Presentation is loading. Please wait.

Presentation is loading. Please wait.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.

Similar presentations


Presentation on theme: "Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives."— Presentation transcript:

1 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives Lecture No. 18 Chapter 5 Contemporary Engineering Economics Copyright © 2016

2 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Projects: Basic Terminologies Mutually Exclusive Projects Alternative vs. Project Do-Nothing Alternative

3 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Revenue Versus Service Projects Revenue ProjectsService Projects o Project revenues depend on the choice of alternatives o Project revenues do not depend on the choice of alternatives o Revenue and cost streams vary with the choice of alternatives o Fixed (or constant) revenues for all alternatives

4 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Analysis Period Versus Required Service Period Analysis Period The time span over which the economic effects of an investment will be evaluated (study period or planning horizon) Required Service Period The time span over which the service of equipment (or investment) will be needed

5 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Road Map: A Process of Making a Choice Among Mutually Exclusive Alternatives

6 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Projects  Principle: Projects must be compared over an equal time span..  Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period.

7 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 1  Analysis Period Equals Project Lives  What to do: Compute the NPW for each project over its life and select the project with the largest NPW.

8 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Projects Requiring Different Levels of Investment Assume that the unused funds will be invested at MARR. This portion of investment will earn a 10% return on investment.

9 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Analysis Period Implied in Comparing Mutually Exclusive Alternatives

10 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 2  Project Lives Longer Than the Analysis Period  What to do o Estimate the salvage value at the end of the required service period. o Compute the NPW for each project over the required service period. o PW(15%) A = −$362 o PW(15%) B = −$364

11 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 3A: Service Projects  Project Lives Shorter than the Analysis Period  What to do o Come up with replacement projects that match or exceed the required service period. o Compute the NPW for each project over the required service period. o PW(15%) A = −$34,359 o PW(15%) B = −$31,031

12 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 3B: Revenue Projects  Analysis Period Coincides with the Project with the Longest Life in the Mutually Exclusive Group  What to do  Compute the NPW of each project over its analysis period, assuming no cash flows after the service life for the shorter-lived project.  PW(15%) Drill = $2,208,470  PW(15%) Lease = $2,180,210

13 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 4  Analysis Period Is Not Specified  What to do o Come up with replacement projects that serve out the least common multiple period (LCM). o Compute the NPW for each project over the LCM. o PW(15%) A = −$53,657 o PW(15%) B = −$48,534

14 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Summary Present worth is an equivalence method of analysis in which a project’s cash flows are discounted to a lump sum amount at the present time. The MARR, or minimum attractive rate of return, is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the net future worth and the capitalized equivalent worth, are variations of the NPW criterion.

15 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved The term mutually exclusive means that when one of several alternatives that meet the same need is selected, the others will be rejected. Revenue projects are those for which the income generated depends on the choice of project. Service projects are those for which income remains the same, regardless of which project is selected. The analysis period (study period) is the time span over which the economic effects of an investment will be evaluated.

16 Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved The required service period is the time span over which the service of equipment (or investment) will be needed. The analysis period should be chosen to cover the required service period. When not specified by management or company policy, the analysis period to use in a comparison of mutually exclusive projects may be chosen by the individual analyst.


Download ppt "Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives."

Similar presentations


Ads by Google