1 UTTAR PRADESH IRRIGATION DEPARTMENT BUNDELKHAND PACKAGE

2 OBJECTIVE:  LINING OF THE EXISTING SYSTEM TO PREVENT SEEPAGE LOSSES.  ADOPTING EFFICIENT SYSTEM OF WATER CONVEYENCE, DISTRIBUTION AND APPLICATION.  HARVESTING RAIN WATER BY REPAIR AND RENOVATION OF EXISTING WATER BODIES AND CONSTRUCTING CHECK DAM, DIGGING PONDS ETC.

3 SCHEME-A COMPLETION OF ONGONING WORKS  TWO PROJECTS ARE PROPOSED  CREATION OF 3102 HECT. ADDITIONAL IRRIGATION POTENTIAL.  ONE PROJECT-COST Rs. 4.16 CR ( ACA- Rs. 3.11 CR) APPROVED BY PLANNING COMMISSION. MINISTRY APPROVAL AWAITED.  SECOND PROJECT- Rs. 3.85 CR SHORTLY TO BE SUMITTED TO GOI.  SANCTIONED PROJECT- Rs. 4.16 CR INCLUDING CENTRAL SHARE RELEASED.

4 SCHEME-B REPAIR & RENOVATION OF PONDS/TANKS ETC.  PROJECTS RETURNED BY GOI FOR TAC AND SLTC APPROVAL.  39 PROJECTS APPROVED BY SLTC-COST Rs. 99.325 CR SUBMITTED TO GOI.  CREATION OF 26518 HECT. ADDITIONAL IRRIGATION POTENTIAL.  EARLY SANCTION REQUESTED.

5 SCHEME-C RESTORING CAPACITIES OF CANAL, REPAIRS, RENOVATION & REMODELLING OF CANALS  32 PROJECTS- COST Rs. 284.79 CR  CREATION OF 65985 HECT OF ADDITIONAL IRRIGATION POTENTIAL.  STATE SANCTIONED – Rs. 51.94 CR INCLUDING CENTRAL SHARE FOR 7 PROJECTS.

6 MECHANICAL PART CHANGING PUM SETS, RECONSTRUCTION OF WATER DISTRUBUTION NETWORK  THREE PROJECTS (Rs. 10.00 CR ALREADY SUBMITTED TO GOI SANCTION AWAITED  LIFT IRRIGATION SCHEME FOR JALAUN DISTRICT ( Rs. 2.00 CR) APPROVED BY GOI STATE RELEASED Rs. 2.00 CR TO THE DEPARTMENT.