Presentation is loading. Please wait.

Presentation is loading. Please wait.

 1. 2. 3. 4. 1.Cut out outline of building. 2.Snip along dashed lines. 3.Fold up sides and roof into upside U 4.Fold in side flaps (a), fold down end.

Similar presentations


Presentation on theme: " 1. 2. 3. 4. 1.Cut out outline of building. 2.Snip along dashed lines. 3.Fold up sides and roof into upside U 4.Fold in side flaps (a), fold down end."— Presentation transcript:

1  1. 2. 3. 4. 1.Cut out outline of building. 2.Snip along dashed lines. 3.Fold up sides and roof into upside U 4.Fold in side flaps (a), fold down end flap (b). 5.Tape or glue flaps in place. If gluing, use paper clip to hold flaps in place until dry. 6.Hit circles can be covered with transparent tape and dry erase markers used to record damage. a a a a bb 3D Navy Yard Buildings Assembly Instructions Designed by Pete Pellegrino Buildings come in three types, fuel/oil tanks, machine/repair shops, and hangar/warehouse. Assembly is the same for all. a b

2 DANGER 3D Navy Yard Buildings Sheet 1 of 2

3 3D Navy Yard Buildings Sheet 2 of 2

4 AAA Batteries Sheet 1 of 1 Marker for use with Turn Tracker. Can also use coin, poker chip, etc. Fort Barrette Fort weaver Fort clossonFort AUHA Radar search sector Radar fails – no detection on a roll less than 3 Use these markers to indicate appropriate search sectors on day of attack. PBY SEARCH SECTOR

5 Alternative 2D Navy Yard Buildings Sheet 1 of 1


Download ppt " 1. 2. 3. 4. 1.Cut out outline of building. 2.Snip along dashed lines. 3.Fold up sides and roof into upside U 4.Fold in side flaps (a), fold down end."

Similar presentations


Ads by Google