© Siemens Energy, Inc. 2008 Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.

Similar presentations


Presentation on theme: "© Siemens Energy, Inc. 2008 Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009."— Presentation transcript:

1 © Siemens Energy, Inc. 2008 Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009

2 Page 2 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Topics o Background o Responsibilities of CIM Model Manager o WG 13 CIM Roadmap o CIM Issues Process o CIM Versioning o Recent CIM Changes o CIM Priorities for 2009

3 Page 3 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Background Background o Prior to the formation of the CIM Users Group in 2005, the CIM UML model was passed between volunteers from WG 13 and 14 to make necessary changes o To assist with the establishment of the CIM Users Group, Siemens, ABB, and Areva agreed to fund the position of CIM Model Manager for the first three years.  2006 - Kurt Hunter, Siemens  2007 – Lars-Ola Osterlund, ABB  2008 – Kendall Demaree, Areva oFor 2009, Siemens agreed to fund the position again.

4 Page 4 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Responsibilities of CIM Model Manager Responsibilities of CIM Model Manager o Manage and maintain the integrated CIM UML model o Coordinate model changes with WG 14 and WG 16 o Manage the CIM issues list o Facilitate WG 13 Issues discussions o Produce the IEC 61970-301 document o Assist CIM UG in answering questions from users o Report to WG 19 and other IEC working groups

5 Page 5 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report WG 13 CIM Roadmap WG 13 CIM Roadmap o WG 13 Part 301 is on a yearly release cycle. o WG 13 CIM Roadmap provides an overview of planned and completed CIM UML model changes. o Serves as the main driver, in addition to CIM issues, behind changes to the CIM UML model.

6 Page 6 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report WG 13 CIM Roadmap Version131415 Profile DraftJune 2008May 2009May 2010 TestIOP October 2008 IOP September 2009 IOP September 2010 ReleaseQ1 2009Q1 2010Q1 2011 Addresse d Issues OWL meta data Tools, EA transition CIM Issues CIM for planning ERCOT issues Operational limits 61968 integration Dynamics Models DC models CIM Issues Multiple inheritance Datatypes OWL meta data Solution exchange CIM Issues Contextual models 2009 WG 13 CIM Roadmap

7 Page 7 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report WG 13 CIM Roadmap Typical Yearly Cycle Plan

8 Page 8 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues for 2009 CIM 2009 Planned Yearly Cycle 2009 Jan FebMarAprMayJunJulAugSepOctNovDec 2010 CPSM Interoperability Test Dynamics Interoperability Test UCTE Interoperability Test Finalize UML And Produce CIM 14 Release Resolve Issues from Interoperability Tests

9 Page 9 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process CIM Issues UML Model and Profile Changes Interoperability Tests

10 Page 10 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process CIM Issues Process consists of three primary components: o Issues Submission o Issues Resolution o Issues Tracking

11 Page 11 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission CIM Issues Submission o In the past issues have been written second hand from information in emails, discussions at Interop Tests, etc. o Consequently, issues that could not be resolved quickly are frequently difficult to interpret when coming back to them. o Currently requiring issues to be written by the submitter, preferably using the CIM Users Group website.

12 Page 12 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission CIM Users Group Website: http://cimug.ucaiug.org

13 Page 13 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission Model Issues Summary

14 Page 14 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission Submitting a New Issue

15 Page 15 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission New Issue Submission Form

16 Page 16 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission Tips for CIM Issues Submission o Be as specific and detailed as possible. o If possible, include a detailed proposed resolution to the issue. A UML model or UML class diagram can be submitted with the issue as an attachment. o For proposed model extensions include a detailed use case. o Review the CIM issues spreadsheet before submitting to determine is the issue has been submitted previously.

17 Page 17 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission CIM Naming Rules*: o Class names are UpperCamelCase (GeneratingUnit). o Attribute names are lowerCamelCase (raiseRampRate). o Association role names are UpperCamelCase. o Association role names are required, but association names are not. o Names shall be singular unless the concept is plural. o Names shall not include a unit name (“ratedVoltage”, not “ratedKV”). o Attribute names shall not include the class name. *(sample list, not exhaustive)

18 Page 18 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission CIM Naming Rules (cont’d)*: o Use of abbreviations is allowed, but not recommended. o Acronyms can be used, but the expanded terms must be included in the definition. o Association role names should use the corresponding end side class as the base role name. *(sample list, not exhaustive)

19 Page 19 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Submission CIM Issues Spreadsheet includes fields for: o Working Group (WG 13, WG 14, WG 16 or combined) o Issue No. (Unique # assigned by CMM) o Author / Contact Information o Date Submitted o Package (Wires, Core, Assets, etc.) o Description of Issue o Proposed Resolution o Decision o Person Assigned o Due Date Status

20 Page 20 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Resolution CIM Issues Resolution o Simple issues may be resolved by the CMM and then sent to WG 13 members for approval. o More complex issues will be discussed during WG 13 and WG 14 CIM issues conference calls. Resolution of an issue may be reached during calls or may be deferred to the next WG 13 or WG 14 meeting. o Complex or controversial issues will be discussed face to face at WG 13 and WG 14 meetings. o All WG 13 CIM changes are tracked in a spreadsheet.

21 Page 21 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Resolution CIM Changes Spreadsheet includes fields for: o Change Number (assigned by CMM) o Action (New, Change, Delete) o Package (Wires, Core, etc.) o Subject (Affected class, attribute, or association) o Subject Type (Class, Attribute, or Association) o Description o Issue Reference Number (from CIM Issues List) o New CIM Revision o Author o Date of Change o Comments

22 Page 22 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues Process - Resolution CIM Changes Spreadsheet Sample

23 Page 23 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues - 2009 CIM Issues – 1416 issues (WG 13 and 14) since 2000 WG 13WG 14Combined 2023240 New Issues Since Jan. 2009 Open Issues - Jan. 2009 WG 13WG 14Combined 3011027 Open Issues - Nov 2009 WG 13WG 14Combined 1024329

24 Page 24 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning Version names include both the major CIM version number and the working (minor) version number. In iec6197014v04: o CIM version number is 14 o Working version is 4

25 Page 25 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning Versioning is maintained in both the UML model content and the model file name. File name example: iec61970cim14v04_iec61968cim10v21_combined.eap WG 13 CIM Version WG 14 CIM Version Enterprise Architect UML of combined WG 13 / WG 14 models

26 Page 26 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning The UML package IEC61968 includes class IEC61968CIMVersion. Attribute IEC61968CIMVersion.date = 2009-03-01 Attribute IEC61968CIMVersion.version = IEC61968CIM10v21 The UML package IEC61970 includes class IEC61970CIMVersion. Attribute IEC61970CIMVersion.date = 2009-02-27 Attribute IEC61970CIMVersion.version = IEC61970CIM14v04

27 Page 27 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Versioning CIM Version Attributes

28 Page 28 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Recent Major CIM UML Model Changes o Mutual Coupling o State Variables (exchange of solved cases) o Equivalents o Wind Generating Unit o Tap Changers, Schedules, and Curves o Switch Schedule o Compound Data Types o Company (class deleted) o Load Model (subtypes removed) o Informative Package

29 Page 29 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Mutual Coupling

30 Page 30 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes State Variables (Solution Exchange)

31 Page 31 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes State Variables (Solution Exchange)

32 Page 32 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Equivalents

33 Page 33 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Wind Generating Unit

34 Page 34 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Tap Changers, Schedules, and Curves

35 Page 35 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Switch Schedule

36 Page 36 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Compound Data Types

37 Page 37 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Load Model Removed subtypes of ConformLoad and NonConformLoad  Load  CustomerLoad  InductionMotorLoad

38 Page 38 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report Recent CIM Changes Informative Package Added new package "Informative" to contain non-standardized packages outside the scope of 61970 and 61968. Contains packages:  EnergyScheduling  Financial  MarketOperations  Reservation

39 Page 39 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CMM Report CIM Issues for 2009 CIM Issues/Priorities for 2009 oUCTE Exchange Support oState Variable oDisplay Layout Exchange oHVDC Modeling oEPRI CIM-for-Planning Dynamics Models oOld Issue Clean-up oEquivalents Enhancements oLoad Model Clean-up WG13/14 oMultiple Inheritance oCompound Datatypes oWG16 Integration

40 Page 40 Copyright © Siemens Energy, Inc. 2008. All rights reserved. CIM Model Manager Report Questions? kurt.hunter@siemens.com


Download ppt "© Siemens Energy, Inc. 2008 Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009."