All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.

Similar presentations


Presentation on theme: "All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy."— Presentation transcript:

1 All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy

2

3 Accelerator Operation Summary Calendar Week # 47 NuMI Weekly Integrated Intensity 6.38 E18 protons BNB Weekly Integrated Intensity 5.08 E18 protons NMuon Weekly Integrated Intensity 1.91 E15 protons MTest Weekly Integrated Intensity 6.28 E13 protons Beam Hours To NuMI 146.9 hours Beam Hours To BNB 137.8 hours Beam Hours To NMuon 102.4 hours Beam Hours To MTest 102.4 hours From : November 18, 2013 (0000 hours) To: November 25, 2013 (0000 hours)

4

5 Status /Work Completed/Plans Proton Source – Tuning and Maintenance – Booster access to repair RF – Linac quad failure Main Injector – Tuning and Maintenance – Recycler access revealed leaking MI quad – Q229 Recycler – Commissioning – Access to look at extraction line vacuum valve BNB – Tuning – MI-13 temperature probe installation to monitor 50 meter absorber area NuMI – Tuning – Requesting 2 days of 2e12 this week

6 Status /Work Completed/Plans Switchyard – Tuned extraction and beamline – Looking into spill and controls MTest – Tuning – Experiment T-1041 online – MS2 cooling tower maintenance NMuon – Tuning – NM1/2 access during RR access – NM1 Box SWIC Working, shows profiles

7 Photo by Martin Murphy

8

9 Schedules and Links: Schedule can be accessed from the Operations Home Page – - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule – - http://www-ad.fnal.gov/ops/schedule.htmlhttp://www-ad.fnal.gov/ops/schedule.html