Presentation is loading. Please wait.

Presentation is loading. Please wait.

DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.

Similar presentations


Presentation on theme: "DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change."— Presentation transcript:

1 DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change

2 PHASE 1A  The project consists of 7 total phases 1a thru 3b  Phase 1a  Begins on the east end of the project early 2010, west end begins mid 2010  Phase duration approximately 550 days  Many stages within phase 1a  Major areas of work include: - West end: FM 1709 – SH 26 - TX 121 SB & NB widenings - Managed lanes: Texan Trail – International Pkwy - North east frontage roads - Main Street bridge

3 Main Street Bridge  Work commences March 2010 with asbestos abatement  NORTHGATE COLOR SCHEME for following maps:  BLUE = DETOUR CNST  YELLOW = CURRENT CNST  ORANGE = PREVIOUS CNST

4 4 CONCEPTUAL PHASING

5 5

6 6

7 7

8 8

9 9

10 DFW Connector Traffic Management  Goals of MOT team  Maintain mobility  Cooperation with stakeholders  Safe construction zone  Emergency / incident management  Contacts  Emergency assist  Location (mile) markers  Emergency pullouts  Courtesy patrol


Download ppt "DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change."

Similar presentations


Ads by Google