Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,

Similar presentations


Presentation on theme: "Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,"— Presentation transcript:

1 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*, K. Schirm, W. Venturini) EN-MME (F. Bertinelli*, O. Capatina, S. Atieh, T. Renaglia, G. Favre, S. Sgobba) TE-MSC (L. Bottura*, V. Parma) TE-VSC (S. Calatroni, M. Taborelli, J.M. Jimenez*) TE-CRG (Laurent TAVIAN*) *Main contact person

2 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 Main Topics Introduction SC RF Organic structure RF Cavity Design, Production & Testing RF Cavity Cryostat Design, Production, Assembly & Testing CERN Expertise & Infrastructures Closing Remarks BE, TE, EN Departments Summarized by José Miguel JIMENEZ 2

3 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 Introduction CERN Objectives & Scope of this review Objective Evaluate and reinforce CERN expertise and infrastructures to stay compatible with the needs of CERN accelerator chain and approved Scientific Strategic Program. Projects like HIE-ISOLDE and Collaborations shall be tuned and used to achieve this challenge. F. Bordry asked us to: Review the list and status of Projects, Studies & Collaborations Review the status of all CERN infrastructures & possible contingencies through collaborations Report on Resources (Personnel & Material) highlighting missing expertise (options of internal mobility and transverse collaborations) and single-point failure. BE, TE, EN Departments Summarized by José Miguel JIMENEZ 3

4 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 Introduction Meetings 24 May – SC RF key players & HIE-ISOLDE PL SC RF strategy and collaboration with INFN Legnaro Erk, Karl, Walter, Mauro, Sergio, Yacine 30 May - SC RF key players & HIE-ISOLDE PL SC RF strategy and collaboration with INFN Legnaro Erk, Karl, Walter, Mauro, Sergio, Yacine (excused) 30 May – EN-MME GL SC RF strategy – Francesco 30 May – BE-RF GL SC RF strategy – Erk 3 June – BE DH SC RF strategy – Paul, Erk 4 June – EN DH SC RF strategy – Roberto, Francesco 6 June – TE-MSC GL SC RF strategy – Luca, Vittorio BE, TE, EN Departments Summarized by José Miguel JIMENEZ 4

5 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 SC RF Organic structure RF Cavity Design, Production & Testing RF Group is the Equipment Owner: RF Design is driven by BE-RF Advice and design by EN-MME for mechanical engineering and manufacturing Advice from TE-VSC for surfaces treatments and coatings RF Production is the responsibility of BE-RF Can decide to go for an inside or outside production Know-how preservation in-house is taken into account for decisions Production includes several prototypes for TE-VSC to validate surface treatments and coatings Responsibility for surfaces treatments & coatings stay with TE-VSC Assembly of cavity in test bench is the responsibility of BE-RF Happens that TE-VSC help in bld252 (assembly) or in SM18 (leak testing) RF testing is the responsibility of BE-RF TE-CRG provides cryogenic facilities and assistance if required BE, TE, EN Departments Summarized by José Miguel JIMENEZ 5

6 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 SC RF Organic structure RF Cavity Cryostat Design, Production, Assembly & Testing What’s changing? (1/3) HIE-ISOLDE TE-MSC to complete the design and manufacturing (including utilities and tooling) with the help of other groups (BE-RF, TE-CRG, TE-VSC and EN-MME) BE-RF to take responsibility for the assembly of the 2 first HIE-ISOLDE modules TE-MSC will be a close partner for the assembly of the first module BE-RF to “fly” alone for the second module in order to get prepared for the future BE-RF to intervene in the future on the module as equipment owner EN-MME to help with all utilities and tooling required for the assembly of the module Responsibility for the next cryostats could be passed to EN-MME Upon decision of BE-RF as Equipment Owner BE, TE, EN Departments Summarized by José Miguel JIMENEZ 6

7 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 SC RF Organic structure RF Cavity Cryostat Design, Production, Assembly & Testing What’s changing? (2/3) SPL TE-MSC to complete the detailed design of the cryostat in collaboration with EN-MME EN-MME to take over for the production of the cryostat and related utilities BE-RF to take responsibility for the assembly of the SPL module EN-MME and TE-MSC will be a close partner for the assembly of this module EN-MME to help with all utilities and tooling required for the assembly of the module BE, TE, EN Departments Summarized by José Miguel JIMENEZ 7

8 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 SC RF Organic structure RF Cavity Cryostat Design, Production, Assembly & Testing What’s changing? (3/3) Crab Cavities EN-MME to take over from TE-MSC for the cryostat design BE-RF to organize all details of this transfer of responsibility and identify urgent milestones includes SPS test bench Nothing is changed for TE-CRG and TE-VSC responsibilities BE-RF to take responsibility for the assembly of the cavity modules EN-MME to help with all utilities and tooling required for the assembly of the module TE-CRG and TE-VSC will stay partners for the assembly and testing phases BE, TE, EN Departments Summarized by José Miguel JIMENEZ 8

9 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 CERN Expertise & Infrastructures Expertise (1/2) Expertise exists but is spread in the 3 Departments of the A&T Sector BE-RF, TE-MSC, TE-VSC, TE-CRG, EN-MME, EN-STI Actions have been taken by: BE-RF to strengthen the SRF Section EN-MME to strengthen the ED/ES Sections Commitments have been taken by: TE-MSC to help with the assembly of the first two HIE-ISOLDE modules TE-VSC to provide Vacuum assistance and give access to the AL40-30 industrial contract (Manpower already defined) TE-CRG to provide Cryogenic expertise and assistance in testing facilities BE, TE, EN Departments Summarized by José Miguel JIMENEZ 9

10 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 CERN Expertise & Infrastructures Expertise (2/2) To stay at the fore front of the SC RF technology, CERN needs: To strengthen the RF expert team for cavity design; the RF Superconducting expertise. To reinforce the coating unit to be able to develop new technologies & processes; To keep the manufacturing expertise (eb welding, brazing, spinning…); To make available the resources for cryostat assembly (disassembly) and RF testing. External Collaborations are important BUT need an overall coordination Priorities shall not be fixed ONLY having Projects in perspective CERN Big picture shall stay the driving line Scientific/Technical cases need to be discussed and SC RF CERN community shall get involved in the discussion of priorities and opportunities BE, TE, EN Departments Summarized by José Miguel JIMENEZ 10

11 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 Closing Remarks Excellent atmosphere in the discussions SC RF priority is understood and the global picture is endorsed Need to have a “Coordinator” and “Coordination body” for the SC RF activities Erk JENSEN has been appointed as Coordinator and Chairman of the Coordination body Proceed to a complete evaluation of the situation Review “the ambitions” of all players and define lines of actions, priorities and resources Chair meetings involving all SC RF players (once/month?) Define the SC RF as seen by BE-RF Steer interactions of Project Leaders with groups in charge of RF WPs Priorities have been recalled LHC Spares / HIE-ISOLDE / HL-LHC Crab / SPL / Others BE, TE, EN Departments Summarized by José Miguel JIMENEZ 11

12 Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 Closing Remarks Decision taken HIE-ISOLDE cryostats BE-RF is equipment owner BE-RF to take over the full responsibility for the assembly of the module TE-MSC to stay fully committed to help BE-RF till the final assembly of the 2 first modules SPL Cryostat BE-RF is the equipment owner TE_MSC and EN-MME to complete the assembly of the first module BE-RF doing activities in cleanrooms TE-MSC helping with the cryostat assembly Sharing of responsibilities for Cryostats in the A&T Sector TE-MSC (TE-MSC is the Equipment Owner) with cryostats that contain superconducting magnets and devices except SC RF cavities TE-CRG (TE-CRG is the Equipment Owner) with cryostats without superconducting materials like distribution boxes EN-MME (BE-RF is the Equipment Owner) With cryostats for SC RF cavities BE, TE, EN Departments Summarized by José Miguel JIMENEZ 12


Download ppt "Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,"