming your operation
5
40 Miles of Bus Rapid Transit
6
Red Line (New York 5) Downtown Schenectady to Downtown Albany Purple Line (Washington/Western) Crossgates to Downtown Albany Blue Line (River Corridor) Albany South End to Troy, Cohoes, Waterford Red Line & Purple Line Western & Eastern Extensions
7
Washington-Western BUS RAPID TRANSIT
8
BRT Customer Amenities Real-Time Bus Arrival Information Large Stations with more seating, improved lighting, and security
9
Advanced Bus Fleet 60 Foot – Articulated Buses Hybrid-DieselPassenger WiFi
10
Transit Priority Infrastructure Transit Signal Priority Queue Bypass Lanes / Bus-Only Lanes
11
Corridor Characteristics Over 3 Million Riders per Year Dense urban corridor Downtown Albany Educational corridor – College of Saint Rose – Four UAlbany campuses – Student neighborhoods – Albany High School Harriman Campus Crossgates Mall
13
Downtown Albany
14
Education District
15
Campus Area
16
Mall
17
Next Steps November 12 th – Public Meeting Winter – Submit application to Federal Transit Administration 2014-15 – Final Design / Engineering 2015-16 – Construction 2017 – Begin Operations
18
River Corridor BUS RAPID TRANSIT
19
Corridor Characteristics 15 Miles Over 2 Million Riders per Year Dense, walkable cities and neighborhoods Downtown Albany Downtown Troy Low Income Neighborhoods Transfer connections with majority of CDTA system
20
Next Steps Spring / Summer 2014 – Conceptual Design Study Fall / Winter 2014 – Preliminary Engineering 2015 – Final Design / Engineering 2015-16 – Construction 2016-17 – Begin Operations
21
XXXXXXXX XXXXXXX XXXXXX XXXX XXXXX - 10/2/2013 XXXXXXXXXX
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.