Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised.

Similar presentations


Presentation on theme: "Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised."— Presentation transcript:

1 Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

2 NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of 1974-1976 Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group1983-2002 Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble- shooter”), 1990-1995 as Production Manager (Stabilator AB- International Division in Poland), 1995-2001 in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned 1991-2002 Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned 2002-2009 Polish Najder engineering ® operating in Poland. Now Anna Monika is working as tunnelling consultant in Abu Dhabi. since six generations.Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering ready 2

3 3 Tomasz in PragueAnna and Tomasz in IstanbulAnna Monika on IcelandJan in Hallandsås ready

4 4 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Tunneling, rock stability high/low-pressure grouting,Tunneling, rock stability and soil improvement (deep mixing method, high/low-pressure grouting, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Coast protection. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready 4

5 Tomasz Najder Ph.D Civ. Eng. Born 1951 in Gdańsk (Danzig) in Poland. 1974 M.Sc. Civ. Eng. at Technical University in Gdańsk / Polen. 1980 Doctors thesis within geotechnical engineering at Technical University in Gdańsk. Since 1982 in Sweden. Employed in Skanska 1983-2002 as Site Manager, Contract Manager, Internal Consultant (”trouble-shooter”). 1995-2001 Vice President- Executive Manager of Stabilator Polen. Since 2002 Senior Consultant within family company Najder Engineering ® in Stockholm. Dealing with grouting since 1974. ready press 5

6 6 ready

7 7 ready

8 8 ready

9 Water inflow into Icelandic rock mass: - Ólafsfjördur Tunnel ready

10 10 Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel ready

11 11 ready

12 12 ready

13 13 ready

14 14 ready Project description: - The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield 6.120 mm diameter): Total length 3.300m, including ca. 1.500m marine crossing section. The first tunnel in the world between two continents

15 15 ready Coast...... “5’ to 12.00 o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions - the first site with gabions based on double twisted mesh (March 1993) First storm – April 1993 After completion of works – May 1993 July 1996

16 16 Slope collapse 2002 ready

17 17 Different stages of cliff rebuilding ready

18 18 ready Deep-Soil-Mixing to create the sealing core of the embankments (Żu ł awy polder in Poland)

19 19 The catastrophic flood – Gdańsk (Poland) 2001 2 m ready

20 20 ready

21 21 ready

22 22 2-3 m/s ready

23 23 ready Concrete repairs - waterproofing

24 24 Royal Castle in Warsaw (Warszawa) - probably the most sofisticated slope protection, waterproofing systems and drainage in the world (?) ready

25 25 ready

26 26 ready

27 Thank You for Your attention! ready 27 THE END

28 ready Welcome to www.najder.se 28