Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.

Similar presentations


Presentation on theme: "Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS."— Presentation transcript:

1 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS

2 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Topics Introduction –SPS project organisation SPS Primary Access System –INB Constraints –Project & Implications for 2006 (and beyond...) –SPS from CCC PS Primary Access System –Control from CCC / CSA –Long-term plan & constraints PS & SPS Experimental Areas Access System –Ongoing project

3 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Introduction TS-CSE-AAS (all projects) –PS team : R. Bonzano, D. Chapuis –SPS team : M. Grill, R. Villard SPS Projects –SPS Primary system reengineering P. Lienard : Project Leader G. Robin, C. Arimatea – AB/OP collaborators –SPS INB documentation and safety studies E. Manola-Poggioli S. Grau PS Projects –PS  CCC F. Havart, L. Hammouti, O. Ratcliffe, J. Duran-Lopez - AB/OP –(S)PS Experimental Areas H. Nissen, F. Havart

4 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS Access Safety System - INB The SPS is now considered as part of an INB –“Installations Nucléaire de Base” Compliance problem –current SPS Access Safety System is PLC-based Not redundant Does not comply with the major criteria sought by the INB authorities : –Common cause of failure

5 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS Access Safety System Compensatory measures –Phase 1 - 2006 During Run Interlocking of 4 critical access doors in AUG !! Blocking / Condemning all other doors SPS Reengineering –Phase 2 - 2006-2007 shutdown Development of a separate cabled loop to provide redundancy to PLC system (like LHC) Preparing for complete replacement of SPS Access Safety & Access Control Systems –Phase 3 - 2007 and beyond Deploy new access control in a phased manner

6 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days ATTENTION !! Ouverture de cette Porte provoque AUG

7 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days VETO Access VETO Beam

8 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS from CCC Consoles are being put in place as we speak –“Old” LEP consoles (ugly consoles – sorry…) –Will stay until new SPS access system is functional –1 day access interruption to reconnect cables and test Drawing by M. Grill

9 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS from CCC SPS Access system has to be completely re- tested after 1 year of complete shutdown –2 weeks technical verification –3 days final testing before run Operation guidelines shall be given to AB/OP by project team –Patrol before run –Opening of machine

10 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Primary Access Safety System

11 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS from CCC PLC-based safety signals –Key interlocks –Via optical fibres Supervision Hardwired  Virtual –Hardwired console replaced by TIM Virtual console CCC or CSA (not both) –Possibility to delegate to CSA if needed during shutdown –No beam operation possible from CSA Drawing by R. Bonzano

12 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS from CCC Control from CSA since November 2005 Control from CCC planned from 4/Feb/2006 “Genevoise” in MCRTIM Virtual Console in CCC Drawing by R. Bonzano

13 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Primary Access in the Long term PS Access system is an ageing system –Has suffered many modifications and has many layers due to different technology for each modification –Must be replaced soon Not possible to maintain actual system much longer Should be replaced by LHC-type Access Main difficulty –PS has doors not “SAS” or turnstiles –Doors do not guarantee unique passage –Solution Either install “sas” or turnstiles Or accept CCC operator supervision (maybe not acceptable) In any case investment is high but necessary –Risk is high : no PS  no SPS  no LHC beams

14 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Experimental Areas Project to revamp PS Experimental areas has continued –Delayed by the PS CCC project –Implementation objective : AD Experimental area access control for 2006 Run East Hall revamp during 2006-7 shutdown –Extension to SPS if according to need Safety PLC-based system –1 PLC per zone –1 master PLC concentrator per “Super Zone” –Interface by physical pin matrix for zone re-configuration –Documentation available for the moment EDMS URD : 476292, SRD : 478678, ADD : 503535 Accounts for requirements of PS and SPS –can be supervised remotely by the CCC via TIM

15 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Drawing by R. Nunes & Access team

16 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Conclusion CCC –No major problems in sight, but last phase due in the coming weeks SPS Primary –Tight schedule constraints and uncertainties as to SPS Access Control system renovation PS Primary –We have made the last major change (CCC) that will ever be made before renovation is due (S)PS Experimental areas –A project constantly delayed by other projects

17 Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Thank you for your attention Questions? (hopefully answers too…..)