Presentation is loading. Please wait.

Presentation is loading. Please wait.

SAB Sponsor Report Paul Eastman SAB Special Projects 1/28/14.

Similar presentations


Presentation on theme: "SAB Sponsor Report Paul Eastman SAB Special Projects 1/28/14."— Presentation transcript:

1 SAB Sponsor Report Paul Eastman SAB Special Projects 1/28/14

2 C/SAB/1680 Standards Environmental Assessment of Electronic Products Completed Standards - 3 Working Groups - 2 PAR Requests- 0 P1680 has reformed and beginning work on their pars P1680.1 Chair: William Hoffman P1680.4 Chair: Jennifer Costley

3 C/SAB/1857 Standards Audio Video Coding (Low Speed) Completed Standards - 7 Working Groups - 1 (Main) PAR active- 4 P1857 is being led from China and is International in participation Chair: Wen Gao

4 C/SAB/3333 Standards 3D Based Medical Applications Completed Standards - 1 Working Groups - 1 (Main) PAR active- 2 P3333 is being led from Korea and is International in participation and is close to balloting P3333.1 Chair: Krista Gluchoski

5 C/MSC Microprocessor Standards Committee George Reilly has resigned as the Chair MSC has been placed under SAB Special projects until a new Chair can be found Working groups w/ active PARs include: –P1394 High Performance Serial Bus –P1722 Layer 2 Transport Protocol Time sensitive –P1788 Interval Arithmetic –P1817 Consumer-ownable Personal Property –P1823 Universal Power Adapter for Mobile Devices


Download ppt "SAB Sponsor Report Paul Eastman SAB Special Projects 1/28/14."

Similar presentations


Ads by Google