Reconstruction of HHS Courtyard Carson Edge Jeremy Chwastowski Ryan Landry Joel Griffith
2
Overview IntroductionPhase 1Phase 2Total CostConclusion/Questions
3
Introduction Objectives ▫Visually pleasing ▫More seating ▫Increase everyday use ▫Address special events Constrained to remove orange pad
4
Phase 1
5
Rounding of Paths
6
Lunchroom Paths
7
New Eating Area
8
Terraced Plant Beds
9
Terraced Planting Beds Continued
10
Benches
11
Umbrella Tables
12
PA System
13
Art Area
14
Phase 1 Overview Removal of two trees Removal of four light poles 170 total seats Cost - $71,000 Flexible design Tables are path oriented Removal of bushes
15
Phase 2
16
Pathways
17
Flooring
18
Tables
19
Phase 2 Overview 24 additional seats Address special events Dances Luncheons Ceremonies
20
Final Costs
21
Questions