Page 1JSOC Review – 17 March 2005 JSOC 17 March 2005 “Peer” Review Stanford SDP Development Plan Philip Scherrer 650-723-1504.

Similar presentations


Presentation on theme: "Page 1JSOC Review – 17 March 2005 JSOC 17 March 2005 “Peer” Review Stanford SDP Development Plan Philip Scherrer 650-723-1504."— Presentation transcript:

1 Page 1JSOC Review – 17 March 2005 JSOC 17 March 2005 “Peer” Review Stanford SDP Development Plan Philip Scherrer pscherrer@solar.stanford.edu 650-723-1504 Schedule and effort levels and development sequence Staffing Organization Chart for JSOC system IT security plan, Configuration management and change controlIT security plan, Configuration management and change control Future SU HMI & JSOC Facility

2 Page 2JSOC Review – 17 March 2005 JDAT Overview Schedule

3 Page 3JSOC Review – 17 March 2005 Development & Test Plans and Schedule HMI and AIA Data EGSE installed –Prototype for I/F testing with GSMar, 2005 onward –Version 2 to support flight inst.June 2005 JSOC Capture System –Purchase computersSummer 2006 –Support DDS testingFall 2006 –Final system installedSpring 2007 JSOC SDP Infrastructure, SUMS, DRMS, PUI –Prototype testing of core systemJune 2005 –Fully functionalDec, 2005 Purchase computers for JSOC Jan, 2007 Infrastructure Operational April, 2007 Data Product Modules Jan, 2008 Test in I&T and with DDS,MOC as called for in SDO Ground System schedule

4 Page 4JSOC Review – 17 March 2005 SDO/HMI – Stanford Personnel Phil Scherrer HMI Principal Investigator Jesper Schou HMI Instrument Scientist Rock Bush HMI-Stanford Prg. Mgr. Romeo Durscher Admin Sasha Kosovichev HMI Science Coord Phil Scherrer Acting JSOC Data Lead Alan Title AIA Principal Investigator Larry Springer HMI-AIA Prg. Mgr. Jerry Drake Inst. Software Lead LMSAL Barbara Fischer HMI Deputy Prg.Mgr. Jim Lemen JSOC Ops Lead Yang Liu Magnetic Field Science Millie Chethik Admin Support Carl Cimilucca JSOC System Engineer Keh-Cheng Chu JSOC Hardware TBD System Support Jim Aloise JSOC Software Jeneen Sommers Database & GUI Hao Thai Data Operations Rasmus Larsen Processing & Analysis Sebastien Couvidat Sci Prog Support Rick Bogart Data Export Karen Tian VSO Access TBD Sci Programmer

5 Page 5JSOC Review – 17 March 2005 Stanford JSOC Effort Level Budget HMI AIA SOC Pre-Launch FY2004FY2005FY2006FY2007FY2008 5/1/04 - 9/30/04 10/1/04 - 09/30/05 10/1/05 - 09/30/06 10/1/06 - 09/30/07 10/1/07 - 5/30/08 Salaries (FTE rate) WBS 1.1 Program Management1.361.80 WBS 1.2 Science Development0.760.832.553.453.15 WBS 1.3 Instrument Development1.401.080.530.150.10 WBS 1.4 Integration and Test Support0.000.831.712.132.10 WBS 1.5 Ground Data System Development1.311.943.054.184.45 WBS 1.6 SU Pre-Launch Science OPS & Data0.521.161.912.913.15 WBS 1.7 JSOC Management0.080.20 WBS 1.8 JSOC Development0.220.530.930.88 WBS 1.9 JSOC Science Data Preperation0.000.300.40 WBS 4.3 AIA Education and Public Outreach0.080.200.30 Stanford Total 5.748.8513.3816.3916.53 JSOC Total1.833.365.897.968.48

6 Page 6JSOC Review – 17 March 2005 JSOC Effort Plan by SubTask

7 Page 7JSOC Review – 17 March 2005 Configuration Management & Control Capture System –Managed by JSOC CCB –Controlled in CVS SUMS, DRMS, PUI, etc. Infrastructure –Managed by JSOC CCB after launch –Controlled in CVS PUI Processing Tables –Managed by HMI and/or AIA Instrument Scientist –Controlled in CVS Level 0,1 Pipeline Modules –Managed by HMI and/or AIA Instrument Scientist –Controlled in CVS Science Analysis Pipeline Modules –Managed by program author –Controlled in CVS

8 Page 8JSOC Review – 17 March 2005 Security: Physical and IT Stanford JSOC facility location TBD, need date Jan 2007 Capture System in isolated room –Room access limited to essential personnel –Firewall to Pipeline system –Computer access limited to essential personnel Pipeline computers –Room access limited to JSOC personnel –password protected –Firewalls to outside

9 Page 9JSOC Review – 17 March 2005 Likely new location for Solar Observatories Group Possible location for Stanford Solar Group – Polya Hall, first floor. The second floor is also available. The combined building is c. 13000 nasf. We need about 7000. Turing Auditorium Possible data center

10 Page 10JSOC Review – 17 March 2005 HMI - SOC Pipeline HMI Data Analysis Pipeline Doppler Velocity Heliographic Doppler velocity maps Tracked Tiles Of Dopplergrams Stokes I,V Filtergrams Continuum Brightness Tracked full-disk 1-hour averaged Continuum maps Brightness feature maps Solar limb parameters Stokes I,Q,U,V Full-disk 10-min Averaged maps Tracked Tiles Line-of-sight Magnetograms Vector Magnetograms Fast algorithm Vector Magnetograms Inversion algorithm Egression and Ingression maps Time-distance Cross-covariance function Ring diagrams Wave phase shift maps Wave travel times Local wave frequency shifts Spherical Harmonic Time series To l=1000 Mode frequencies And splitting Brightness Images Line-of-Sight Magnetic Field Maps Coronal magnetic Field Extrapolations Coronal and Solar wind models Far-side activity index Deep-focus v and c s maps (0-200Mm) High-resolution v and c s maps (0-30Mm) Carrington synoptic v and c s maps (0-30Mm) Full-disk velocity, v(r,Θ,Φ), And sound speed, c s (r,Θ,Φ), Maps (0-30Mm) Internal sound speed, c s (r,Θ) (0<r<R) Internal rotation Ω(r,Θ) (0<r<R) Vector Magnetic Field Maps HMI Data Data ProductProcessing Level-0 Level-1

11 Page 11JSOC Review – 17 March 2005 Pipeline Program, “module” Record Manage ment Keyword Access Data Access DRMS Library Link Manage ment Utility Libraries JSOC Science Libraries Record Cache JSOC Pipeline Processing System Components Database Server SUMS Storage Unit Management System DRMS Data Record Management System SUMS Tape Farm SUMS Disks PUI Pipeline User Interface Pipeline processing plan Processing script, “mapfile” List of pipeline modules with needed datasets for input, output Pipeline Operato r Processing History Log

12 Page 12JSOC Review – 17 March 2005 Five Kinds of Users