Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e.

Similar presentations


Presentation on theme: "Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e."— Presentation transcript:

1 Ioanis Kourbanis 01/23/13 RR AIP 1

2 Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e experiments. 2

3 Mu2e Beam Requirements Mu2e bunch structure and spill cycle. Bunches narrower than 200 nsec and 1E12 ppb are required. Extractions of Mu2e proton bunches from Recycler. 59 msec between extractions (17Hz); total of 8 extractions per MI cycle ( 1.33 sec) 3

4 G-2 Beam Requirements Proton bunches narrower than 120 nsec (140 nsec is the size of the muon storage Ring) and intensity of 1E12 ppb are required. Extractions of g-2 bunches from Recycler. 10 msec between bunch extractions (100 Hz); 16 bunches per MI cycle (12 Hz). 4

5 Bunch formation in Recycler In order to formulate the proton bunches required from Mu2e/g-2 a total of 80 KV of 2.5 MHz rf is required in the Recycler. A minimum of 90 msec is required for the bunch formation. Current scheme achieves as good or better results than the original scheme by using only one rf system instead of 3(2.5MHz, 5 MHz and barrier rf). The proposed bunch formation scheme was tested in MI using the 2.5 MHz coalescing cavities. Good agreement with simulations. Created 120 nsec long bunches (94.5% of particles). 5

6 6 2.5 Mhz from 3 to 65 kV in 90 ms (94.6% particles inside 120 ns) Simulation: 3-70 KV in 90 msec (95% of particles within 120 nsec) 2.5 Bunches in MI.

7 Scope New 2.5 MHz RF system in Recycler to provide the required beam structure. Will also provide 2 2.5 cavities for mu2e experiment. New RR extraction Kickers to kick the proton beam out of the Recycler. New beam-line to connect Recycler to the existing P1 line. An extension to the MI-52 will be needed to accommodate the new kickers and the kicker cooling skid. (Not a part of this AIP). 7

8 2.5 MHz RF We cannot use the existing MI coalescing cavities because they do not have active cooling. New cavity design with cooling plates between ferrites (9 total cavities). We will re-use the ferrites and PAs from existing coalescing cavities (additional ferrites and PAs will be needed) Coalescing cavities in MI (5 2.5 MHz +1 5.0 MHz) Cross sections of the 2.5 MHz coalescing cavity Coalescing cavity PA 8 40’’ 20”

9 2.5 MHz coalescing cavities In MI 5 2.5 MHz cavities were used to produced ~60 KV of rf for bunch coalescing. Each cavity had a shunt impedance of 50Kohms and a Q of 125. They were only used during shot set-ups and during antiproton transfers from Accumulator to Recycler with an overall duty factor of 0.2% corresponding to an average power dissipation of 4.5 watts/cavity. For g-2/Mu2e the duty factor of the 2.5 MHz cavities will be at least 40% corresponding to 900 watts power dissipation per cavity. A new cavity design with cooling plates between ferrites will be required. 9

10 RR To P1 Beam line P1 Line MI RR Total length 43 m. Simple beam line but located in a very busy area with a lot of interferences. Very challenging installation. Have to shield both Recycler and the new beam line from MI fields. MI-52 Extraction Region 10

11 RR Extraction Kickers Kicker angle1.37 mrad Flattop200 nsec Field Rise Time120 nsec Field Fall Time400 nsec Average Rate12 Hz Burst Rate100 Hz 2 new kicker magnets will be required. The magnets will be of the new RKB style designed for ANU. We are going to re-use the beam tubes from the recently decommissioned Recycler kicker magnets. We are going to re-use the PFLs from the Recycler kickers. Two new 25 Ohm loads capable of up to 250 W average power will be built. A flurinet cooling skid will be used to cool the loads. ANU RKB Kicker Magnet 11

12 WBSNameBase costIndirect costContingencyTotal 1.RR AIP($K)5,883.63,322.82,762.011,968.4 1.01Management24.323.214.361.8 1.02RR RF4,103.62,370.41,942.28,416.2 1.03Extraction Kickers898.5475.3412.21,786.0 1.04RR to P1 Line Stub857.2453.9393.31,704.4 Project Plan We assume installation of the Extraction Kickers and the Beam line Stub in Summer 2014. We assume the 2.5 RR RF in Summer 2015. A 30% contingency has been assumed. 12

13 Funding Profile FY13FY14FY15TOTAL Labor ($K) SWF Base179.01,553.6925.82,658.4 SWF Indirect171.51,500.6919.32,591.4 Subtotal350.53,054.21,845.15,249.8 SWF Contingency105.2916.3553.51,575.0 Total455.73,970.52,398.66,824.8 M&S($K) M&S Base285.02,298.1642.03,225.1 M&S Indirect58.1526.3147.0731.4 Subtotal343.12,824.4789.03,956.5 M&S Contingency102.9847.3236.71,186.9 Total446.03,671.71,025.75,143.4 Total($K) SWF +M&S Base464.03,851.71,567.85,883.5 SWF+M&S Indirect229.62,026.91,066.33,322.8 Subtotal693.65,878.62,634.19,206.3 SWF+M&S Contingency208.11,763.6790.22,761.9 Total901.77,642.23,424.311,968.2 13

14 Labor by Categories CategoryFY13FY14FY15Total Electrical Engineer0.050.670.72 RF Engineer0.152.292.605.04 Electrical Tech.0.153.582.406.13 Mechanical Engineer0.201.910.832.94 Mechanical Tech.4.131.025.15 Mechanical Drafter0.200.760.571.53 Electrical Drafter0.10.240.060.4 Welder0.17 Machinist0.52 Scientist0.350.390.351.09 Project Management0.20 Total1.414.667.83 14


Download ppt "Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e."