Presentation is loading. Please wait.

Presentation is loading. Please wait.

E X P E R I E N C E Y O U R A M E R I C A ALLIANCE MID-ATLANTIC MARCH 31, 2016.

Similar presentations


Presentation on theme: "E X P E R I E N C E Y O U R A M E R I C A ALLIANCE MID-ATLANTIC MARCH 31, 2016."— Presentation transcript:

1 E X P E R I E N C E Y O U R A M E R I C A ALLIANCE MID-ATLANTIC MARCH 31, 2016

2 E X P E R I E N C E Y O U R A M E R I C A The National Park Service preserves unimpaired the natural and cultural resources and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The Park Service cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world. OUR MISSION STATEMENT

3 E X P E R I E N C E Y O U R A M E R I C A NPS REGIONS

4 E X P E R I E N C E Y O U R A M E R I C A NORTHEAST REGION FAQs The Northeast Region has over 100 national park units from Maine to Virginia ranging from wilderness areas, coastal habitats, historical and recreational trails, historic sites and battlefields. A few of the “iconic” parks within the Region are: Independence National Historical Park – “The Cradle of Liberty” and the home of both the Liberty Bell and Independence Hall. In addition the park interprets events and the lives of our diverse population during the years when Philadelphia was the capital of the United States from 1790 to 1800. Statue of Liberty / Ellis Island - These sites symbolize and commemorate the living reality of freedom, democracy and opportunity in the United States.. Preservation of the Statue of Liberty National Monument encompasses all cultural and natural resources on Liberty and Ellis Islands. Boston National Historical Park – Comprised of Old South Meeting House, Old State House, Faneuil Hall, the Paul Revere House, and Old North Church.

5 E X P E R I E N C E Y O U R A M E R I C A The Northeast Region is comprised of three (3) Major Acquisition Buying Offices (MABOs) and each office is set-up to handle the procurement of specific commodities: Philadelphia, PA – Construction; Architect/Engineer Design and Interagency Agreements MABO Lead – Jody Auerbach Boston, MA – Services MABO Lead – Diane McKenzie Staten Island, NY – Supplies and Fuel Purchases MABO Lead – Spencer Hamilton

6 E X P E R I E N C E Y O U R A M E R I C A Small Business Specialist Denny Braccia Phone: (215) 597-5374 Email: denny_bracia@nps.gov Regional Chief of Contracting Marilyn Colot Phone: (215) 597-7143 Email: marilyn_colot@nps.gov National Park Service POC’s

7 E X P E R I E N C E Y O U R A M E R I C A Government Acquisition Portal: https://www.fedconnect.net/FedConnect/Default.htm Internet Payment Platform – IPP: www.ipp.govwww.ipp.gov Interested Vendors Should Register at: www.SAM.govwww.SAM.gov Doing Business With Us: http://www.nps.gov/orgs/1651/doingbusinesswithus.htm http://www.nps.gov/orgs/1651/doingbusinesswithus.htm DOI/NPS Forecast: www.doi.gov/pmb/osdbu/forecastwww.doi.gov/pmb/osdbu/forecast IMPORTANT LINKS

8 FY’15 Workload (Breakdown by $ Range) Actions >$500K Actions $150K-$500K Actions $25K-$150K Actions <$25K Total Actions Total $$ VolumeTOTALS124225010271331$46.6M E X P E R I E N C E Y O U R A M E R I C A

9 FY’15 Workload (Breakdown by Commodity, # of Actions & $ Value) No. of A/E Actions $ Value A/E Actions No. of Const. Actions $ Value Const. Actions No. of Service Actions $ Value Service ActionsTOTALS68$970K189$13.0M536$23.2M E X P E R I E N C E Y O U R A M E R I C A No. of Supply Actions $ Value Supply Actions538$9.4M

10 FY’15 Breakdown by Commodity & $ Range Commodity Actions >$500K Actions $150K-$500K Actions $25K-$150K Actions <$25K Total Actions A/E0185968 Construction42955101189 Services8539484536 Supplies07148383538 TOTALS124225010271331 E X P E R I E N C E Y O U R A M E R I C A

11 *FY’15 Interagency Agreements Actions >$500K Actions $150K-$500K Actions $25K-$150K Actions <$25K Total ActionsTotal $$ Volume65252460$8.0M E X P E R I E N C E Y O U R A M E R I C A

12 FY’15 Workload by Commodity FY’15 Workload by Commodity Architect/Engineer = 68 Actions – 4.9 % of Workload Construction = 189 Actions – 13.5 % of Workload Services = 536 Actions – 38.6 % of Workload Supplies = 538 Actions – 38.7 % of Workload IA’s = 60 Actions – 4.3 % of Workload E X P E R I E N C E Y O U R A M E R I C A

13 NER CONTRACTING METRICS OVER LAST 3 YEARS Actions >$1M Actions >$500K Actions >$150K Actions <$150KTotal Actions Total Volume ($M) FY'13 TOTAL184217210511283$49.40 FY'14 TOTAL131632011361485$56.00 FY'15 TOTAL574212771331$46.60 3 YR. AVERAGE12.021.7178.01154.71366.3$50.67

14 E X P E R I E N C E Y O U R A M E R I C A Socio-Economic Goaling Report Actions reported for Oct 1, 2014 - September 30, 2015 Northeast Region $ ObligatedFY'15Pct. Above Total$44,282,623% of $'sGoalsGoal Small Business $29,581,082 SB 66.8%53.0%13.8% SDB Program $12,138,144 SDB 27.4%5.0%22.4% 8(a) Program $5,370,918 8(a) 12.1% ** Service Disabled Veteran $2,159,704 SDV 4.9%3.0%1.9% Women Owned $5,466,250 WOB 12.3%5.0%7.3% HUBZone $2,806,928 HZ 6.3%3.0%3.3% *No 8(a) Small Business Goal has been established through negotiation with the SBA for the Department E X P E R I E N C E Y O U R A M E R I C A

15 TYPES OF CONTRACT ACTIONS E X P E R I E N C E Y O U R A M E R I C A Firm Fixed Price Firm Fixed Price Low Price Best Value Source Selection: Low Price Technically Acceptable or Trade off process DOI Mandatory Contracts- ex for computers. GSA Schedules Open Market


Download ppt "E X P E R I E N C E Y O U R A M E R I C A ALLIANCE MID-ATLANTIC MARCH 31, 2016."

Similar presentations


Ads by Google